Skip to content
ViolationScout15 open Class C, with 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.Your building
Buildings51 Clifton Place, BrooklynCurrent through

51 Clifton Pl

Clinton Hill, Brooklyn, NY 11238

51 Clifton Place is a walk-up building with 16 apartments, built in 1905. It has 33 open violations, 15 of them Class C, immediately hazardous. The oldest open HPD violation was filed on September 19, 1979.

En español: 15 violaciones de Clase C abiertas (peligro inmediato) y 33 abiertas en total. La más antigua del HPD lleva 47 años abierta, desde el 19 de septiembre de 1979.

Open now, most hazardous first

  1. 15

    Class C, immediately hazardous, filed in the last 3 years

    29 open counting every year, the oldest since

    Get these certified
  2. 18

    Class B, hazardous, filed in the last 3 years. Most often Fire Safety.

    See the 18

9.4 open Class C per 10 apartments. Across the city: 0.7.

Open violations are sitting, with little movement either way. 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.

The original certify-by dates on the 33 open HPD violations have all passed. The latest was July 21, 2026.

Zoning district
R6B
Lot area
3,800 sq ft
Floor area
9,520 sq ft
Tax lot (BBL)
3-01948-0063

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class C15 open
Notice sent18970870
§ 27-2005 HMC: Properly repair or replace the broken or defective mortise lock at door in the entrance
Vermin / InfestationNotice sent to tenant18010904
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Vermin / InfestationNotice sent to tenant18010903
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Notice sent18010902
Vermin / InfestationNotice sent to tenant17877939
567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. Evidence found at droppings in the entire apartment
Vermin / InfestationNotice sent to tenant17877936
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Vermin / InfestationNotice sent to tenant17264939
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Notice sent17264938
§ 27-2005 HMC: Properly repair or replace the broken or defective broken upper and lower sash window frames at 1st window from east at south in the 4th room from north
Heat / Hot WaterNotice sent16608532
§ 27-2033 ADM CODE Provide ready access to buildings heating system locked door t at boiler room
Heat / Hot WaterNotice sent16547334
§ 27-2033 ADM CODE Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing
Heat / Hot WaterNotice sent16547330
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at basement
Heat / Hot WaterNotice sent16547328
§ 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment
Heat / Hot WaterNotice sent16520254
§ 27-2028, 2032 ADM CODE Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the 3rd room from north at east
Vermin / InfestationNotice sent to tenant16498902
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Heat / Hot WaterNotice sent16498901
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at boiler room
In HPD's words. Apartment numbers are left out.
Class B18 open most often Fire Safety
Notice sent18970874
Notice sent18970873
Fire SafetyNotice sent18970872
Fire SafetyNotice sent18970871
Notice sent18010905
Notice sent17877944
Notice sent17877943
Notice sent17877942
Notice sent17877941
Fire SafetyNotice sent17877938
Fire SafetyNotice sent17877937
Notice sent17877935
Notice sent17877934
Notice sent17877933
Notice sent17877932
Notice sent17877931
Notice sent17877930
Notice sent16498903
Is this your building?Also for tenants and buyers
Is this your building?

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

Open Class C, week by week
15 on September 24, 2026 and 15 on November 15.
HPD, by year
From 2017 to 2026, HPD filed 137 violations and closed 14, all classes.
YearFiledClosed
202691
2025222
202492
2023181
202230
202120
2019120
2018361
2017267
HPD emergency repair orders
4 completed HPD emergency repair orders since November 27, 2023, awarded for $4,476 in total. The most recent of the 4, a general construction order, was opened July 30, 2026. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.

DOB records

DOB violations
14 active DOB violations, most of them for low-pressure boilers. The newest was issued November 14, 2025.
DOB, all years
2 DOB complaints from 2023 through November 25, 2026. 14 DOB violations since 1993.

Hearings and penalties

Housing court
5 housing court cases here since 2006. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 51 Clifton Pl have open violations?

Yes. It had 33 open violations on November 25, 2026: 33 from HPD. 15 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 47 years, since September 19, 1979.

Is this building getting better or worse?

Open violations are sitting, with little movement either way. 15 open Class C, with 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction. The 180 days run to November 25, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, DOB violations, HPD's housing court cases, HPD emergency repair orders and the city's PLUTO tax-lot file. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 51 Clifton Pl, Brooklyn: 16 units, 15 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 25, 2026. https://violationscout.com/building/51-clifton-place-brooklyn

How we count: /method.

Is this your building?