328 Empire Blvd
Brooklyn, NY 11225
328 Empire Boulevard is a building with stores or offices and 2 apartments, built in 1925. It has 29 open violations, 8 of them Class C, immediately hazardous. The oldest open HPD violation was filed on February 25, 2025.
En español: 8 violaciones de Clase C abiertas (peligro inmediato) y 29 abiertas en total. La más antigua del HPD lleva 21 meses abierta, desde el 25 de febrero de 2025.
Open now, most hazardous first
- 8Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.
- 21See the 21
Class B, hazardous, filed in the last 3 years. Most often Vermin / Infestation.
Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.
The original certify-by dates on the 29 open HPD violations have all passed. The latest was January 14, 2026.
- Zoning district
- R7-1
- Lot area
- 1,642 sq ft
- Floor area
- 2,955 sq ft
- Tax lot (BBL)
- 3-01315-0039
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 8 open most often Lead Paint | ||
| Lead Paint | Notice sent | 18465491 | |
| § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six | |||
| Lead Paint | Notice sent | 18465077 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from east at south wall door frame in the 1st room from north | |||
| Lead Paint | Notice sent | 18465076 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) north wall, east wall in the 1st room from north | |||
| Lead Paint | Notice sent | 18465075 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) west wall in the private hallway | |||
| Lead Paint | Notice sent | 18465074 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) east wall in the 4th room from north at west | |||
| Lead Paint | Notice sent | 18465073 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame, north wall, east wall, 1st window frame from south at west wall in the foyer | |||
| Lead Paint | Notice sent | 18465072 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from east at south wall in the 2nd room from north | |||
| Lead Paint | Notice sent | 18465071 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st window frame from east at south wall in the 2nd room from north | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 21 open most often Vermin / Infestation | ||
| Notice sent | 18441546 | ||
| Vermin / Infestation | Notice sent | 18441544 | |
| Vermin / Infestation | Notice sent | 18441543 | |
| Notice sent | 18441542 | ||
| Notice sent | 18441541 | ||
| Notice sent | 18441540 | ||
| Notice sent | 18441526 | ||
| Notice sent | 17719744 | ||
| Notice sent | 17719743 | ||
| Notice sent | 17719742 | ||
| Notice sent | 17719739 | ||
| Notice sent | 17719738 | ||
| Notice sent | 17719737 | ||
| Notice sent | 17719736 | ||
| Notice sent | 17719735 | ||
| Notice sent | 17719734 | ||
| Notice sent | 17719733 | ||
| Notice sent | 17719732 | ||
| Notice sent | 17719730 | ||
| Notice sent | 17719729 | ||
| Vermin / Infestation | Notice sent | 17719727 | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
Hearings and penalties
- OATH/ECB summonses
- 1 FDNY summons here since January 1, 2019, with $2,000 in penalties imposed.
- September 15, 2026, FDNY: Certificates of fitness and certificates of qualification. Decided by default, $2,000 penalty imposed.
DOB records
- DOB, all years
- 1 DOB complaint from 2007 through November 25, 2026.
The building report
- The city's wording on the 21 other open violations this page lists without it.
- What the one city status here means, and how many of these carry it.
- How it compares with the 223,273 Brooklyn buildings with 1 to 5 apartments.
- All 1 FDNY summons at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.