1270 East 18th St
Midwood, Brooklyn, NY 11230
1270 East 18th Street is an elevator building with 65 apartments, built in 1937. It has 22 open violations, 14 of them Class C, immediately hazardous. The oldest open HPD violation was filed on December 13, 1991.
En español: 14 violaciones de Clase C abiertas (peligro inmediato) y 22 abiertas en total. La más antigua del HPD lleva 34 años abierta, desde el 13 de diciembre de 1991.
Open now, most hazardous first
- 14Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.
- 8See the 8
Class B, hazardous, filed in the last 3 years
2.2 open Class C per 10 apartments. Across the city: 0.7.
Certifications are being filed at least twice as fast as new violations come in. 14 certifications filed against 0 new Class C in the last 180 days.
Since November 27, 2023, certifications were filed on 71 Class C violations: 69 by the original certify-by date, 2 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 22 open HPD violations have all passed. The latest was October 30, 2026.
- Zoning district
- R7A
- Lot area
- 24,000 sq ft
- Floor area
- 64,800 sq ft
- Last sale
- $11,550,000 for 2 lots
- Tax lot (BBL)
- 3-06737-0023
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 14 open most often Lead Paint | |||
| Fire Safety | Notice sent | 18615792 | ||
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges in the entrance | ||||
| Lead Paint | Notice sent | 18583604 | ||
| § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 MG/CM2 (28 RCNY §11-07(B)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six | ||||
| Heat / Hot Water | Notice sent | 18572452 | ||
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the 1st room from north at west | ||||
| Fire Safety | Not complied with | 18524797 | ||
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective latch set in the entrance | ||||
| Fire Safety | Not complied with | 18481117 | ||
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance | ||||
| Notice sent | 18374852 | |||
| § 27-2005 HMC: Properly repair or replace the broken or defective spring balance at upper window sash at west wall fire escape window in the 1st room from north at west | ||||
| Lead Paint | Notice sent | 17714538 | ||
| § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six | ||||
| Lead Paint | Notice sent | 17693148 | ||
| § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six | ||||
| Vermin / Infestation | No access to reinspect (first try) | 17686247 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | No access to reinspect (first try) | 17672061 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Lead Paint | Notice sent | 17324728 | ||
| § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six | ||||
| Heat / Hot Water | Not complied with | 16931740 | ||
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment | ||||
| Lead Paint | Notice sent | 16765668 | ||
| § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six | ||||
| Lead Paint | Notice sent | 16756035 | ||
| § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 8 open | |||
| CIV14 mailed | 19208949 | M & M RIDGE PROPERTIES LLC | ||
| CIV14 mailed | 19208947 | M & M RIDGE PROPERTIES LLC | ||
| Notice sent | 18573814 | |||
| Notice sent | 18551202 | |||
| Notice sent | 18551201 | |||
| No access to reinspect (first try) | 17686254 | |||
| No access to reinspect (first try) | 17686253 | |||
| Mold | Defect letter sent | 17586341 | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 15 on September 24, 2026 and 14 on November 15.
- HPD, by year
- From 2022 to 2026, HPD filed 322 violations and closed 370, all classes.
Year Filed Closed 2026 42 92 2025 136 188 2024 118 68 2023 22 22 2022 4 0 - Energy benchmarking
- ENERGY STAR score 86 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 2, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair orders
- 5 completed HPD emergency repair orders since November 27, 2023, awarded for $32,712 in total. The most recent of the 5, a lead paint order, was opened March 26, 2026. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH/ECB summonses
- 7 DOB and FDNY summonses here since January 1, 2019, with $3,725 in penalties imposed. 2 judgments docketed, the latest on March 31, 2026. A docketed judgment shows up in a title search.
- July 14, 2025, FDNY: Recordkeeping. In violation, $725 penalty imposed.
- November 14, 2024, FDNY: Inspection and testing. In violation, $750 penalty imposed.
- July 12, 2024, FDNY: Inspection and testing. Decided by default, $1,000 penalty imposed.
The newest 3 of 7 summonses OATH lists here.
- Housing court
- 1 housing court case here, opened in 2025. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB complaints
- 2 DOB complaints in the last 12 months. The newest was filed September 29, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 24 DOB complaints from 1993 through November 25, 2026. 18 DOB violations since 1989, 11 resolved and 7 dismissed in DOB's records.
- Boiler inspection
- Inspected June 16, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 8 other open violations this page lists without it.
- What each of the 5 city statuses here means, and how many of these carry it.
- How it compares with the 1,835 Brooklyn buildings with 50 to 99 apartments.
- All 7 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.