Skip to content
ViolationScout13 open Class C, with nothing filed or new in the last 180 days.Is this your building?
Buildings112 Harrison Place, BrooklynCurrent through

112 Harrison Pl, Brooklyn

BBL 3-03004-0029

En español: 13 violaciones de Clase C abiertas (peligro inmediato) y 20 abiertas en total.

Open violations are sitting, with little movement either way. 13 open Class C, with nothing filed or new in the last 180 days.

Is this your building?

13 open Class C.

We read every request ourselves. When a compliance firm we work with can take the building, we introduce you to that one firm. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: which violations matter, and how long this kind usually takes to clear. It is not on sale yet.

See what the report covers

HPD takes complaints from tenants through 311.

OATH hearings
3 hearings scheduled on DOB summonses, the first on December 2, 2026.
DOB violations
8 active DOB violations, most of them for low-pressure boilers. The newest was issued June 30, 2023.
DOB complaints
1 DOB complaint in the last 12 months. It was filed September 22, 2026.
DOB permits
2 DOB work permits in effect. The latest, for Plumbing work, was issued September 24, 2026.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class C13 open most often Fire Safety
Heat / Hot WaterNotice sent16713476
Fire SafetyNotice sent16713475
Fire SafetyNotice sent16713472
Heat / Hot WaterNotice sent16713471
Notice sent16713470
Fire SafetyNotice sent16694416
Notice sent16644143
Fire SafetyNotice sent16644142
Heat / Hot WaterNotice sent16644141
Heat / Hot WaterNotice sent16644138
Fire SafetyNotice sent16644137
Notice sent16644136
Fire SafetyNotice sent16486295
Class B4 open most often Fire Safety
Fire SafetyNotice sent16713474
Fire SafetyNotice sent16713473
Fire SafetyNotice sent16644140
Fire SafetyNotice sent16644139
OATH/ECB3 open most often Construction
Construction, Class 2Hearing pending39205124Y
Construction, Class 1Hearing pending39205123M
Class 2Hearing pending39205122K

Nearby buildings

Questions about this building

Does 112 Harrison Place, Brooklyn have open violations?

Yes. 112 Harrison Place, Brooklyn had 20 open violations on September 26, 2026: 3 from OATH/ECB and 17 from HPD. 13 are Class C, the class HPD treats as immediately hazardous.

Is 112 Harrison Place, Brooklyn getting better or worse?

Open violations are sitting, with little movement either way. 13 open Class C, with nothing filed or new in the last 180 days. That window ends September 26, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

Does 112 Harrison Place, Brooklyn have an OATH hearing coming up?

Yes. 3 hearings scheduled on DOB summonses, the first on December 2, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 112 Harrison Place, Brooklyn have active DOB violations?

Yes. 8 active DOB violations, most of them for low-pressure boilers. The newest was issued June 30, 2023. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has DOB received complaints about 112 Harrison Place, Brooklyn?

Yes. 1 DOB complaint in the last 12 months. It was filed September 22, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any DOB work permits in effect at 112 Harrison Place, Brooklyn?

Yes. 2 DOB work permits in effect. The latest, for Plumbing work, was issued September 24, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

When was 112 Harrison Place, Brooklyn built?

The city's record gives 1930 as the year 112 Harrison Place, Brooklyn was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a residence with stores or offices with 3 floors.

How many apartments does 112 Harrison Place, Brooklyn have?

The Department of City Planning's PLUTO tax-lot file lists 4 residential units at 112 Harrison Place, Brooklyn. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH hearing dates, DOB violations, DOB complaints, DOB NOW work permits and the city's PLUTO tax-lot file. This page is current through September 26, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH hearing dates, DOB violations, DOB complaints, DOB NOW work permits and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 112 Harrison Pl, Brooklyn: 13 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 26, 2026. https://violationscout.com/building/112-harrison-place-brooklyn

How we count: /method.

Is this your building?