Skip to content
ViolationScout10 open Class C, with 0 certifications filed and 2 new Class C in the last 180 days, too few to call a direction.Is this your building?
Buildings7925 4 Avenue, BrooklynCurrent through

7925 4th Ave, Brooklyn

BBL 3-05980-0001

En español: 10 violaciones de Clase C abiertas (peligro inmediato) y 23 abiertas en total.

Open violations are sitting, with little movement either way. 10 open Class C, with 0 certifications filed and 2 new Class C in the last 180 days, too few to call a direction.

Since September 28, 2023, certifications were filed on 4 Class C violations, all 4 by the original certify-by date. How certification works

Is this your building?

10 open Class C.

We read every request ourselves. When a compliance firm we work with can take the building, we introduce you to that one firm. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: which violations matter, and how long this kind usually takes to clear. It is not on sale yet.

See what the report covers

HPD takes complaints from tenants through 311.

DOB violations
2 active DOB violations, most of them for elevators. The newest was issued March 3, 1992.
DOB complaints
1 DOB complaint in the last 12 months. It was filed August 6, 2026.
DOB facade
Rated SWARMP in the latest facade report, filed January 12, 2023 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Need this filed?
DOB permits
4 DOB work permits in effect. The latest, for Sidewalk Shed work, was issued August 11, 2026.
Certificate of occupancy
Final, issued September 7, 2012.
Energy benchmarking
ENERGY STAR score 76 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered from 2026 as a rent-regulated building (DOB's list, March 1, 2026).
Rent stabilization
Has rent-stabilized apartments (2024 registration).

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C10 open
Fire SafetyNotice sent19228219
Notice sent19228203
Vermin / InfestationDefect letter sent17757209
Vermin / InfestationNot complied with17757208
Lead PaintNot complied with17692985
Lead PaintDefect letter sent17692984
Lead PaintDefect letter sent17692983
To be reinspected17686848
Vermin / InfestationDefect letter sent16628784
Heat / Hot WaterNo access to reinspect (first try)16278584
Class B13 open
Notice sent181259047901 4th TENANTS CORP
No access to reinspect (first try)17021076
No access to reinspect (first try)17021075
No access to reinspect (first try)17013718
No access to reinspect (first try)17013717
No access to reinspect (first try)17013716
No access to reinspect (first try)17013715
No access to reinspect (first try)17013714
No access to reinspect (first try)17013713
No access to reinspect (first try)16278583
No access to reinspect (first try)16278582
No access to reinspect (first try)16278581
No access to reinspect (first try)16278580

Nearby buildings

Questions about this building

Does 7925 4 Avenue, Brooklyn have open violations?

Yes. 7925 4 Avenue, Brooklyn had 23 open violations on September 26, 2026: 23 from HPD. 10 are Class C, the class HPD treats as immediately hazardous.

Is 7925 4 Avenue, Brooklyn getting better or worse?

Open violations are sitting, with little movement either way. 10 open Class C, with 0 certifications filed and 2 new Class C in the last 180 days, too few to call a direction. That window ends September 26, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 7925 4 Avenue, Brooklyn?

Since September 28, 2023, certifications were filed on 4 Class C violations, all 4 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 7925 4 Avenue, Brooklyn have active DOB violations?

Yes. 2 active DOB violations, most of them for elevators. The newest was issued March 3, 1992. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has DOB received complaints about 7925 4 Avenue, Brooklyn?

Yes. 1 DOB complaint in the last 12 months. It was filed August 6, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

What did the latest facade report find at 7925 4 Avenue, Brooklyn?

Rated SWARMP in the latest facade report, filed January 12, 2023 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Are any DOB work permits in effect at 7925 4 Avenue, Brooklyn?

Yes. 4 DOB work permits in effect. The latest, for Sidewalk Shed work, was issued August 11, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

Does 7925 4 Avenue, Brooklyn have a certificate of occupancy?

Its latest certificate of occupancy is a final one, issued September 7, 2012. A certificate of occupancy says how a building may be used and occupied. A temporary one lets people move in while work finishes and has to be renewed until DOB issues the final one. DOB's records here start in July 2012, so an older certificate may not show.

What is the ENERGY STAR score for 7925 4 Avenue, Brooklyn?

ENERGY STAR score 76 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

Is 7925 4 Avenue, Brooklyn covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered from 2026 as a rent-regulated building (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 7925 4 Avenue, Brooklyn rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 7925 4 Avenue, Brooklyn built?

The city's record gives 1927 as the year 7925 4 Avenue, Brooklyn was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 6 floors.

How many apartments does 7925 4 Avenue, Brooklyn have?

The Department of City Planning's PLUTO tax-lot file lists 131 residential units at 7925 4 Avenue, Brooklyn. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, DOB certificates of occupancy, Local Law 84 energy reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 26, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, DOB certificates of occupancy, Local Law 84 energy reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 7925 4th Ave, Brooklyn: 10 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 26, 2026. https://violationscout.com/building/7925-4-avenue-brooklyn

How we count: /method.

Is this your building?