Skip to content
ViolationScout41 certifications filed against 8 new Class C in the last 180 days.Your building
Buildings1590 East 102 Street, BrooklynCurrent through

1590 East 102nd St, Brooklyn

BBL 3-08329-0225

Built
1950
Floors
8
Residential units
1,610
Building type
Elevator building
Zoning district
R5
Lot area
1,410,820 sq ft
Floor area
1,526,800 sq ft

En español: 8 violaciones de Clase C abiertas (peligro inmediato) y 17 abiertas en total. La más antigua del HPD lleva 21 años abierta, desde el 5 de febrero de 2005.

Open now, most hazardous first

  1. 8

    Class C, immediately hazardous. Most often Fire Safety.

    Oldest open since

    Get these certified
  2. 4

    Class B, hazardous. Most often Fire Safety.

    See the 4
  3. 5

    OATH/ECB summonses still active

    See the 5

Certifications are being filed faster than new violations come in. 41 certifications filed against 8 new Class C in the last 180 days.

Since October 12, 2023, certifications were filed on 25 Class C violations: 24 by the original certify-by date, 1 after it. How certification works

The original certify-by dates on the 12 open HPD violations run from August 15, 2026 to November 26, 2026. The report prints the date beside each one.

Is this your building?

8 open Class C, 2 OATH hearings starting October 28, 2026, and a facade rated Unsafe. The oldest open HPD violation was filed February 5, 2005.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

OATH hearings
2 hearings scheduled on DOB summonses, the first on October 28, 2026.
OATH/ECB summonses
78 DOB and FDNY summonses here since January 1, 2019, with $151,905 in penalties imposed. 5 of them are still active, the same 5 listed under OATH/ECB. 21 judgments docketed, the latest on August 31, 2026. A docketed judgment shows up in a title search.
  • July 21, 2026, DOB: Failure to maintain elevator or conveying system. In violation.
  • July 21, 2026, DOB: Failure to maintain elevator or conveying system. In violation.
  • July 14, 2026, DOB: Failure to maintain elevator or conveying system. In violation.

The newest 3 of 78 summonses OATH lists here. The report lists all 78, with each outcome, the penalty imposed and any docketing date. What the report adds

DOB violations
20 active DOB violations. The newest was issued November 14, 2025.
Housing court
1 open housing court case, opened August 12, 2026. 2 housing court cases here since 2025, most of them tenant actions.
DOB complaints
67 DOB complaints, 2 of them conversion complaints, in the 12 months to September 25, 2026. The newest was filed September 23, 2026.
DOB facade
4 buildings on this lot are rated Unsafe in their latest facade reports, the newest filed February 18, 2022 (inspection cycle 9). 2 other buildings on this lot are rated SWARMP, and 17 are rated Safe. SWARMP means safe with a repair and maintenance program. Need this filed?
DOB permits
51 DOB work permits in effect. The latest, for Suspended Scaffold work, was issued October 1, 2026.
  • Suspended Scaffold, issued October 1, 2026, in effect until January 19, 2027.
  • Suspended Scaffold, issued October 1, 2026, in effect until January 19, 2027.
  • Suspended Scaffold, issued October 1, 2026, in effect until January 19, 2027.

The newest 3 of 238 permits DOB NOW lists here. The report lists all 238, with job numbers and each job's estimated cost. What the report adds

Energy benchmarking
ENERGY STAR score 11 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered as a city-owned or NYCHA building (DOB's list, March 1, 2026).
Bedbug report
Filed for its 19 buildings by May 22, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Tax exemption
Has an NYC Housing Authority tax exemption (DOF 2026/27 roll).

