162 West 144th St
Harlem, Manhattan, NY 10030
162 West 144th Street is a walk-up building with 15 apartments, built in 1920. It has 12 open violations, 11 of them Class C, immediately hazardous. The oldest open HPD violation was filed on December 4, 2024.
En español: 11 violaciones de Clase C abiertas (peligro inmediato) y 12 abiertas en total. La más antigua del HPD lleva 23 meses abierta, desde el 4 de diciembre de 2024.
Open now, most hazardous first
- 11Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Heat / Hot Water.
- 1See it
OATH/ECB summons still active
7.3 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. 0 certifications filed and 3 new Class C in the last 180 days, too few to call a direction.
Since November 16, 2023, certifications were filed on 3 Class C violations, all 3 after the original certify-by date. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 11 open HPD violations have all passed. The latest was October 5, 2026.
- Zoning district
- R7-2
- Lot area
- 3,747 sq ft
- Floor area
- 12,820 sq ft
- Tax lot (BBL)
- 1-02012-0058
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 11 open most often Heat / Hot Water | ||
| Fire Safety | Notice sent | 19226456 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective latch at vestibule door | |||
| Fire Safety | To be reinspected | 18990752 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective latch set at vestibule door , 1st story | |||
| Vermin / Infestation | Not complied with | 18975376 | |
| 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. Evidence found at sidewalk at front areaway, 1st story | |||
| Heat / Hot Water | Not complied with | 18472879 | |
| § 27-2033 ADM CODE Provide ready access to buildings heating system door locked at basement | |||
| Fire Safety | To be reinspected | 18344673 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective latchset at vestibule door at public hall, 1st story | |||
| Heat / Hot Water | Not complied with | 17979591 | |
| § 27-2033 ADM CODE Provide ready access to buildings heating system boiler room door locked at cellar | |||
| Heat / Hot Water | Not complied with | 17741371 | |
| § 27-2033 ADM CODE Provide ready access to buildings heating system door locked at cellar at boiler room | |||
| Heat / Hot Water | Not complied with | 17649969 | |
| § 27-2033 ADM CODE Provide ready access to buildings heating system door locked at cellar at boiler room | |||
| Heat / Hot Water | Not complied with | 17631387 | |
| § 27-2033 ADM CODE Provide ready access to buildings heating system boiler room lock door at cellar | |||
| Heat / Hot Water | Not complied with | 17594355 | |
| § 27-2033 ADM CODE Provide ready access to buildings heating system door locked at basement | |||
| Heat / Hot Water | Not complied with | 17508167 | |
| § 27-2033 ADM CODE Provide ready access to buildings heating system no access to boiler room, locked door at 1st boiler room from east | |||
| In HPD's words. Apartment numbers are left out. | |||
| OATH/ECB | 1 open | ||
| Boilers, Class 2 | In violation (POP) | 39132227M | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 15 on September 24, 2026 and 14 on November 8.
- HPD, by year
- From 2022 to 2026, HPD filed 44 violations and closed 37, all classes.
Year Filed Closed 2026 8 17 2025 34 16 2024 2 0 2022 0 4 - Bedbug report
- Filed August 6, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Tax exemption
- Has an NYC Housing Authority tax exemption (DOF 2026/27 roll).
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 16, 2023: a general construction order, opened August 19, 2026, awarded for $1,977. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH/ECB summonses
- 2 DOB and FDNY summonses here since January 1, 2019, with $625 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB.
- December 6, 2024, DOB: Fail maintain building in compliant manner: Service equipment - boiler. In violation, $625 penalty imposed.
- May 11, 2021, FDNY: Inspection and testing. In violation.
DOB records
- DOB, all years
- 2 DOB complaints from 2024 through November 14, 2026. 10 DOB violations since 1993, 10 dismissed in DOB's records.
- DOB permits
- 3 DOB work permits in effect. The latest, for Mechanical Systems work, was issued May 13, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- Mechanical Systems, issued May 13, 2026, in effect until December 6, 2026.
- Suspended Scaffold, issued May 5, 2026, in effect until April 1, 2027.
- General Construction, issued April 16, 2026, signed off.
The newest 3 of 10 permits DOB NOW lists here.
- Boiler inspection
- 3 boilers, inspected between December 23, 2025 and October 13, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 1 other open violation this page lists without it.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 11,097 Manhattan buildings with 6 to 19 apartments.
- All 10 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 2 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.