Skip to content
ViolationScout6 open Class C, with 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.Your building
Buildings32-42 107 Street, QueensCurrent through

32-42 107th St, Queens

BBL 4-01701-0063

Built
1910
Floors
2
Residential units
2
Building type
Two-family dwelling
Zoning district
R4
Lot area
3,800 sq ft
Floor area
1,600 sq ft
Last transfer
No price recorded

En español: 6 violaciones de Clase C abiertas (peligro inmediato) y 17 abiertas en total. La más antigua del HPD lleva 2 años abierta, desde el 1 de abril de 2024.

Open now, most hazardous first

  1. 6

    Class C, immediately hazardous. Most often Heat / Hot Water.

    Oldest open since

    Get these certified
  2. 11

    Class B, hazardous

    See the 11

Open violations are sitting, with little movement either way. 6 open Class C, with 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.

The original certify-by dates on the 17 open HPD violations have all passed. The latest was May 10, 2026. The report prints the date beside each one.

Is this your building?

6 open Class C. The oldest open HPD violation was filed April 1, 2024.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

HPD emergency repair order
1 completed HPD emergency repair order since October 12, 2023: a general construction order, opened July 15, 2025, awarded for $2,180.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class C6 open most often Heat / Hot Water
Notice sent18811044
Notice sent17811447
Heat / Hot WaterNotice sent17758594
Notice sent17758593
Heat / Hot WaterNotice sent16788019
Heat / Hot WaterNotice sent16788018
Class B11 open
Fire SafetyNotice sent17811448
Notice sent17811446
Fire SafetyNotice sent17762194
Vermin / InfestationNotice sent17762193
Notice sent17762192
Fire SafetyNotice sent17758600
Vermin / InfestationNotice sent17758599
Vermin / InfestationNotice sent17758598
Notice sent17758597
Notice sent17758596
The report lists all 11, each with the city's own words and the date on its notice. What the report adds

The full report on 32-42 107th St, Queens

Get the report on 32-42 107th St, Queens, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 32-42 107 Street, Queens have open violations?

Yes. 32-42 107 Street, Queens had 17 open violations on October 10, 2026: 17 from HPD. 6 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 2 years, since April 1, 2024.

Is 32-42 107 Street, Queens getting better or worse?

Open violations are sitting, with little movement either way. 6 open Class C, with 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

Are any HPD emergency repair orders at 32-42 107 Street, Queens marked completed?

Yes. 1 completed HPD emergency repair order since October 12, 2023: a general construction order, opened July 15, 2025, awarded for $2,180. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

When was 32-42 107 Street, Queens built?

The city's record gives 1910 as the year 32-42 107 Street, Queens was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a two-family dwelling with 2 floors.

How many apartments does 32-42 107 Street, Queens have?

The Department of City Planning's PLUTO tax-lot file lists 2 residential units at 32-42 107 Street, Queens. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on HPD emergency repair orders, the city's PLUTO tax-lot file and DOF's property sales records. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus HPD emergency repair orders, the city's PLUTO tax-lot file and DOF's property sales records. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 32-42 107th St, Queens: 2 units, 6 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/32-42-107-street-queens

How we count: /method.

Is this your building?