319 West 94th St, Manhattan
- Built
- 1906
- Floors
- 7
- Residential units
- 124
- Building type
- Elevator building
- Zoning district
- R8
- Lot area
- 7,553 sq ft
- Floor area
- 35,427 sq ft
En español: 7 violaciones de Clase C abiertas (peligro inmediato) y 16 abiertas en total. La más antigua del HPD lleva 19 meses abierta, desde el 20 de febrero de 2025.
Open now, most hazardous first
- 7Get these certified
Class C, immediately hazardous. Most often Vermin / Infestation.
- 7See the 7
Class B, hazardous
- 2See the 2
OATH/ECB summonses still active. Most often Elevators.
Certifications are being filed faster than new violations come in. 10 certifications filed against 2 new Class C in the last 180 days.
Since October 12, 2023, certifications were filed on 21 Class C violations: 20 by the original certify-by date, 1 after it. How certification works
The original certify-by dates on the 14 open HPD violations run from September 4, 2025 to November 6, 2026. The report prints the date beside each one.
- OATH hearings
- 2 hearings scheduled on DOB summonses, the first on November 5, 2026.
- OATH/ECB summonses
- 14 DOB and FDNY summonses here since January 1, 2019, with $6,550 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB. 2 judgments docketed, the latest on November 30, 2020. A docketed judgment shows up in a title search.
- August 31, 2026, DOB: Failure to maintain elevator or conveying system. $1,250 penalty imposed.
- August 31, 2026, DOB: Failure to maintain elevator or conveying system. $625 penalty imposed.
- August 27, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms.
The newest 3 of 14 summonses OATH lists here. The report lists all 14, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 2 active DOB violations, most of them for elevators. The newest was issued November 2, 2021.
- Housing court
- 12 housing court cases here since 2008, most of them tenant actions.
- DOB complaints
- 3 DOB complaints in the 12 months to September 25, 2026. The newest was filed September 15, 2026.
- DOB facade
- Rated SWARMP in the latest facade report, filed February 21, 2024 (inspection cycle 9). Reports in earlier inspection cycles rated it Safe in 2020. SWARMP means safe with a repair and maintenance program. Need this filed?
- DOB permits
- DOB NOW lists 1 work permit here: General Construction, issued May 9, 2025, signed off.
- Certificate of occupancy
- Final, issued December 5, 2014.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- 2 boilers, both inspected in 2026, the latest on January 28. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed May 26, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- Tax exemption
- Has a 420-c tax exemption (DOF 2026/27 roll).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 7 open most often Vermin / Infestation | |||
| Fire Safety | Notice sent | 19266495 | RUSTIN HOUSE LP | |
| Vermin / Infestation | No access to reinspect (first try) | 19087884 | RUSTIN HOUSE LP | |
| Vermin / Infestation | Notice sent | 18762373 | ||
| Vermin / Infestation | Certified late | 18597851 | ||
| Vermin / Infestation | Notice sent to tenant | 18544166 | ||
| Heat / Hot Water | Notice sent | 18544165 | ||
| Vermin / Infestation | Not complied with | 18261028 | ||
| Class B | 7 open | |||
| Notice sent | 19228141 | RUSTIN HOUSE LP | ||
| Notice sent | 19167325 | RUSTIN HOUSE LP | ||
| Not complied with | 19034283 | RUSTIN HOUSE LP | ||
| Not complied with | 19034281 | RUSTIN HOUSE LP | ||
| Not complied with | 18597598 | |||
| Not complied with | 18085775 | |||
| Mold | Defect letter sent | 18245093 | ||
| OATH/ECB | 2 open most often Elevators | |||
| Elevators, Class 1 | Hearing pending | 39202484Y | RUSTIN HOUSE LP | |
| Elevators, Class 2 | Hearing pending | 39202399J | RUSTIN HOUSE LP | |
The full report on 319 West 94th St, Manhattan
- All 16 open violations, each with the city's own words and the date on its notice.
- What each of the 7 city statuses here means, and how many of these carry it.
- How it compares with the 1,033 Manhattan buildings with 100 to 199 apartments.
- All 1 DOB NOW work permit, with job numbers and each job's estimated cost.
- All 14 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 2 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 319 West 94th St, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.