Skip to content
ViolationScout24 certifications filed against 2 new Class C in the last 180 days.Is this your building?
Buildings320 Vanderbilt Avenue, Staten IslandCurrent through

320 Vanderbilt Ave, Staten Island

BBL 5-02871-0001

En español: 12 violaciones de Clase C abiertas (peligro inmediato) y 24 abiertas en total. La más antigua del HPD lleva 4 años abierta, desde el 28 de septiembre de 2021.

Certifications are being filed faster than new violations come in. 24 certifications filed against 2 new Class C in the last 180 days.

The oldest open HPD violation has been open 4 years, since September 28, 2021.

Since September 29, 2023, certifications were filed on 18 Class C violations, all 18 by the original certify-by date. HPD now marks 3 of them False Certification. How certification works

Is this your building?

12 open Class C, 2 OATH hearings starting October 7, 2026, and a facade rated SWARMP. The oldest open HPD violation was filed September 28, 2021.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

OATH hearings
2 hearings scheduled on DOB summonses, the first on October 7, 2026.
DOB violations
10 active DOB violations, most of them for elevators. The newest was issued November 14, 2025.
DOB complaints
3 DOB complaints in the 12 months to September 25, 2026. The newest was filed June 10, 2026.
DOB facade
Rated SWARMP in the latest facade report, filed June 26, 2025 (inspection cycle 10). SWARMP means safe with a repair and maintenance program. Need this filed?
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Boiler inspection
2 boilers, both inspected in 2026, the latest on April 27. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed for its 3 buildings by January 21, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C12 open most often Vermin / Infestation
Fire SafetyFalse certification19083505HP Fox Hill Housing
Vermin / InfestationNotice sent to tenant19045377HP Fox Hill Housing
Vermin / InfestationTo be reinspected18704493HP Fox Hill Housing
Vermin / InfestationTo be reinspected18704492HP Fox Hill Housing
To be reinspected18704491HP Fox Hill Housing
Notice sent17977069
Vermin / InfestationFalse certification17886191
Vermin / InfestationFalse certification17886190
Vermin / InfestationTo be reinspected17429307
Vermin / InfestationTo be reinspected16951365
The report lists all 12, each with the city's own words and the date on its notice. What the report adds
Class B9 open
To be reinspected19083506HP Fox Hill Housing
To be reinspected19083503HP Fox Hill Housing
MoldTo be reinspected19072343HP Fox Hill Housing
False certification17749952
Notice sent17606552
Vermin / InfestationTo be reinspected17429306
Notice sent16879105
Notice sent16879104
Fire SafetyNotice sent16879103
OATH/ECB3 open most often Construction
Elevators, Class 2Hearing pending39197909RHP Fox Hill Housing
Construction, Class 2Hearing pending39192547XHP Fox Hill Housing
Construction, Class 1Decided by default35685602J

The full report on 320 Vanderbilt Ave, Staten Island

Get the report on 320 Vanderbilt Ave, Staten Island, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Nearby buildings

Questions about this building

Does 320 Vanderbilt Avenue, Staten Island have open violations?

Yes. 320 Vanderbilt Avenue, Staten Island had 24 open violations on September 27, 2026: 3 from OATH/ECB and 21 from HPD. 12 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 4 years, since September 28, 2021.

Is 320 Vanderbilt Avenue, Staten Island getting better or worse?

Certifications are being filed faster than new violations come in. 24 certifications filed against 2 new Class C in the last 180 days. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 320 Vanderbilt Avenue, Staten Island?

Since September 29, 2023, certifications were filed on 18 Class C violations, all 18 by the original certify-by date. HPD now marks 3 of them False Certification. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 320 Vanderbilt Avenue, Staten Island have an OATH hearing coming up?

Yes. 2 hearings scheduled on DOB summonses, the first on October 7, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 320 Vanderbilt Avenue, Staten Island have active DOB violations?

Yes. 10 active DOB violations, most of them for elevators. The newest was issued November 14, 2025. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has DOB received complaints about 320 Vanderbilt Avenue, Staten Island?

Yes. 3 DOB complaints in the 12 months to September 25, 2026. The newest was filed June 10, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

What did the latest facade report find at 320 Vanderbilt Avenue, Staten Island?

Rated SWARMP in the latest facade report, filed June 26, 2025 (inspection cycle 10). SWARMP means safe with a repair and maintenance program. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

When was the boiler at 320 Vanderbilt Avenue, Staten Island last inspected?

It has 2 boilers, both inspected in 2026, the latest on April 27. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 320 Vanderbilt Avenue, Staten Island last file its bedbug report?

Its 3 buildings had all filed by January 21, 2026, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 320 Vanderbilt Avenue, Staten Island covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 320 Vanderbilt Avenue, Staten Island rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 320 Vanderbilt Avenue, Staten Island built?

The city's record gives 1965 as the year 320 Vanderbilt Avenue, Staten Island was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 6 floors.

How many apartments does 320 Vanderbilt Avenue, Staten Island have?

The Department of City Planning's PLUTO tax-lot file lists 361 residential units at 320 Vanderbilt Avenue, Staten Island. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH hearing dates, DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH hearing dates, DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 320 Vanderbilt…, Staten Island: violations, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/320-vanderbilt-avenue-staten-island

How we count: /method.

Is this your building?