525 Monroe St, Brooklyn
- Built
- 1931
- Floors
- 4
- Residential units
- 5
- Building type
- Residence with stores or offices
- Zoning district
- R6B
- Lot area
- 2,400 sq ft
- Floor area
- 7,368 sq ft
- Last sale
- $1,475,000
En español: 3 violaciones de Clase C abiertas (peligro inmediato) y 7 abiertas en total. La más antigua del HPD lleva 8 años abierta, desde el 13 de septiembre de 2018.
Open now, most hazardous first
- 3Get these certified
Class C, immediately hazardous
- 4See the 4
Class B, hazardous
Open violations are sitting, with little movement either way. 3 open Class C, with nothing filed or new in the last 180 days.
The original certify-by dates on the 7 open HPD violations have all passed. The latest was July 28, 2025. The report prints the date beside each one.
- OATH/ECB summonses
- 1 DOB summons here since January 1, 2019, with $3,125 in penalties imposed. 1 judgment docketed, on March 31, 2021. A docketed judgment shows up in a title search.
- July 30, 2020, DOB: Failure to maintain building walls or appurtenances. Decided by default, $3,125 penalty imposed.
- DOF tax lien sale
- Listed for DOF's 2025 tax lien sale, for water and sewer charges only. The last list it appeared on was the 90-day notice of February 2025.
- DOB violations
- 3 active DOB violations. The newest was issued June 25, 2025.
- DOB complaints
- 3 DOB complaints in the 12 months to September 25, 2026. The newest was filed June 16, 2026.
- DOB permits
- DOB NOW lists 4 work permits here, the newest issued September 10, 2025, for General Construction work.
- General Construction, issued September 10, 2025, signed off.
- Sidewalk Shed, issued August 22, 2025, signed off.
- General Construction, issued March 7, 2022, signed off.
The newest 3 of 4 permits DOB NOW lists here. The report lists all 4, with job numbers and each job's estimated cost. What the report adds
- Boiler inspection
- Inspected November 14, 2025.
- Bedbug report
- Filed May 12, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- HPD emergency repair orders
- 2 completed HPD emergency repair orders since October 12, 2023, awarded for $4,276 in total. The most recent of the 2, a general construction order, was opened July 3, 2025.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 3 open | ||
| Fire Safety | Notice sent | 17940115 | |
| Notice sent | 17679784 | ||
| Vermin / Infestation | Notice sent to tenant | 17679780 | |
| Class B | 4 open | ||
| Notice sent | 17940119 | ||
| Fire Safety | Notice sent | 17940116 | |
| Invalid certification | 17679782 | ||
| Invalid certification | 17679779 | ||
The full report on 525 Monroe St, Brooklyn
- All 7 open violations, each with the city's own words and the date on its notice.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 223,260 Brooklyn buildings with 1 to 5 apartments.
- All 4 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 1 DOB summons at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.
Get the report on 525 Monroe St, Brooklyn, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.