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C8 open most often Fire Safety
Fire SafetyNotice sent19288855BAY VIEW PACT LLC
Fire SafetyNotice sent19288844BAY VIEW PACT LLC
Fire SafetyNotice sent19288804BAY VIEW PACT LLC
Vermin / InfestationNotice sent to tenant19263105BAY VIEW PACT LLC
Fire SafetyNot complied with19106628BAY VIEW PACT LLC
Fire SafetyNot complied with19106624BAY VIEW PACT LLC
Fire SafetyTo be reinspected19104894BAY VIEW PACT LLC
Vermin / InfestationNot complied with19067695
Class B4 open most often Fire Safety
Fire SafetyNotice sent19288834BAY VIEW PACT LLC
Certified on time19263106BAY VIEW PACT LLC
Fire SafetyCertified on time19263104BAY VIEW PACT LLC
Fire SafetyCertified on time19263103BAY VIEW PACT LLC
OATH/ECB5 open
Elevators, Class 2Hearing pending39195956KBAY VIEW PACT LLC
Elevators, Class 1Found in violation39195883Z
Construction, Class 2Hearing pending39195874R
Boilers, Class 3In violation (POP)39188688H
Construction, Class 2Decided by default39553688K

The full report on 1590 East 102nd St, Brooklyn

Get the report on 1590 East 102nd St, Brooklyn, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 1590 East 102 Street, Brooklyn have open violations?

Yes. 1590 East 102 Street, Brooklyn had 17 open violations on October 10, 2026: 12 from HPD and 5 from OATH/ECB. 8 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 21 years, since February 5, 2005.

Is 1590 East 102 Street, Brooklyn getting better or worse?

Certifications are being filed faster than new violations come in. 41 certifications filed against 8 new Class C in the last 180 days. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 1590 East 102 Street, Brooklyn?

Since October 12, 2023, certifications were filed on 25 Class C violations: 24 by the original certify-by date, 1 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 1590 East 102 Street, Brooklyn have an OATH hearing coming up?

Yes. 2 hearings scheduled on DOB summonses, the first on October 28, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 1590 East 102 Street, Brooklyn have active DOB violations?

Yes. 20 active DOB violations. The newest was issued November 14, 2025. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Is 1590 East 102 Street, Brooklyn in housing court?

Yes. 1 open housing court case, opened August 12, 2026. 2 housing court cases here since 2025, most of them tenant actions. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 1590 East 102 Street, Brooklyn?

Yes. 67 DOB complaints, 2 of them conversion complaints, in the 12 months to September 25, 2026. The newest was filed September 23, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

What did the latest facade reports find at 1590 East 102 Street, Brooklyn?

4 buildings on this lot are rated Unsafe in their latest facade reports, the newest filed February 18, 2022 (inspection cycle 9). 2 other buildings on this lot are rated SWARMP, and 17 are rated Safe. SWARMP means safe with a repair and maintenance program. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Are any DOB work permits in effect at 1590 East 102 Street, Brooklyn?

Yes. 51 DOB work permits in effect. The latest, for Suspended Scaffold work, was issued October 1, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

What is the ENERGY STAR score for 1590 East 102 Street, Brooklyn?

ENERGY STAR score 11 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

When did 1590 East 102 Street, Brooklyn last file its bedbug report?

Its 19 buildings had all filed by May 22, 2026, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 1590 East 102 Street, Brooklyn covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered as a city-owned or NYCHA building (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Does 1590 East 102 Street, Brooklyn have a property tax exemption?

The building has an NYC Housing Authority tax exemption on DOF's 2026/27 roll. An exemption lowers a property's tax bill by reducing its assessed value.

When was 1590 East 102 Street, Brooklyn built?

The city's record gives 1950 as the year 1590 East 102 Street, Brooklyn was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator building with 8 floors.

How many apartments does 1590 East 102 Street, Brooklyn have?

The Department of City Planning's PLUTO tax-lot file lists 1,610 residential units at 1590 East 102 Street, Brooklyn. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, DOF's exemption rolls, DOB facade filings, DOB NOW work permits, Local Law 84 energy reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, DOF's exemption rolls, DOB facade filings, DOB NOW work permits, Local Law 84 energy reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 1590 East 102nd St, Brooklyn: 1,610 units, 8 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/1590-east-102-street-brooklyn

How we count: /method.

Is this your building?