3340 Broadway
Manhattan, NY 10031
3340 Broadway is an elevator building with 36 apartments, built in 1909. It has 23 open violations, 18 of them Class C, immediately hazardous. The oldest open HPD violation was filed on November 26, 2016.
En español: 18 violaciones de Clase C abiertas (peligro inmediato) y 23 abiertas en total. La más antigua del HPD lleva 9 años abierta, desde el 26 de noviembre de 2016.
Open now, most hazardous first
- 18Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.
- 4See the 4
Class B, hazardous, filed in the last 3 years
- 1See it
OATH/ECB summons still active
5.0 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. 1 certification filed and 8 new Class C in the last 180 days, too few to call a direction.
Since November 16, 2023, certifications were filed on 13 Class C violations, all 13 by the original certify-by date. How certification works
The original certify-by dates on the 22 open HPD violations have all passed. The latest was October 27, 2026.
- Zoning district
- R8
- Lot area
- 11,990 sq ft
- Floor area
- 56,379 sq ft
- Tax lot (BBL)
- 1-01988-0074
- Neighborhood
- Manhattanville-West Harlem
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 18 open most often Lead Paint | ||
| Lead Paint | Notice sent | 19260431 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5MG/CM2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 RCNY §11-07(B)) using work practices set forth in 28 RCNY §11-06(B)(2). 1st door from west at north wall, 1st window frame from east at south wall in the 3rd room from east at south | |||
| Lead Paint | Notice sent | 19260430 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from west at north wall in the 3rd room from east at south | |||
| Lead Paint | Notice sent | 19260429 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5MG/CM2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 RCNY §11-07(B)) using work practices set forth in 28 RCNY §11-06(B)(2). 2nd window frame from west at north wall in the 2nd room from east at north | |||
| Lead Paint | Notice sent | 19260428 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the 2nd room from east at north | |||
| Lead Paint | Notice sent | 19260427 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) west wall in the kitchen | |||
| Lead Paint | Notice sent | 19260425 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5MG/CM2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 RCNY §11-07(B)) using work practices set forth in 28 RCNY §11-06(B)(2). 1st door frame from west at north wall in the bathroom | |||
| Lead Paint | Notice sent | 19260424 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) south wall, east wall in the bathroom | |||
| Vermin / Infestation | Notice sent to tenant | 19186360 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| Lead Paint | Defect letter sent | 17921741 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) north wall in the 6th room from east | |||
| Lead Paint | Defect letter sent | 17921740 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) north wall in the foyer | |||
| Lead Paint | Defect letter sent | 17921739 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) ceiling in the kitchen | |||
| Lead Paint | Defect letter sent | 17921738 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) ceiling in the 4th room from east | |||
| Lead Paint | Defect letter sent | 17921737 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) north wall in the bathroom | |||
| Lead Paint | Defect letter sent | 17921736 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) north wall in the 1st room from east | |||
| Lead Paint | Defect letter sent | 17776169 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) west wall in the 3rd room from east | |||
| Lead Paint | Defect letter sent | 17271696 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from north at east wall in the 3rd room from east | |||
| Lead Paint | Notice sent | 17182797 | |
| § 27-2056.4 ADM CODE- correct failure to notify occupants and/or to investigate lead-based paint hazards. | |||
| Lead Paint | Notice sent | 17182796 | |
| § 27-2056.7 ADM CODE: Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities. | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 4 open | ||
| Notice sent | 19180159 | ||
| CIV14 mailed | 19160337 | ||
| Lead Paint | Notice sent | 17196754 | |
| Mold | Defect letter sent | 17377367 | |
| OATH/ECB | 1 open | ||
| Construction, Class 2 | Decided by default | 39189540X | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 16 on September 24, 2026 and 18 on November 8, with a high of 21 on October 1.
- HPD, by year
- From 2017 to 2026, HPD filed 404 violations and closed 374, all classes.
Year Filed Closed 2026 16 240 2025 33 4 2024 36 19 2023 50 21 2022 24 13 2021 12 6 2020 49 5 2019 102 12 2018 73 45 2017 9 9 - Energy benchmarking
- ENERGY STAR score 4 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed January 7, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
Hearings and penalties
- OATH/ECB summonses
- 21 DOB and FDNY summonses here since January 1, 2019, with $28,400 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 3 judgments docketed, the latest on October 5, 2026. A docketed judgment shows up in a title search.
- May 21, 2026, DOB: Fail to comply with commissioner order to file certificate of correction with DOB. Decided by default, $6,250 penalty imposed.
- December 17, 2025, DOB: Failure to maintain elevator or conveying system. Dismissed.
- May 21, 2025, FDNY: Sign, postings, notices and instructions. In violation, $300 penalty imposed.
The newest 3 of 21 summonses OATH lists here.
- Housing court
- 3 housing court cases here since 2019. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 10 active DOB violations. The newest was issued December 1, 2024.
- DOB complaints
- 1 DOB complaint in the last 12 months. It was filed April 24, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 42 DOB complaints through November 14, 2026. 43 DOB violations since 1988, 16 resolved and 17 dismissed in DOB's records.
- DOB permits
- 1 DOB work permit in effect, for Mechanical Systems work, issued November 9, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- Mechanical Systems, issued November 9, 2026, in effect until September 30, 2027.
- Sidewalk Shed, issued June 12, 2024, signed off.
- General Construction, issued March 19, 2024, signed off.
The newest 3 of 10 permits DOB NOW lists here.
- Boiler inspection
- Inspected January 14, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 5 other open violations this page lists without it.
- What each of the 5 city statuses here means, and how many of these carry it.
- How it compares with the 6,545 Manhattan buildings with 20 to 49 apartments.
- All 10 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 21 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.