Skip to content
ViolationScout1 open Class C, with nothing filed or new in the last 180 days.Your building
Buildings490 Clove Road, Staten IslandCurrent through

490 Clove Rd, Staten Island

BBL 5-00230-7502

Built
1990
Floors
3
Residential units
84
Building type
Condominium
Zoning district
R3A
Lot area
62,500 sq ft
Floor area
75,092 sq ft

En español: 1 violación de Clase C abierta (peligro inmediato) y 2 abiertas en total. La más antigua del HPD lleva 15 años abierta, desde el 7 de enero de 2011.

Open now, most hazardous first

  1. 1

    Class C, immediately hazardous

    6 open counting every year, the oldest since

    Get it certified
  2. 1

    OATH/ECB summons still active

    See it

Open violations are sitting, with little movement either way. 1 open Class C, with nothing filed or new in the last 180 days.

Since October 12, 2023, certifications were filed on 10 Class C violations, all 10 by the original certify-by date. How certification works

The original certify-by date on the open HPD violation, November 25, 2024, has passed. The report prints it beside the violation.

Is this your building?

1 open Class C and an OATH hearing on October 29, 2026. The oldest open HPD violation was filed January 7, 2011.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words and what each status means. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

OATH hearings
A hearing on a DOB summons is set for October 29, 2026.
OATH/ECB summonses
5 DOB and FDNY summonses here since January 1, 2019, with $2,800 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB.
  • February 9, 2026, DOB: Failure to maintain building in code-compliant manner. Adjourned, $2,500 penalty imposed.
  • August 16, 2023, FDNY: Portable fire extinguishers and fire hoses. In violation.
  • August 16, 2023, FDNY: Fire protection systems. In violation.

The newest 3 of 5 summonses OATH lists here. The report lists all 5, with each outcome, the penalty imposed and any docketing date. What the report adds

Housing court
2 housing court cases here since 2010.
Local Law 97
Covered since 2024 (DOB's list, March 1, 2026).
Bedbug report
Filed for its 3 buildings by December 3, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C1 open
Notice sent17410619
OATH/ECB1 open
Construction, Class 1Hearing pending39176624KARCADIA GARDENS CONDO I

The full report on 490 Clove Rd, Staten Island

Get the report on 490 Clove Rd, Staten Island, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 490 Clove Road, Staten Island have open violations?

Yes. 490 Clove Road, Staten Island had 2 open violations on October 10, 2026: 1 from OATH/ECB and 1 from HPD. 1 is Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 15 years, since January 7, 2011.

Is 490 Clove Road, Staten Island getting better or worse?

Open violations are sitting, with little movement either way. 1 open Class C, with nothing filed or new in the last 180 days. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 490 Clove Road, Staten Island?

Since October 12, 2023, certifications were filed on 10 Class C violations, all 10 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 490 Clove Road, Staten Island have an OATH hearing coming up?

Yes. A hearing on a DOB summons is set for October 29, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Has 490 Clove Road, Staten Island been in housing court?

Yes. 2 housing court cases here since 2010. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

When did 490 Clove Road, Staten Island last file its bedbug report?

Its 3 buildings had all filed by December 3, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 490 Clove Road, Staten Island covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered since 2024 (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

When was 490 Clove Road, Staten Island built?

The city's record gives 1990 as the year 490 Clove Road, Staten Island was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a condominium with 3 floors.

How many apartments does 490 Clove Road, Staten Island have?

The Department of City Planning's PLUTO tax-lot file lists 84 residential units at 490 Clove Road, Staten Island. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH hearing dates, OATH/ECB summonses from DOB and FDNY, HPD's housing court cases, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH hearing dates, OATH/ECB summonses from DOB and FDNY, HPD's housing court cases, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 490 Clove Rd, Staten Island: 84 units, 1 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/490-clove-road-staten-island

How we count: /method.

Is this your building?