4-75 48th Ave, Queens
- Built
- 2006
- Floors
- 39
- Residential units
- 578
- Building type
- Elevator building
- Zoning district
- M3-1
- Lot area
- 71,806 sq ft
- Floor area
- 684,862 sq ft
En español: 1 violación de Clase C abierta (peligro inmediato). La más antigua del HPD lleva 2 años abierta, desde el 15 de septiembre de 2024.
Open now
- 1Get it certified
Class C, immediately hazardous
Open violations are sitting, with little movement either way. 1 open Class C, with nothing filed or new in the last 180 days.
The original certify-by date on the open HPD violation, November 10, 2024, has passed. The report prints it beside the violation.
- OATH/ECB summonses
- 29 DOB and FDNY summonses here since January 1, 2019, with $19,175 in penalties imposed. 3 judgments docketed, the latest on July 31, 2026. A docketed judgment shows up in a title search.
- August 18, 2026, FDNY: Fire protection systems.
- August 4, 2026, FDNY: Sign, postings, notices and instructions.
- August 4, 2026, FDNY: Fire protection systems.
The newest 3 of 29 summonses OATH lists here. The report lists all 29, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB complaints
- 4 DOB complaints in the 12 months to September 25, 2026. The newest was filed May 11, 2026.
- DOB facade
- Rated Safe in the latest facade report, filed April 14, 2025 (inspection cycle 10). Reports in earlier inspection cycles rated it Unsafe in 2017, Safe in 2019, and SWARMP in 2022. SWARMP means safe with a repair and maintenance program.
- DOB permits
- 1 DOB work permit in effect, for Mechanical Systems work, issued July 27, 2026.
- Mechanical Systems, issued July 27, 2026, in effect until November 20, 2026.
- Mechanical Systems, issued June 12, 2026, signed off.
- Plumbing, issued February 12, 2026, signed off.
The newest 3 of 10 permits DOB NOW lists here. The report lists all 10, with job numbers and each job's estimated cost. What the report adds
- Certificate of occupancy
- Final, issued December 15, 2017.
- Local Law 97
- Covered since 2024 (DOB's list, March 1, 2026).
- Boiler inspection
- 2 boilers, both inspected in 2026, the latest on May 21. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed December 9, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 1 open | ||
| Heat / Hot Water | Notice sent | 17373673 | |
The full report on 4-75 48th Ave, Queens
- All 1 open violation, each with the city's own words and the date on its notice.
- What the one city status here means, and how many of these carry it.
- How it compares with the 346 Queens buildings with 200 or more apartments.
- All 10 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 29 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.
Get the report on 4-75 48th Ave, Queens, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.