400 3rd Ave
Manhattan, NY 10016
400 3rd Avenue is an elevator building with 30 apartments, built in 2004. It has 10 open violations. The oldest open HPD violation was filed on May 4, 2026.
En español: 10 violaciones abiertas, ninguna de Clase C. La más antigua del HPD lleva 6 meses abierta, desde el 4 de mayo de 2026.
Open now, most hazardous first
Since November 27, 2023, certifications were filed on 2 Class C violations, all 2 by the original certify-by date. How certification works
The original certify-by dates on the 9 open HPD violations have all passed. The latest was November 23, 2026.
- Zoning district
- C2-8
- Lot area
- 2,963 sq ft
- Floor area
- 35,107 sq ft
- Tax lot (BBL)
- 1-00884-0042
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class B | 9 open | |||
| CIV14 mailed | 19271542 | 400 THIRD AVENUE ASSOC. LP | ||
| CIV14 mailed | 19271539 | 400 THIRD AVENUE ASSOC. LP | ||
| CIV14 mailed | 19271538 | 400 THIRD AVENUE ASSOC. LP | ||
| Not complied with | 19131469 | |||
| Not complied with | 19131467 | |||
| Not complied with | 19131458 | |||
| Not complied with | 19131445 | |||
| Not complied with | 18944591 | |||
| Not complied with | 18850240 | |||
| OATH/ECB | 1 open | |||
| Elevators, Class 1 | Hearing pending | 39188687X | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2017 to 2026, HPD filed 120 violations and closed 108, all classes.
Year Filed Closed 2026 22 20 2025 24 14 2023 7 11 2022 9 22 2021 15 11 2020 9 6 2019 3 2 2018 9 22 2017 22 0 - Energy benchmarking
- ENERGY STAR score 36 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 15, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- Tax exemption
- Has a 420-c tax exemption (DOF 2026/27 roll).
Hearings and penalties
- OATH hearings
- A hearing on a DOB summons is set for April 6, 2027.
- OATH/ECB summonses
- 8 DOB and FDNY summonses here since January 1, 2019, with $1,850 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 1 judgment docketed, on May 31, 2020. A docketed judgment shows up in a title search.
- May 14, 2026, DOB: Failure to maintain elevator or conveying system. Adjourned, $1,250 penalty imposed.
- August 14, 2025, FDNY: Inspection and testing. In violation.
- July 15, 2025, FDNY: Inspection and testing. In violation.
The newest 3 of 8 summonses OATH lists here.
- Housing court
- 2 housing court cases here since 2023, most of them tenant actions. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 4 active DOB violations. The newest was issued February 22, 2022.
- DOB complaints
- 1 DOB complaint in the last 12 months. It was filed March 11, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 50 DOB complaints from 1995 through November 25, 2026. 28 DOB violations since 1992, 8 resolved and 16 dismissed in DOB's records.
- DOB facade
- Rated Safe in the latest facade report, filed March 28, 2022 (inspection cycle 9). Reports in earlier inspection cycles rated it Safe in 2015.
- Certificate of occupancy
- DOB issued a final certificate of occupancy on August 8, 2014.
- Boiler inspection
- 4 boilers, all inspected in 2026, the latest on June 30. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 10 open violations this page lists without it.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 6,540 Manhattan buildings with 20 to 49 apartments.
- All 8 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.