137 West 144th St
Manhattan, NY 10030
137 West 144th Street is a walk-up building with 20 apartments, built in 1920. It has 4 open violations, 2 of them Class C, immediately hazardous. The oldest open HPD violation was filed on May 17, 2024.
En español: 2 violaciones de Clase C abiertas (peligro inmediato) y 4 abiertas en total. La más antigua del HPD lleva 2 años abierta, desde el 17 de mayo de 2024.
Open now, most hazardous first
- 2Get these certified
Class C, immediately hazardous, filed in the last 3 years
- 2See the 2
Class B, hazardous, filed in the last 3 years
1.0 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. 1 certification filed and 0 new Class C in the last 180 days, too few to call a direction.
Since November 27, 2023, certifications were filed on 7 Class C violations, all 7 by the original certify-by date. How certification works
The original certify-by dates on the 4 open HPD violations have all passed. The latest was October 12, 2026.
- Zoning district
- R7-2
- Lot area
- 5,304 sq ft
- Floor area
- 18,005 sq ft
- Last sale
- $11,518,356 for 8 lots
- Tax lot (BBL)
- 1-02013-0012
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 2 open | |||
| Heat / Hot Water | Notice sent | 18360669 | ||
| § 27-2033 ADM CODE Provide ready access to buildings heating system boiler room door locked at boiler room | ||||
| Fire Safety | Notice sent | 16981038 | ||
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective latch set at fire door leading to east yard at public hall, 1st story | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 2 open | |||
| Certified on time | 19155441 | WEST 144 CLUSTER, LLC | ||
| Notice sent | 17265716 | |||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2017 to 2026, HPD filed 48 violations and closed 60, all classes.
Year Filed Closed 2026 11 13 2025 14 10 2024 6 1 2021 2 13 2020 0 1 2019 11 19 2018 4 0 2017 0 3 - Energy benchmarking
- ENERGY STAR score 55 for 2025, against a median of 69 for Multifamily Housing that year.
- Bedbug report
- Filed December 9, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- Tax exemption
- Has a 420-c tax exemption (DOF 2026/27 roll).
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 27, 2023: a general construction order, opened July 15, 2024, awarded for $487. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
DOB records
- DOB violations
- 1 active DOB violation, issued July 9, 2026.
- DOB complaints
- 1 DOB complaint in the last 12 months. It was filed July 10, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 2 DOB complaints from 2024 through November 25, 2026. 5 DOB violations since 1995, 4 dismissed in DOB's records.
- DOB permits
- DOB NOW lists 2 work permits here, the newest issued July 6, 2023, for Plumbing work.
- Plumbing, issued July 6, 2023, signed off.
- General Construction, issued May 5, 2022, expired August 7, 2022.
- Boiler inspection
- Inspected November 17, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Hearings and penalties
- Housing court
- 2 housing court cases here since 2005. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
The building report
- The city's wording on the 2 other open violations this page lists without it.
- What each of the 2 city statuses here means, and how many of these carry it.
- How it compares with the 6,540 Manhattan buildings with 20 to 49 apartments.
- All 2 DOB NOW work permits, with job numbers and each job's estimated cost.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.