139 Stuyvesant Ave
Bedford-Stuyvesant, Brooklyn, NY 11221
139 Stuyvesant Avenue is a building with stores or offices and 3 apartments, built in 1931. It has 21 open violations, 15 of them Class C, immediately hazardous. The oldest open HPD violation was filed on April 13, 2021.
En español: 15 violaciones de Clase C abiertas (peligro inmediato) y 21 abiertas en total. La más antigua del HPD lleva 5 años abierta, desde el 13 de abril de 2021.
Open now, most hazardous first
- 15Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Heat / Hot Water.
- 4See the 4
Class B, hazardous, filed in the last 3 years
- 2See the 2
OATH/ECB summonses still active. Most often Construction.
50.0 open Class C per 10 apartments. Across the city: 0.7.
New violations are coming in at least twice as fast as certifications are filed. 15 new Class C against 0 certifications filed in the last 180 days.
The original certify-by dates on the 19 open HPD violations have all passed. The latest was November 10, 2026.
- Zoning district
- R6A
- Lot area
- 1,500 sq ft
- Floor area
- 4,400 sq ft
- Tax lot (BBL)
- 3-01621-0010
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 15 open most often Heat / Hot Water | |||
| Notice sent | 19240759 | 1404 LLC | ||
| § 27-2005 ADM CODE Properly repair with similar material the broken or defective wood decking and asphalt materials at roof | ||||
| Fire Safety | Notice sent | 19240751 | 1404 LLC | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective door at bulkhead leading to roof | ||||
| Notice sent | 19240746 | 1404 LLC | ||
| § 27-2037, 2038 HMC: Provide a safe and adequate supply of electric service to the fixtures at ceiling and walls at public hall, 4th story | ||||
| Notice sent | 19240741 | 1404 LLC | ||
| § 27-2037, 2038 HMC: Provide a safe and adequate supply of electric service to the fixtures at ceiling and walls at public hall, 3rd story | ||||
| Notice sent | 19240735 | 1404 LLC | ||
| § 27-2037, 2038 HMC: Provide a safe and adequate supply of electric service to the fixtures at ceiling and walls at public hall, 2nd story | ||||
| Notice sent | 19240728 | 1404 LLC | ||
| § 27-2037, 2038 HMC: Provide a safe and adequate supply of electric service to the fixtures at ceiling and walls at public hall, 1st story | ||||
| Notice sent | 19240679 | 1404 LLC | ||
| § 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen | ||||
| Heat / Hot Water | Notice sent | 19240676 | 1404 LLC | |
| § 27-2024 ADM CODE Provide adequate supply of hot water for the fixtures at kitchen and bathroom in the entire apartment | ||||
| Notice sent | 19240669 | 1404 LLC | ||
| § 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of fire damage at ceiling , walls and floors. Windows broken and plywood sealed. In the entire apartment | ||||
| Notice sent | 19240661 | 1404 LLC | ||
| § 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen | ||||
| Heat / Hot Water | Notice sent | 19240657 | 1404 LLC | |
| § 27-2024 ADM CODE Provide adequate supply of hot water for the fixtures at kitchen and bathroom in the entire apartment | ||||
| Notice sent | 19240654 | 1404 LLC | ||
| § 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of fire damage at ceiling and walls. In the entire apartment | ||||
| Notice sent | 19240636 | 1404 LLC | ||
| § 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at range in the kitchen | ||||
| Heat / Hot Water | Notice sent | 19240629 | 1404 LLC | |
| § 27-2024 ADM CODE Provide adequate supply of hot water for the fixtures at kitchen and bathroom in the entire apartment | ||||
| Notice sent | 19240618 | 1404 LLC | ||
| § 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of fire damage at ceiling and walls. In the entire apartment | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 4 open | |||
| Notice sent | 19240743 | 1404 LLC | ||
| Notice sent | 19240738 | 1404 LLC | ||
| Notice sent | 19240732 | 1404 LLC | ||
| Notice sent | 19240719 | 1404 LLC | ||
| OATH/ECB | 2 open most often Construction | |||
| Construction, Class 1 | Hearing pending | 39204046N | 1404 LLC | |
| Construction, Class 2 | Decided by default | 39100507K | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD vacate order
- HPD's vacate order for the entire building has been in effect since September 23, 2026. Reason on the order: fire damage.
- Open Class C, week by week
- 15 on September 24, 2026 and 15 on November 15.
- HPD, by year
- From 2017 to 2026, HPD filed 33 violations and closed 4, all classes.
Year Filed Closed 2026 25 0 2025 1 0 2024 1 0 2023 1 1 2022 2 0 2021 2 1 2019 1 1 2017 0 1
Hearings and penalties
- OATH hearings
- A hearing on a DOB summons is set for November 25, 2026.
- OATH/ECB summonses
- 2 DOB summonses here since January 1, 2019, with $5,625 in penalties imposed. All 2 are still active, the same 2 listed under OATH/ECB. 1 judgment docketed, on May 31, 2024. A docketed judgment shows up in a title search.
- September 14, 2026, DOB: Unsafe storage of combustible material and equipment. $2,500 penalty imposed.
- December 1, 2023, DOB: Failure to maintain building in code-compliant manner. Decided by default, $3,125 penalty imposed.
- Housing court
- 1 housing court case here, opened in 2009. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 6 active DOB violations. The newest was issued September 14, 2026.
- DOB complaints
- 3 DOB complaints in the last 12 months. The newest was filed September 15, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 9 DOB complaints from 2005 through November 25, 2026. 28 DOB violations since 1993, 22 dismissed in DOB's records.
- Boiler inspection
- Inspected January 16, 2025.
The building report
- The city's wording on the 6 other open violations this page lists without it.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 223,273 Brooklyn buildings with 1 to 5 apartments.
- All 2 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 2 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.