118 Fulton St
Manhattan, NY 10038
118 Fulton Street is an elevator building with 483 apartments, built in 2016. It has 3 open violations, 3 of them Class C, immediately hazardous. The oldest open HPD violation was filed on December 30, 2025.
En español: 3 violaciones de Clase C abiertas (peligro inmediato). La más antigua del HPD lleva 10 meses abierta, desde el 30 de diciembre de 2025.
Open now
- 3Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Heat / Hot Water.
0.1 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.
Since November 27, 2023, a certification was filed on 1 Class C violation, by the original certify-by date. How certification works
The original certify-by dates on the 3 open HPD violations have all passed. The latest was September 21, 2026.
- Zoning district
- C6-4
- Lot area
- 8,320 sq ft
- Floor area
- 440,553 sq ft
- Last sale
- $487,500,000
- Tax lot (BBL)
- 1-00078-0047
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 3 open most often Heat / Hot Water | ||
| Vermin / Infestation | Notice sent to tenant | 19154242 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| Heat / Hot Water | Notice sent | 18540704 | |
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment | |||
| Heat / Hot Water | Notice sent | 18540703 | |
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment | |||
| In HPD's words. Apartment numbers are left out. | |||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2019 to 2026, HPD filed 7 violations and closed 2, all classes.
Year Filed Closed 2026 3 1 2025 3 0 2019 1 1 - Energy benchmarking
- ENERGY STAR score 53 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 3, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
Hearings and penalties
- OATH/ECB summonses
- 26 DOB and FDNY summonses here since January 1, 2019, with $13,800 in penalties imposed. 8 judgments docketed, the latest on November 4, 2026. A docketed judgment shows up in a title search.
- October 19, 2026, FDNY: Inspection and testing.
- October 19, 2026, FDNY: Labels markings.
- October 19, 2026, FDNY: Recordkeeping.
The newest 3 of 26 summonses OATH lists here.
DOB records
- DOB complaints
- 11 DOB complaints in the last 12 months. The newest was filed November 10, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 70 DOB complaints from 2016 through November 25, 2026. 18 DOB violations since 1989, 11 resolved and 7 dismissed in DOB's records.
- DOB facade
- No Report Filed for inspection cycle 9.
- DOB permits
- 2 DOB work permits in effect. The latest, for Structural work, was issued April 17, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- Mechanical Systems, issued September 9, 2026, expired October 5, 2026.
- Structural, issued April 17, 2026, in effect until April 17, 2027.
- General Construction, issued March 10, 2026, in effect until March 10, 2027.
The newest 3 of 14 permits DOB NOW lists here.
- Certificate of occupancy
- DOB issued a final certificate of occupancy on December 3, 2019.
- Boiler inspection
- 3 boilers, all inspected in 2026, the latest on May 5. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- What each of the 2 city statuses here means, and how many of these carry it.
- How it compares with the 799 Manhattan buildings with 200 or more apartments.
- All 14 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 26 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.