95 Wall St
Manhattan, NY 10005
95 Wall Street is an elevator building with 503 apartments, built in 1969. It has 19 open violations, 12 of them Class C, immediately hazardous. The oldest open HPD violation was filed on May 30, 2009.
En español: 12 violaciones de Clase C abiertas (peligro inmediato) y 19 abiertas en total. La más antigua del HPD lleva 17 años abierta, desde el 30 de mayo de 2009.
Open now, most hazardous first
- 12Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Heat / Hot Water.
- 7See the 7
OATH/ECB summonses still active. Most often Construction.
0.2 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. 0 certifications filed and 2 new Class C in the last 180 days, too few to call a direction.
Since November 27, 2023, certifications were filed on 5 Class C violations, all 5 after the original certify-by date. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 12 open HPD violations have all passed. The latest was July 25, 2026.
- Zoning district
- C6-9
- Lot area
- 22,957 sq ft
- Floor area
- 473,460 sq ft
- Tax lot (BBL)
- 1-00033-0011
- Neighborhood
- Financial District-Battery Park City
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 12 open most often Heat / Hot Water | |||
| Fire Safety | Notice sent | 19051379 | ||
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges at compactor closet door at north wall at public hall, 2nd story | ||||
| Fire Safety | Notice sent | 19051378 | ||
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges at fire door at north wall stair 'c' at public hall, 2nd story | ||||
| Heat / Hot Water | Notice sent | 17719163 | ||
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment | ||||
| Invalid certification | 16651924 | |||
| § 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen | ||||
| Invalid certification | 16643849 | |||
| § 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at gas range in the kitchen | ||||
| Heat / Hot Water | No access to reinspect (first try) | 16621268 | ||
| §27-2005 (E) HMC: Provide written notice to the tenants at least twenty-four hours prior to essential service interruption by posting a notice in a prominent place within the public part of the building and on each floor of such building, where an owner must make a repair that may result in an interruption of essential services such as utilities(heat, hot water, gas, electricity, or elevator) that is expected to continue for more than two hours. Sample notice available at www.nyc.gov/hpd or as provided in this notice of violation. Missing , 1st story | ||||
| Certified late | 16621267 | |||
| § 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen | ||||
| Certified late | 16621266 | |||
| § 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen | ||||
| Heat / Hot Water | No access to reinspect (first try) | 16609195 | ||
| §27-2005 (E) HMC: Provide written notice to the tenants at least twenty-four hours prior to essential service interruption by posting a notice in a prominent place within the public part of the building and on each floor of such building, where an owner must make a repair that may result in an interruption of essential services such as utilities(heat, hot water, gas, electricity, or elevator) that is expected to continue for more than two hours. Sample notice available at www.nyc.gov/hpd or as provided in this notice of violation. Missing , 1st story | ||||
| Heat / Hot Water | Notice sent | 16609193 | ||
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment | ||||
| Heat / Hot Water | Notice sent | 16609191 | ||
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment | ||||
| Certified late | 16609189 | |||
| § 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| OATH/ECB | 7 open most often Construction | |||
| Construction, Class 2 | Hearing pending | 39206162J | NINETY FIVE WALL STREET LLC | |
| Construction, Class 2 | Hearing pending | 39206161H | NINETY FIVE WALL STREET LLC | |
| Construction, Class 2 | Hearing pending | 39206160X | NINETY FIVE WALL STREET LLC | |
| Construction, Class 1 | Found in violation | 39107033J | ||
| Construction, Class 2 | Decided by default | 35675830M | ||
| Construction, Class 1 | Hearing pending | 35675829P | ||
| Quality of Life, Class 1 | Hearing pending | 35675828N | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 12 on September 24, 2026 and 12 on November 15.
- HPD, by year
- From 2021 to 2026, HPD filed 45 violations and closed 25, all classes.
Year Filed Closed 2026 2 0 2025 1 9 2024 19 6 2023 13 9 2022 2 1 2021 8 0 - Energy benchmarking
- ENERGY STAR score 19 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- Covered from 2026 as a rent-regulated building (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed April 13, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
Hearings and penalties
- OATH hearings
- 5 hearings scheduled on DOB summonses, the first on December 10, 2026.
- OATH/ECB summonses
- 51 DOB and FDNY summonses here since January 1, 2019, with $312,667 in penalties imposed. 7 of them are still active, the same 7 listed under OATH/ECB. 22 judgments docketed, the latest on August 31, 2025. A docketed judgment shows up in a title search.
- September 30, 2026, DOB: Fail to comply with commissioner order to file certificate of correction with DOB. $1,250 penalty imposed.
- September 30, 2026, DOB: Fail to comply with commissioner order to file certificate of correction with DOB. $1,250 penalty imposed.
- September 30, 2026, DOB: Fail to comply with commissioner order to file certificate of correction with DOB. $1,250 penalty imposed.
The newest 3 of 51 summonses OATH lists here.
- Housing court
- 3 housing court cases here since 2012, most of them tenant actions. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 8 active DOB violations. The newest was issued November 13, 2024.
- DOB complaints
- 4 DOB complaints in the last 12 months, 1 of them a conversion complaint. The newest was filed August 10, 2026. A conversion complaint, like any complaint, is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 96 DOB complaints from 1996 through November 25, 2026. 122 DOB violations since 1992, 86 resolved and 28 dismissed in DOB's records.
- DOB facade
- Rated Safe with a repair and maintenance program (SWARMP) in the latest facade report, filed October 18, 2024 (inspection cycle 9). Reports in earlier inspection cycles rated it Safe in 2008 and 2013, and SWARMP in 2018.
- DOB permits
- 4 DOB work permits in effect. The latest, for Suspended Scaffold work, was issued November 19, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- Suspended Scaffold, issued November 19, 2026, in effect until July 1, 2027.
- Sidewalk Shed, issued September 23, 2026, in effect until December 22, 2026.
- Plumbing, issued June 3, 2026, in effect until December 15, 2026.
The newest 3 of 21 permits DOB NOW lists here.
The building report
- The city's wording on the 7 other open violations this page lists without it.
- What each of the 7 city statuses here means, and how many of these carry it.
- How it compares with the 799 Manhattan buildings with 200 or more apartments.
- All 21 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 51 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 7 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.