Skip to content
Buildings710 2 Avenue, ManhattanCurrent through

710 2nd Ave, Manhattan

BBL 1-00944-0001

Built
1928
Floors
16
Residential units
154
Building type
Elevator building
Zoning district
C1-9
Lot area
9,875 sq ft
Floor area
122,207 sq ft

En español: sin violaciones abiertas del HPD, contando todos los años.

Is this your building?

A facade rated SWARMP.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

OATH/ECB summonses
4 DOB and FDNY summonses here since January 1, 2019, with $925 in penalties imposed. 1 judgment docketed, on November 30, 2025. A docketed judgment shows up in a title search.
  • July 29, 2024, FDNY: Affidavits, design installation documents, and other documentation. In violation, $300 penalty imposed.
  • December 2, 2022, DOB: Fail submit required report of critical examination documenting exterior wall. In violation, $625 penalty imposed.
  • March 15, 2021, FDNY: Fire protection systems. In violation.

The newest 3 of 4 summonses OATH lists here. The report lists all 4, with each outcome, the penalty imposed and any docketing date. What the report adds

DOB violations
4 active DOB violations. The newest was issued December 1, 2023.
DOB facade
Rated SWARMP in the latest facade report, filed January 25, 2023 (inspection cycle 9). Reports in earlier inspection cycles rated it SWARMP in 2007, and Safe in 2012 and 2016. SWARMP means safe with a repair and maintenance program. Need this filed?
DOB permits
1 DOB work permit in effect, for Sidewalk Shed work, issued September 24, 2026.
  • Sidewalk Shed, issued September 24, 2026, in effect until December 23, 2026.
  • Plumbing, issued January 23, 2024, signed off.
  • Sign, issued November 3, 2023, signed off.

The newest 3 of 6 permits DOB NOW lists here. The report lists all 6, with job numbers and each job's estimated cost. What the report adds

Energy benchmarking
ENERGY STAR score 80 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered from 2026 as a rent-regulated building (DOB's list, March 1, 2026).
Boiler inspection
Inspected September 16, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed December 8, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).

No open HPD violations, counting every year. No OATH/ECB summons issued in the last 3 years is still active.

The full report on 710 2nd Ave, Manhattan

Get the report on 710 2nd Ave, Manhattan, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 710 2 Avenue, Manhattan have open violations?

No. On October 10, 2026, 710 2 Avenue, Manhattan had no open HPD violations, counting every year, and no OATH/ECB summons issued in the last 3 years was still active.

Does 710 2 Avenue, Manhattan have active DOB violations?

Yes. 4 active DOB violations. The newest was issued December 1, 2023. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

What did the latest facade report find at 710 2 Avenue, Manhattan?

Rated SWARMP in the latest facade report, filed January 25, 2023 (inspection cycle 9). Reports in earlier inspection cycles rated it SWARMP in 2007, and Safe in 2012 and 2016. SWARMP means safe with a repair and maintenance program. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Are any DOB work permits in effect at 710 2 Avenue, Manhattan?

Yes. 1 DOB work permit in effect, for Sidewalk Shed work, issued September 24, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

What is the ENERGY STAR score for 710 2 Avenue, Manhattan?

ENERGY STAR score 80 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

When was the boiler at 710 2 Avenue, Manhattan last inspected?

On September 16, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 710 2 Avenue, Manhattan last file its bedbug report?

On December 8, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 710 2 Avenue, Manhattan covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered from 2026 as a rent-regulated building (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 710 2 Avenue, Manhattan rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 710 2 Avenue, Manhattan built?

The city's record gives 1928 as the year 710 2 Avenue, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator building with 16 floors.

How many apartments does 710 2 Avenue, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 154 residential units at 710 2 Avenue, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH/ECB summonses from DOB and FDNY, DOB violations, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH/ECB summonses from DOB and FDNY, DOB violations, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 710 2nd Ave, Manhattan: 154 units, 4 active DOB violations, from New York City's HPD violation, DOB violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/710-2-avenue-manhattan

How we count: /method.

Is this your building?