495 West 187th St
Manhattan, NY 10040
495 West 187th Street is an elevator building with 49 apartments, built in 1942. It has 7 open violations, 1 of them Class C, immediately hazardous. The oldest open HPD violation was filed on November 8, 2018.
En español: 1 violación de Clase C abierta (peligro inmediato) y 7 abiertas en total. La más antigua del HPD lleva 8 años abierta, desde el 8 de noviembre de 2018.
Open now, most hazardous first
- 1Get it certified
Class C, immediately hazardous, filed in the last 3 years
- 6See the 6
Class B, hazardous, filed in the last 3 years. Most often Fire Safety.
0.2 open Class C per 10 apartments. Across the city: 0.7.
Certifications are being filed at least twice as fast as new violations come in. 10 certifications filed against 0 new Class C in the last 180 days.
Since November 27, 2023, certifications were filed on 12 Class C violations: 10 by the original certify-by date, 2 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 7 open HPD violations have all passed. The latest was August 31, 2026.
- Zoning district
- R7-2
- Lot area
- 10,901 sq ft
- Floor area
- 50,700 sq ft
- Tax lot (BBL)
- 1-02149-0108
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 1 open | ||
| Fire Safety | Not complied with | 18962461 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges in the entrance | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 6 open most often Fire Safety | ||
| Fire Safety | Notice sent | 19072443 | |
| Fire Safety | Notice sent | 19072441 | |
| Not complied with | 18962457 | ||
| Not complied with | 18946944 | ||
| Fire Safety | No access to reinspect (first try) | 18427319 | |
| Fire Safety | No access to reinspect (first try) | 18427318 | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2017 to 2026, HPD filed 255 violations and closed 342, all classes.
Year Filed Closed 2026 12 65 2025 12 14 2024 17 13 2023 43 18 2022 23 12 2021 80 148 2020 2 8 2019 24 7 2018 31 56 2017 11 1 - Energy benchmarking
- ENERGY STAR score 65 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 10, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair orders
- 3 completed HPD emergency repair orders since November 27, 2023, awarded for $5,320 in total. The most recent of the 3, a general construction order, was opened June 17, 2026. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
DOB records
- DOB violations
- 2 active DOB violations, most of them for boiler filings under Local Law 62/91. The newest was issued February 13, 2004.
- DOB complaints
- 1 DOB complaint in the last 12 months. It was filed September 15, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 36 DOB complaints from 2003 through November 25, 2026. 19 DOB violations since 1988, 10 resolved and 7 dismissed in DOB's records.
- DOB facade
- Rated Safe in the latest facade report, filed August 13, 2025 (inspection cycle 10). Reports in earlier inspection cycles rated it Safe in 2007, Safe with a repair and maintenance program (SWARMP) in 2012, and Safe in 2018 and 2021.
- Boiler inspection
- Inspected March 25, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Hearings and penalties
- Housing court
- 5 housing court cases here since 2009. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
The building report
- The city's wording on the 6 other open violations this page lists without it.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 6,540 Manhattan buildings with 20 to 49 apartments.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.