Skip to content
ViolationScout49 open Class C, with nothing filed or new in the last 180 days.Your building
Buildings11 Mt Morris Park West, ManhattanCurrent through

11 Mt Morris Park West, Manhattan

BBL 1-01720-0051 Mount Morris Park Historic District

Built
1889
Floors
4.5
Residential units
17
Building type
Walk-up building
Zoning district
R7-2
Lot area
2,022 sq ft
Floor area
5,550 sq ft
Last transfer
No price recorded
Last sale
$1,500,000

En español: 49 violaciones de Clase C abiertas (peligro inmediato) y 55 abiertas en total. La más antigua del HPD lleva 38 años abierta, desde el 14 de abril de 1988.

Open now, most hazardous first

  1. 49

    Class C, immediately hazardous. Most often Heat / Hot Water.

    118 open counting every year, the oldest since

    Get these certified
  2. 4

    Class B, hazardous. Most often Fire Safety.

    See the 4
  3. 2

    OATH/ECB summonses still active

    See the 2

Open violations are sitting, with little movement either way. 49 open Class C, with nothing filed or new in the last 180 days.

Since October 12, 2023, certifications were filed on 10 Class C violations, all 10 by the original certify-by date. How certification works

The original certify-by dates on the 53 open HPD violations have all passed. The latest was December 3, 2025. The report prints the date beside each one.

Is this your building?

49 open Class C and an OATH hearing on March 23, 2027. The oldest open HPD violation was filed April 14, 1988.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

HPD vacate order
HPD's vacate order for the entire building has been in effect since October 23, 2025. Reason on the order: habitability.
Open Class C, week by week
49 on September 24, 2026 and 49 on October 8.
OATH hearings
A hearing on a DOB summons is set for March 23, 2027.
OATH/ECB summonses
27 DOB summonses here since January 1, 2019, with $133,410 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB. 17 judgments docketed, the latest on March 31, 2026. A docketed judgment shows up in a title search.
  • October 2, 2025, DOB: Failure to maintain building in code-compliant manner. Adjourned, $2,500 penalty imposed.
  • October 2, 2025, DOB: Failure to maintain building in code-compliant manner. Adjourned, $2,500 penalty imposed.
  • October 2, 2025, DOB: Temporary construction equipment installation on site expired permit shed. Adjourned, $1,250 penalty imposed.

The newest 3 of 27 summonses OATH lists here. The report lists all 27, with each outcome, the penalty imposed and any docketing date. What the report adds

DOB violations
19 active DOB violations. The newest was issued November 21, 2025.
Housing court
1 open housing court case, opened October 3, 2025. 4 housing court cases here since 2019.
DOB complaints
2 DOB complaints in the 12 months to September 25, 2026. The newest was filed October 2, 2025.
DOB permits
1 DOB work permit in effect, for Sidewalk Shed work, issued July 28, 2026.
  • Sidewalk Shed, issued July 28, 2026, in effect until October 26, 2026.
  • Sidewalk Shed, issued May 17, 2019, expired November 30, 2020.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C49 open most often Heat / Hot Water
Fire SafetyNot complied with1830648111 MT MORRIS HOLDINGS LLC
Notice sent1830100311 MT MORRIS HOLDINGS LLC
Notice sent1829964411 MT MORRIS HOLDINGS LLC
Notice sent1829964211 MT MORRIS HOLDINGS LLC
Notice sent1829963911 MT MORRIS HOLDINGS LLC
Notice sent1829963811 MT MORRIS HOLDINGS LLC
Notice sent1829963511 MT MORRIS HOLDINGS LLC
Notice sent1829963411 MT MORRIS HOLDINGS LLC
Notice sent1829962711 MT MORRIS HOLDINGS LLC
Notice sent1829962611 MT MORRIS HOLDINGS LLC
The report lists all 49, each with the city's own words and the date on its notice. What the report adds
Class B4 open most often Fire Safety
Notice sent1830128511 MT MORRIS HOLDINGS LLC
Fire SafetyNotice sent1829429311 MT MORRIS HOLDINGS LLC
Fire SafetyNotice sent1829429011 MT MORRIS HOLDINGS LLC
Notice sent16623332
OATH/ECB2 open
Construction, Class 1Hearing pending39162179Y11 MT MORRIS HOLDINGS LLC
Boilers, Class 2Found in violation37032076N

The full report on 11 Mt Morris Park West, Manhattan

Get the report on 11 Mt Morris Park West, Manhattan, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 11 Mt Morris Park West, Manhattan have open violations?

Yes. 11 Mt Morris Park West, Manhattan had 55 open violations on October 10, 2026: 53 from HPD and 2 from OATH/ECB. 49 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 38 years, since April 14, 1988.

Is 11 Mt Morris Park West, Manhattan getting better or worse?

Open violations are sitting, with little movement either way. 49 open Class C, with nothing filed or new in the last 180 days. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 11 Mt Morris Park West, Manhattan?

Since October 12, 2023, certifications were filed on 10 Class C violations, all 10 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Is an HPD vacate order in effect at 11 Mt Morris Park West, Manhattan?

Yes. HPD's vacate order for the entire building has been in effect since October 23, 2025. Reason on the order: habitability. A vacate order requires all or part of a building to be emptied for the reason on the order, and it stays in effect until HPD rescinds it. HPD Online shows whether an order has been rescinded since.

Does 11 Mt Morris Park West, Manhattan have an OATH hearing coming up?

Yes. A hearing on a DOB summons is set for March 23, 2027. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 11 Mt Morris Park West, Manhattan have active DOB violations?

Yes. 19 active DOB violations. The newest was issued November 21, 2025. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Is 11 Mt Morris Park West, Manhattan in housing court?

Yes. 1 open housing court case, opened October 3, 2025. 4 housing court cases here since 2019. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 11 Mt Morris Park West, Manhattan?

Yes. 2 DOB complaints in the 12 months to September 25, 2026. The newest was filed October 2, 2025. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any DOB work permits in effect at 11 Mt Morris Park West, Manhattan?

Yes. 1 DOB work permit in effect, for Sidewalk Shed work, issued July 28, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

When was 11 Mt Morris Park West, Manhattan built?

The city's record gives 1889 as the year 11 Mt Morris Park West, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up building with 4.5 floors.

How many apartments does 11 Mt Morris Park West, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 17 residential units at 11 Mt Morris Park West, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on HPD vacate orders, OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, DOB NOW work permits, the city's PLUTO tax-lot file and DOF's property sales records. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus HPD vacate orders, OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, DOB NOW work permits, the city's PLUTO tax-lot file and DOF's property sales records. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 11 Mt Morris Park West, Manhattan: 17 units, 49 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/11-mt-morris-park-west-manhattan

How we count: /method.

Is this your building?