76 Hicks St
Brooklyn Heights, Brooklyn, NY 11201
76 Hicks Street is an elevator building with 48 apartments, built in 1923. It has 19 open violations, 5 of them Class C, immediately hazardous. The oldest open HPD violation was filed on May 29, 2026.
En español: 5 violaciones de Clase C abiertas (peligro inmediato) y 19 abiertas en total. La más antigua del HPD lleva 5 meses abierta, desde el 29 de mayo de 2026.
Open now, most hazardous first
- 5Get these certified
Class C, immediately hazardous, filed in the last 3 years
- 13See the 13
Class B, hazardous, filed in the last 3 years. Most often Fire Safety.
- 1See it
OATH/ECB summons still active
1.0 open Class C per 10 apartments. Across the city: 0.7.
Certifications and new violations are both coming in, neither at twice the other's rate. 9 certifications filed and 5 new Class C in the last 180 days.
Since November 27, 2023, certifications were filed on 8 Class C violations, all 8 by the original certify-by date. How certification works
The original certify-by dates on the 18 open HPD violations run from July 2, 2026 to December 3, 2026.
- Zoning district
- R6
- Lot area
- 10,218 sq ft
- Floor area
- 47,136 sq ft
- Last sale
- $15,850,000
- Tax lot (BBL)
- 3-00220-0016
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 5 open | |||
| Lead Paint | Notice sent | 19308391 | ANPORA 35 ORANGE STREET LLC | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door from west at north wall in the 4th room from north | ||||
| Notice sent | 19186789 | |||
| § 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen | ||||
| Notice sent | 19186776 | |||
| § 27-2037, 2038 HMC: Provide a safe and adequate supply of electric service to the fixtures at ceiling walls outlets and light switches in the entire apartment | ||||
| Notice sent | 19186774 | |||
| § 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of fire damage, at ceiling, walls, floors and broken windows in the entire apartment | ||||
| Vermin / Infestation | Notice sent to tenant | 18965727 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 13 open most often Fire Safety | |||
| Notice sent | 19297317 | ANPORA 35 ORANGE STREET LLC | ||
| Notice sent | 19037694 | |||
| Notice sent | 19037693 | |||
| Fire Safety | Notice sent | 19037692 | ||
| Fire Safety | Notice sent | 19037691 | ||
| Fire Safety | Notice sent | 18965735 | ||
| Fire Safety | Notice sent | 18965734 | ||
| Notice sent | 18965733 | |||
| Notice sent | 18965732 | |||
| Notice sent | 18965731 | |||
| Notice sent | 18965730 | |||
| Notice sent | 18965729 | |||
| Notice sent | 18965728 | |||
| OATH/ECB | 1 open | |||
| Construction, Class 1 | Hearing pending | 39201778P | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD vacate order
- HPD's vacate order for part of the building has been in effect since September 3, 2026. Reason on the order: fire damage.
- Open Class C, week by week
- 13 on September 24, 2026 and 11 on November 15, with a low of 10 on October 8.
- HPD, by year
- From 2021 to 2026, HPD filed 84 violations and closed 60, all classes.
Year Filed Closed 2026 35 11 2025 0 4 2024 12 10 2023 8 21 2022 13 3 2021 16 11 - Energy benchmarking
- ENERGY STAR score 31 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 12, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
Hearings and penalties
- OATH hearings
- A hearing on a DOB summons is set for May 10, 2027.
- OATH/ECB summonses
- 3 DOB and FDNY summonses here since January 1, 2019, with $2,500 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB.
- August 26, 2026, FDNY: Rooftop access and means of egress.
- August 25, 2026, DOB: Fail to maintain required number of means of egress for every floor. Adjourned, $2,500 penalty imposed.
- October 21, 2025, DOB: Fail maintain building in compliant manner: Service equipment - boiler. In violation.
DOB records
- DOB violations
- 2 active DOB violations. The newest was issued August 25, 2026.
- DOB complaints
- 11 DOB complaints in the last 12 months, 1 of them a conversion complaint. The newest was filed November 12, 2026. A conversion complaint, like any complaint, is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 49 DOB complaints through November 25, 2026. 26 DOB violations since 1989, 9 resolved and 15 dismissed in DOB's records.
- DOB facade
- Rated Safe with a repair and maintenance program (SWARMP) in the latest facade report, filed February 21, 2023 (inspection cycle 9). Reports in earlier inspection cycles rated it Unsafe in 2007, Safe in 2008, SWARMP in 2012, and Safe in 2018.
- DOB permits
- 4 DOB work permits in effect. The latest, for General Construction work, was issued October 21, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- General Construction, issued October 21, 2026, in effect until January 7, 2027.
- Suspended Scaffold, issued October 16, 2026, in effect until January 7, 2027.
- Supported Scaffold, issued October 9, 2026, in effect until January 7, 2027.
The newest 3 of 6 permits DOB NOW lists here.
- Boiler inspection
- Inspected August 28, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 14 other open violations this page lists without it.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 4,017 Brooklyn buildings with 20 to 49 apartments.
- All 6 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 3 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.