Skip to content
ViolationScout7 certifications filed against 3 new Class C in the last 180 days.Your building
Buildings580 Flatbush Avenue, BrooklynCurrent through

580 Flatbush Ave, Brooklyn

BBL 3-05026-0100

Built
1962
Floors
16
Residential units
224
Building type
Elevator building
Zoning district
R7-1
Lot area
37,577 sq ft
Floor area
234,132 sq ft

En español: 10 violaciones de Clase C abiertas (peligro inmediato) y 17 abiertas en total. La más antigua del HPD lleva 34 años abierta, desde el 26 de septiembre de 1992.

Open now, most hazardous first

  1. 10

    Class C, immediately hazardous. Most often Vermin / Infestation.

    34 open counting every year, the oldest since

    Get these certified
  2. 7

    Class B, hazardous. Most often Fire Safety.

    See the 7

Certifications are being filed faster than new violations come in. 7 certifications filed against 3 new Class C in the last 180 days.

Since October 12, 2023, certifications were filed on 28 Class C violations, all 28 by the original certify-by date. How certification works

The original certify-by dates on the 17 open HPD violations run from December 21, 2023 to November 6, 2026. The report prints the date beside each one.

Is this your building?

10 open Class C. The oldest open HPD violation was filed September 26, 1992.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

Open Class C, week by week
8 on September 24, 2026 and 10 on October 8.
OATH/ECB summonses
25 DOB and FDNY summonses here since January 1, 2019, with $22,614 in penalties imposed. 4 judgments docketed, the latest on March 31, 2022. A docketed judgment shows up in a title search.
  • November 14, 2025, DOB: Failure to maintain elevator or conveying system. Admitted, $655 penalty imposed.
  • November 14, 2025, DOB: Failure to maintain elevator or conveying system. Admitted, $1,280 penalty imposed.
  • January 29, 2025, FDNY: Fire protection systems. In violation.

The newest 3 of 25 summonses OATH lists here. The report lists all 25, with each outcome, the penalty imposed and any docketing date. What the report adds

DOB violations
7 active DOB violations. The newest was issued April 26, 2023.
Housing court
13 housing court cases here since 2006, most of them tenant actions.
DOB complaints
2 DOB complaints in the 12 months to September 25, 2026. The newest was filed August 5, 2026.
DOB facade
Rated Safe in the latest facade report, filed May 2, 2023 (inspection cycle 9). An earlier report in this cycle, filed February 19, 2022, rated it Unsafe. Reports in earlier inspection cycles rated it Safe in 2007, 2012 and 2017.
DOB permits
1 DOB work permit in effect, for General Construction work, issued January 15, 2026.
  • Structural, issued January 15, 2026, in effect until November 30, 2026.
  • Suspended Scaffold, issued May 21, 2025, expired May 21, 2026.
  • Sidewalk Shed, issued December 20, 2022, signed off.
Energy benchmarking
ENERGY STAR score 61 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Boiler inspection
2 boilers, both inspected in 2026, the latest on January 22. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed December 17, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair order
1 completed HPD emergency repair order since October 12, 2023: a general construction order, opened August 7, 2025, awarded for $400.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C10 open most often Vermin / Infestation
Fire SafetyCertified on time19272802
Vermin / InfestationNotice sent to tenant19272801
Vermin / InfestationNotice sent to tenant19185099
Vermin / InfestationNotice sent to tenant18737007FLATBUSH PATIO LLC
Vermin / InfestationNotice sent to tenant18050822
Vermin / InfestationNotice sent to tenant18037694
Vermin / InfestationNotice sent to tenant17857790
Vermin / InfestationNotice sent to tenant17780831
Vermin / InfestationNotice sent to tenant17432048
Vermin / InfestationNotice sent to tenant16382164
Class B7 open most often Fire Safety
Fire SafetyCIV14 mailed19185101
Fire SafetyCIV14 mailed19185100
CIV14 mailed19185096
Notice sent17938048
Notice sent17857789
No access to reinspect (first try)17686635
Notice sent17012288

The full report on 580 Flatbush Ave, Brooklyn

Get the report on 580 Flatbush Ave, Brooklyn, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Other buildings on this tax block (12 of 13)

Nearby buildings

Questions about this building

Does 580 Flatbush Avenue, Brooklyn have open violations?

Yes. 580 Flatbush Avenue, Brooklyn had 17 open violations on October 10, 2026: 17 from HPD. 10 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 34 years, since September 26, 1992.

Is 580 Flatbush Avenue, Brooklyn getting better or worse?

Certifications are being filed faster than new violations come in. 7 certifications filed against 3 new Class C in the last 180 days. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 580 Flatbush Avenue, Brooklyn?

Since October 12, 2023, certifications were filed on 28 Class C violations, all 28 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 580 Flatbush Avenue, Brooklyn have active DOB violations?

Yes. 7 active DOB violations. The newest was issued April 26, 2023. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has 580 Flatbush Avenue, Brooklyn been in housing court?

Yes. 13 housing court cases here since 2006, most of them tenant actions. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 580 Flatbush Avenue, Brooklyn?

Yes. 2 DOB complaints in the 12 months to September 25, 2026. The newest was filed August 5, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 580 Flatbush Avenue, Brooklyn marked completed?

Yes. 1 completed HPD emergency repair order since October 12, 2023: a general construction order, opened August 7, 2025, awarded for $400. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

What did the latest facade report find at 580 Flatbush Avenue, Brooklyn?

Rated Safe in the latest facade report, filed May 2, 2023 (inspection cycle 9). An earlier report in this cycle, filed February 19, 2022, rated it Unsafe. Reports in earlier inspection cycles rated it Safe in 2007, 2012 and 2017. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Are any DOB work permits in effect at 580 Flatbush Avenue, Brooklyn?

Yes. 1 DOB work permit in effect, for General Construction work, issued January 15, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

What is the ENERGY STAR score for 580 Flatbush Avenue, Brooklyn?

ENERGY STAR score 61 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

When was the boiler at 580 Flatbush Avenue, Brooklyn last inspected?

It has 2 boilers, both inspected in 2026, the latest on January 22. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 580 Flatbush Avenue, Brooklyn last file its bedbug report?

On December 17, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 580 Flatbush Avenue, Brooklyn covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 580 Flatbush Avenue, Brooklyn rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 580 Flatbush Avenue, Brooklyn built?

The city's record gives 1962 as the year 580 Flatbush Avenue, Brooklyn was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator building with 16 floors.

How many apartments does 580 Flatbush Avenue, Brooklyn have?

The Department of City Planning's PLUTO tax-lot file lists 224 residential units at 580 Flatbush Avenue, Brooklyn. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 580 Flatbush Ave, Brooklyn: 224 units, 10 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/580-flatbush-avenue-brooklyn

How we count: /method.

Is this your building?