460 52nd St
Sunset Park, Brooklyn, NY 11220
460 52nd Street is a walk-up building with 7 apartments, built in 1931. It has 25 open violations, 14 of them Class C, immediately hazardous. The oldest open HPD violation was filed on November 9, 1984.
En español: 14 violaciones de Clase C abiertas (peligro inmediato) y 25 abiertas en total. La más antigua del HPD lleva 42 años abierta, desde el 9 de noviembre de 1984.
Open now, most hazardous first
- 14Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.
- 11See the 11
Class B, hazardous, filed in the last 3 years. Most often Fire Safety.
20.0 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.
The original certify-by dates on the 25 open HPD violations have all passed. The latest was January 26, 2026.
- Zoning district
- R6B
- Lot area
- 2,053 sq ft
- Floor area
- 6,400 sq ft
- Tax lot (BBL)
- 3-00807-0034
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 14 open most often Lead Paint | ||
| Notice sent | 18371318 | ||
| § 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of unsealed dumbwaiter door at public hall, 1st story | |||
| Notice sent | 18371317 | ||
| § 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of unsealed dumbwaiter door at public hall, 2nd story | |||
| Lead Paint | Notice sent | 17422350 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) baseboard at south wall, baseboard at west wall, west wall in the 4th room from north at west | |||
| Lead Paint | Notice sent | 17422349 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) ceiling in the 4th room from north at east | |||
| Lead Paint | Notice sent | 17422348 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) 1st riser from east at south wall in the 1st room from north | |||
| Lead Paint | Notice sent | 17422347 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) baseboard at east wall, north wall in the foyer | |||
| Lead Paint | Notice sent | 17422345 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from south at west wall, south wall, west wall in the kitchen | |||
| Lead Paint | Notice sent | 17422343 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) ceiling in the bathroom | |||
| Notice sent | 17420777 | ||
| § 27-2005, 2007 ADM CODE Remove the illegal fastening consisting of and unacceptable key lock installed at room door leading to fire escape in the 4th room from north at west | |||
| Mold | Invalid certification | 17421076 | |
| Mold | Invalid certification | 17421075 | |
| Fire Safety | Notice sent | 16641431 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective entrance door in the entrance | |||
| Notice sent | 16641425 | ||
| § 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north | |||
| Notice sent | 16641422 | ||
| § 27-2043.1 HMC Install the missing or repair/replace the defective window guard(S) in accordance with the specifications of the new york city health code section 24 RCNY chapter 12. Wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 11 open most often Fire Safety | ||
| Notice sent | 18489414 | ||
| Notice sent | 17421412 | ||
| Fire Safety | Notice sent | 17420789 | |
| Fire Safety | Notice sent | 17420786 | |
| Notice sent | 17420784 | ||
| Mold | No access to reinspect (first try) | 17420783 | |
| Mold | No access to reinspect (first try) | 17420781 | |
| Notice sent | 16641430 | ||
| Notice sent | 16641427 | ||
| Fire Safety | Notice sent | 16641424 | |
| Fire Safety | Notice sent | 16641423 | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 14 on September 24, 2026 and 14 on November 15.
- HPD, by year
- From 2017 to 2026, HPD filed 87 violations and closed 20, all classes.
Year Filed Closed 2026 1 4 2025 5 1 2024 28 7 2023 2 0 2022 2 5 2021 19 1 2019 1 0 2018 4 0 2017 25 2 - Bedbug report
- Filed July 9, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 27, 2023: a general construction order, opened January 16, 2025, awarded for $700. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
DOB records
- DOB violations
- 3 active DOB violations. The newest was issued June 20, 2023.
- DOB complaints
- 1 DOB complaint in the last 12 months. It was filed July 24, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 7 DOB complaints from 1997 through November 25, 2026. 9 DOB violations since 2001, 6 dismissed in DOB's records.
- Boiler inspection
- Inspected August 4, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Hearings and penalties
- Housing court
- 2 housing court cases here since 2008. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
The building report
- The city's wording on the 13 other open violations this page lists without it.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 19,359 Brooklyn buildings with 6 to 19 apartments.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.