921 Washington Ave
Brooklyn, NY 11225
921 Washington Avenue is an elevator building with 78 apartments, built in 1928. It has 14 open violations, 8 of them Class C, immediately hazardous. The oldest open HPD violation was filed on March 17, 2008.
En español: 8 violaciones de Clase C abiertas (peligro inmediato) y 14 abiertas en total. La más antigua del HPD lleva 18 años abierta, desde el 17 de marzo de 2008.
Open now, most hazardous first
- 8Get these certified
Class C, immediately hazardous, filed in the last 3 years
- 5See the 5
Class B, hazardous, filed in the last 3 years
- 1See it
OATH/ECB summons still active
1.0 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.
Since November 27, 2023, certifications were filed on 6 Class C violations, all 6 by the original certify-by date. How certification works
The original certify-by dates on the 13 open HPD violations have all passed. The latest was June 3, 2026.
- Zoning district
- R8A
- Lot area
- 19,947 sq ft
- Floor area
- 80,500 sq ft
- Last transfer
- No price recorded
- Tax lot (BBL)
- 3-01190-0001
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 8 open | ||
| Notice sent | 18792733 | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective glass pane at lower sash, 1st window from west at north in the 1st room from east at north | |||
| Notice sent | 18792729 | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective spring balance at lower sash, 1st from south at west in the 1st room from east at north | |||
| Notice sent | 18792728 | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective spring balance at lower sash, 2nd from south at west in the 1st room from east at south | |||
| Notice sent | 18792725 | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective spring balance at lower sash, fire escape window in the 1st room from east at south | |||
| No access to reinspect (first try) | 18542703 | ||
| § 27-2026 ADM CODE Repair the broken or defective connection at supply line under sink in the kitchen | |||
| No access to reinspect (first try) | 18525236 | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective counterbalance at lower sash at fire escape window in the kitchen | |||
| No access to reinspect (first try) | 18525235 | ||
| § 27-2005 ADM CODE Properly secure the loose electrical outlet at south wall in the 2nd room from north | |||
| No access to reinspect (first try) | 18525234 | ||
| § 27-2026 ADM CODE Repair the broken or defective connection at wasteline under sink in the kitchen | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 5 open | ||
| Notice sent | 18792732 | ||
| Notice sent | 18792730 | ||
| Notice sent | 18792726 | ||
| No access to reinspect (first try) | 18525233 | ||
| No access to reinspect (first try) | 18525232 | ||
| OATH/ECB | 1 open | ||
| Construction, Class 3 | Found in violation | 39120554L | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2017 to 2026, HPD filed 483 violations and closed 513, all classes.
Year Filed Closed 2026 17 14 2025 12 15 2024 19 18 2023 19 137 2022 143 81 2021 58 127 2020 123 5 2019 52 57 2018 15 23 2017 25 36 - Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed July 8, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 27, 2023: a general construction order, opened February 26, 2026, awarded for $345. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH/ECB summonses
- 10 DOB summonses here since January 1, 2019, with $8,750 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 2 judgments docketed, the latest on September 30, 2022. A docketed judgment shows up in a title search.
- August 1, 2024, DOB: Fence exceeds permitted height. In violation, $500 penalty imposed.
- January 15, 2022, DOB: Failure to maintain building in code-compliant manner. Decided by default, $3,125 penalty imposed.
- August 12, 2020, DOB: Failure to properly connect conductors to terminals. In violation, $600 penalty imposed.
The newest 3 of 10 summonses OATH lists here.
- Housing court
- 20 housing court cases here since 2006, most of them tenant actions. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB complaints
- 2 DOB complaints in the last 12 months, 1 of them a conversion complaint. The newest was filed April 24, 2026. A conversion complaint, like any complaint, is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 99 DOB complaints from 1995 through November 25, 2026. 49 DOB violations since 1989, 39 resolved and 10 dismissed in DOB's records.
- DOB permits
- DOB NOW lists 9 work permits here, the newest issued April 29, 2021, for Structural work.
- Structural, issued April 29, 2021, signed off.
- Mechanical Systems, issued January 15, 2021, signed off.
- Plumbing, issued January 15, 2021, signed off.
The newest 3 of 9 permits DOB NOW lists here.
- Boiler inspection
- Inspected March 5, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 6 other open violations this page lists without it.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 1,835 Brooklyn buildings with 50 to 99 apartments.
- All 9 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 10 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.