Skip to content
ViolationScout6 open Class C, with 6 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.Your building
Buildings97-11 Horace Harding Expressway, QueensCurrent through

97-11 Horace Harding Expressway, Queens

BBL 4-01918-0107

Built
1963
Floors
16
Residential units
232
Building type
Elevator building
Zoning district
R6
Lot area
48,120 sq ft
Floor area
235,000 sq ft

En español: 6 violaciones de Clase C abiertas (peligro inmediato) y 11 abiertas en total. La más antigua del HPD lleva 13 años abierta, desde el 1 de octubre de 2013.

Open now, most hazardous first

  1. 6

    Class C, immediately hazardous

    10 open counting every year, the oldest since

    Get these certified
  2. 5

    Class B, hazardous

    See the 5

Open violations are sitting, with little movement either way. 6 open Class C, with 6 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.

Since October 12, 2023, certifications were filed on 29 Class C violations: 28 by the original certify-by date, 1 after it. How certification works

The original certify-by dates on the 11 open HPD violations run from December 21, 2023 to October 19, 2026. The report prints the date beside each one.

Is this your building?

6 open Class C and a facade rated SWARMP. The oldest open HPD violation was filed October 1, 2013.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

Open Class C, week by week
6 on September 24, 2026 and 6 on October 8.
OATH/ECB summonses
12 DOB and FDNY summonses here since January 1, 2019, with $9,200 in penalties imposed.
  • July 7, 2026, FDNY: Inspection and testing. Decided by default, $3,000 penalty imposed.
  • July 7, 2026, FDNY: Inspection and testing. In violation.
  • February 7, 2024, DOB: Failure to maintain display on site documents required by BC chapter 33. Dismissed.

The newest 3 of 12 summonses OATH lists here. The report lists all 12, with each outcome, the penalty imposed and any docketing date. What the report adds

How a default is vacated

DOB violations
3 active DOB violations, most of them for elevators. The newest was issued May 11, 2007.
Housing court
20 housing court cases here since 2006.
DOB complaints
2 DOB complaints, 1 of them conversion complaint, in the 12 months to September 25, 2026. The newest was filed June 26, 2026.
DOB facade
Rated SWARMP in the latest facade report, filed February 21, 2023 (inspection cycle 9). Reports in earlier inspection cycles rated it SWARMP in 2006 and 2014, and Safe in 2017. SWARMP means safe with a repair and maintenance program. Need this filed?
DOB permits
DOB NOW lists 5 work permits here, the newest issued April 17, 2024, for Suspended Scaffold work.
  • Suspended Scaffold, issued April 17, 2024.
  • Suspended Scaffold, issued January 22, 2024, signed off.
  • Sidewalk Shed, issued November 28, 2023, signed off.

The newest 3 of 5 permits DOB NOW lists here. The report lists all 5, with job numbers and each job's estimated cost. What the report adds

Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Bedbug report
Filed December 17, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C6 open
Fire SafetyNo access to reinspect (first try)19180129Peru Leasing Limited Partnership
Heat / Hot WaterInvalid certification17819389
Heat / Hot WaterInvalid certification17651646
Vermin / InfestationNotice sent to tenant17593602
Vermin / InfestationDefect letter sent17285281
MoldNotice sent to tenant17293738
Class B5 open
To be reinspected19180121Peru Leasing Limited Partnership
Notice sent17593604
MoldNo access to reinspect (first try)17593603
Notice sent16830119
Notice sent16349778

The full report on 97-11 Horace Harding Expressway, Queens

Get the report on 97-11 Horace Harding Expressway, Queens, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Other buildings on this tax block (12 of 18)

Nearby buildings

Questions about this building

Does 97-11 Horace Harding Expressway, Queens have open violations?

Yes. 97-11 Horace Harding Expressway, Queens had 11 open violations on October 10, 2026: 11 from HPD. 6 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 13 years, since October 1, 2013.

Is 97-11 Horace Harding Expressway, Queens getting better or worse?

Open violations are sitting, with little movement either way. 6 open Class C, with 6 certifications filed and 1 new Class C in the last 180 days, too few to call a direction. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 97-11 Horace Harding Expressway, Queens?

Since October 12, 2023, certifications were filed on 29 Class C violations: 28 by the original certify-by date, 1 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 97-11 Horace Harding Expressway, Queens have active DOB violations?

Yes. 3 active DOB violations, most of them for elevators. The newest was issued May 11, 2007. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has 97-11 Horace Harding Expressway, Queens been in housing court?

Yes. 20 housing court cases here since 2006. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 97-11 Horace Harding Expressway, Queens?

Yes. 2 DOB complaints, 1 of them conversion complaint, in the 12 months to September 25, 2026. The newest was filed June 26, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

What did the latest facade report find at 97-11 Horace Harding Expressway, Queens?

Rated SWARMP in the latest facade report, filed February 21, 2023 (inspection cycle 9). Reports in earlier inspection cycles rated it SWARMP in 2006 and 2014, and Safe in 2017. SWARMP means safe with a repair and maintenance program. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

When did 97-11 Horace Harding Expressway, Queens last file its bedbug report?

On December 17, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 97-11 Horace Harding Expressway, Queens covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

When was 97-11 Horace Harding Expressway, Queens built?

The city's record gives 1963 as the year 97-11 Horace Harding Expressway, Queens was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator building with 16 floors.

How many apartments does 97-11 Horace Harding Expressway, Queens have?

The Department of City Planning's PLUTO tax-lot file lists 232 residential units at 97-11 Horace Harding Expressway, Queens. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, DOB facade filings, DOB NOW work permits, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, DOB facade filings, DOB NOW work permits, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 97-11 Horace Harding Expressway, Queens: 6 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/97-11-horace-harding-expressway-queens

How we count: /method.

Is this your building?