129 Wadsworth Ave
Washington Heights, Manhattan, NY 10033
129 Wadsworth Avenue is an elevator building with 28 apartments, built in 1920. It has 14 open violations, 9 of them Class C, immediately hazardous. The oldest open HPD violation was filed on February 15, 2020.
En español: 9 violaciones de Clase C abiertas (peligro inmediato) y 14 abiertas en total. La más antigua del HPD lleva 6 años abierta, desde el 15 de febrero de 2020.
Open now, most hazardous first
- 9Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Vermin / Infestation.
- 5See the 5
Class B, hazardous, filed in the last 3 years
3.2 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. 0 certifications filed and 7 new Class C in the last 180 days, too few to call a direction.
Since November 16, 2023, certifications were filed on 3 Class C violations, all 3 by the original certify-by date. How certification works
The original certify-by dates on the 14 open HPD violations run from June 7, 2025 to December 14, 2026.
- Zoning district
- R7-2
- Lot area
- 7,500 sq ft
- Floor area
- 36,450 sq ft
- Tax lot (BBL)
- 1-02162-0032
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 9 open most often Vermin / Infestation | |||
| Notice sent | 19242667 | 129 WADSWORTH MGMT CORP | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective glass panes at upper and lower window sash at all windows in the entire apartment | ||||
| Notice sent | 19242653 | 129 WADSWORTH MGMT CORP | ||
| § 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of fire damage at ceiling and walls., windows broken in the entire apartment | ||||
| Notice sent | 19241603 | 129 WADSWORTH MGMT CORP | ||
| § 27-2005 ADM CODE Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 8th room from east at south | ||||
| Notice sent | 19241156 | 129 WADSWORTH MGMT CORP | ||
| § 27-2005 ADM CODE Properly repair with similar material the broken or defective wood decking and asphalt material at roof | ||||
| Notice sent | 19241155 | 129 WADSWORTH MGMT CORP | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective glass panes at upper and lower sash at 3rd window from south at west wall at bulkhead | ||||
| Notice sent | 19241150 | 129 WADSWORTH MGMT CORP | ||
| § 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of fire damage at walls and ceilings. In the entire apartment | ||||
| Notice sent | 19241146 | 129 WADSWORTH MGMT CORP | ||
| § 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of fire damage at walls and ceilings in the entire apartment | ||||
| Vermin / Infestation | Notice sent to tenant | 17880913 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Vermin / Infestation | Notice sent to tenant | 17880912 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 5 open | |||
| Notice sent | 19324553 | 129 WADSWORTH MGMT CORP | ||
| Notice sent | 19324496 | 129 WADSWORTH MGMT CORP | ||
| Notice sent | 19241607 | 129 WADSWORTH MGMT CORP | ||
| Notice sent | 19241604 | 129 WADSWORTH MGMT CORP | ||
| Notice sent | 19241153 | 129 WADSWORTH MGMT CORP | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD vacate order
- HPD's vacate order for part of the building has been in effect since September 29, 2026. Reason on the order: fire damage.
- Open Class C, week by week
- 10 on September 24, 2026 and 9 on November 8.
- HPD, by year
- From 2017 to 2026, HPD filed 273 violations and closed 261, all classes.
Year Filed Closed 2026 26 11 2025 11 53 2024 22 0 2023 2 4 2022 4 5 2021 10 3 2020 24 38 2019 50 61 2018 58 49 2017 66 37 - Energy benchmarking
- ENERGY STAR score 2 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 4, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
Hearings and penalties
- OATH/ECB summonses
- 4 DOB and FDNY summonses here since January 1, 2019, with $4,375 in penalties imposed. 1 judgment docketed, on February 28, 2025. A docketed judgment shows up in a title search.
- September 23, 2026, FDNY: Labels markings.
- September 23, 2026, FDNY: Certificates of fitness and certificates of qualification.
- August 28, 2024, DOB: Sign panel not provided or not in compliance with section. Decided by default, $3,125 penalty imposed.
The newest 3 of 4 summonses OATH lists here.
- Housing court
- 12 housing court cases here since 2005. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 4 active DOB violations. The newest was issued February 21, 2024.
- DOB complaints
- 1 DOB complaint in the last 12 months. It was filed December 9, 2025. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 43 DOB complaints from 1993 through November 14, 2026. 29 DOB violations since 1988, 14 resolved and 11 dismissed in DOB's records.
- DOB facade
- Rated Safe in the latest facade report, filed August 19, 2025 (inspection cycle 9). An earlier report in this cycle, filed February 21, 2024, rated it Unsafe. Reports in earlier inspection cycles rated it Unsafe in 2007, Safe with a repair and maintenance program (SWARMP) in 2011, Unsafe in 2015, and Safe in 2017 and 2018.
- DOB permits
- DOB NOW lists 4 work permits here, the newest issued October 30, 2025, for General Construction work.
- General Construction, issued October 30, 2025, signed off.
- Suspended Scaffold, issued March 31, 2025, signed off.
- General Construction, issued March 31, 2025, signed off.
The newest 3 of 4 permits DOB NOW lists here.
- Boiler inspection
- Inspected May 11, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 5 other open violations this page lists without it.
- What each of the 2 city statuses here means, and how many of these carry it.
- How it compares with the 6,545 Manhattan buildings with 20 to 49 apartments.
- All 4 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 4 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.