1025 College Ave
Bronx, NY 10456
1025 College Avenue is a three-family house, built in 1920. It has 29 open violations, 11 of them Class C, immediately hazardous. The oldest open HPD violation was filed on November 27, 2002.
En español: 11 violaciones de Clase C abiertas (peligro inmediato) y 29 abiertas en total. La más antigua del HPD lleva 23 años abierta, desde el 27 de noviembre de 2002.
Open now, most hazardous first
- 11Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Heat / Hot Water.
- 18See the 18
Class B, hazardous, filed in the last 3 years. Most often Fire Safety.
36.7 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.
The original certify-by dates on the 29 open HPD violations have all passed. The latest was February 27, 2026.
- Zoning district
- R7-1
- Lot area
- 1,707 sq ft
- Floor area
- 3,708 sq ft
- Last transfer
- No price recorded
- Last sale
- $1,075,000
- Tax lot (BBL)
- 2-02437-0036
- Neighborhood
- Concourse-Concourse Village
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 11 open most often Heat / Hot Water | |||
| Heat / Hot Water | Notice sent | 18578832 | Yazna Holdings LLC | |
| § 27-2033 ADM CODE Provide ready access to buildings heating system door locked at boiler room | ||||
| Heat / Hot Water | Notice sent | 18578831 | Yazna Holdings LLC | |
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment | ||||
| Heat / Hot Water | Notice sent | 18563819 | Yazna Holdings LLC | |
| § 27-2033 ADM CODE Provide ready access to buildings heating system locked door at boiler room | ||||
| Vermin / Infestation | Notice sent to tenant | 18558123 | Yazna Holdings LLC | |
| 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. Evidence found at observed droopings in the entire apartment | ||||
| Heat / Hot Water | Notice sent | 18558120 | Yazna Holdings LLC | |
| § 27-2033 ADM CODE Provide ready access to buildings heating system door locked at boiler room | ||||
| Heat / Hot Water | Notice sent | 18489871 | Yazna Holdings LLC | |
| § 27-2033 ADM CODE Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing , 1st story | ||||
| Heat / Hot Water | Notice sent | 18489866 | Yazna Holdings LLC | |
| § 27-2033 ADM CODE Provide ready access to buildings heating system lock door at boiler room | ||||
| Vermin / Infestation | Notice sent | 18067026 | ||
| 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. Evidence found at rats at cellar | ||||
| Vermin / Infestation | Notice sent to tenant | 18067020 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Notice sent to tenant | 18067019 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Notice sent | 18067017 | |||
| § 27-2005 ADM CODE Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 18 open most often Fire Safety | |||
| Notice sent | 18558125 | Yazna Holdings LLC | ||
| Notice sent | 18558124 | Yazna Holdings LLC | ||
| Fire Safety | Notice sent | 18558122 | Yazna Holdings LLC | |
| Fire Safety | Notice sent | 18558121 | Yazna Holdings LLC | |
| Notice sent | 18489869 | Yazna Holdings LLC | ||
| Fire Safety | Notice sent | 18489868 | Yazna Holdings LLC | |
| Fire Safety | Notice sent | 18489867 | Yazna Holdings LLC | |
| Notice sent | 18067028 | |||
| Notice sent | 18067025 | |||
| Notice sent | 18067024 | |||
| Notice sent | 18067022 | |||
| Notice sent | 18067018 | |||
| Notice sent | 18067016 | |||
| Notice sent | 18067015 | |||
| Notice sent | 18067014 | |||
| Notice sent | 18067013 | |||
| Notice sent | 18067012 | |||
| Notice sent | 18067011 | |||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2017 to 2026, HPD filed 59 violations and closed 23, all classes.
Year Filed Closed 2026 11 2 2025 32 9 2024 2 0 2023 2 3 2022 7 2 2021 2 7 2019 1 0 2018 1 0 2017 1 0 - Bedbug report
- Filed December 29, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 27, 2023: a general construction order, opened December 17, 2025, awarded for $295. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- DOF tax lien sale
- Listed for DOF's 2025 tax lien sale, for water and sewer charges only. The last list it appeared on was the 10-day notice of May 2025.
DOB records
- DOB complaints
- 1 DOB complaint in the last 12 months. It was filed December 13, 2025. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 1 DOB complaint from 2025 through November 25, 2026.
The building report
- The city's wording on the 18 other open violations this page lists without it.
- What each of the 2 city statuses here means, and how many of these carry it.
- How it compares with the 66,352 Bronx buildings with 1 to 5 apartments.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.