98 Moore St, Brooklyn
- Built
- 1931
- Floors
- 4
- Residential units
- 10
- Building type
- Walk-up building
- Zoning district
- R6
- Lot area
- 2,500 sq ft
- Floor area
- 7,500 sq ft
- Last sale
- $2,100,000
En español: 2 violaciones de Clase C abiertas (peligro inmediato) y 6 abiertas en total. La más antigua del HPD lleva 7 años abierta, desde el 6 de diciembre de 2018.
Open now, most hazardous first
- 2Get these certified
Class C, immediately hazardous
- 1See it
Class B, hazardous
- 3See the 3
OATH/ECB summonses still active. Most often Construction.
Open violations are sitting, with little movement either way. 2 open Class C, with 2 certifications filed and 2 new Class C in the last 180 days, too few to call a direction.
Since October 12, 2023, certifications were filed on 4 Class C violations, all 4 by the original certify-by date. HPD now marks 1 of them Invalid Certification. How certification works
The original certify-by dates on the 3 open HPD violations have all passed. The latest was September 23, 2026. The report prints the date beside each one.
- OATH hearings
- 3 hearings scheduled on DOB summonses, the first on November 18, 2026.
- OATH/ECB summonses
- 8 DOB summonses here since January 1, 2019, with $17,400 in penalties imposed. 3 of them are still active, the same 3 listed under OATH/ECB. 4 judgments docketed, the latest on August 31, 2023. A docketed judgment shows up in a title search.
- September 16, 2026, DOB: Fail to maintain required number of means of egress for every floor. $2,500 penalty imposed.
- September 16, 2026, DOB: Failure to maintain building in code-compliant manner. $2,500 penalty imposed.
- September 9, 2026, DOB: Failure to provide unobstructed exit passageway. $2,500 penalty imposed.
The newest 3 of 8 summonses OATH lists here. The report lists all 8, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB complaints
- 4 DOB complaints in the 12 months to September 25, 2026. The newest was filed September 22, 2026.
- DOB permits
- DOB NOW lists 4 work permits here, the newest issued May 8, 2023, for General Construction work.
- General Construction, issued May 8, 2023, expired November 2, 2023.
- Plumbing, issued November 30, 2022, signed off.
- Sprinklers, issued June 29, 2022, signed off.
The newest 3 of 4 permits DOB NOW lists here. The report lists all 4, with job numbers and each job's estimated cost. What the report adds
- Certificate of occupancy
- Final, issued October 3, 2023.
- Bedbug report
- Filed December 3, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 2 open | ||
| Invalid certification | 19206118 | ||
| Certified on time | 19206117 | ||
| Class B | 1 open | ||
| Notice sent | 17763051 | ||
| OATH/ECB | 3 open most often Construction | ||
| Construction, Class 1 | Hearing pending | 39204939K | |
| Construction, Class 1 | Hearing pending | 39204938Z | |
| Construction, Class 1 | Hearing pending | 35686098Y | |
The full report on 98 Moore St, Brooklyn
- All 6 open violations, each with the city's own words and the date on its notice.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 19,339 Brooklyn buildings with 6 to 19 apartments.
- All 4 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 8 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 3 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 98 Moore St, Brooklyn, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.