1641 Amsterdam Ave, Manhattan
- Built 1901
- 7 floors
- 132 residential units
- Elevator apartment building
En español: 10 violaciones de Clase C abiertas (peligro inmediato) y 30 abiertas en total.
Certifications are being filed faster than new violations come in. 29 certifications filed against 10 new Class C in the last 180 days.
Since September 28, 2023, certifications were filed on 28 Class C violations: 27 by the original certify-by date, 1 after it. How certification works
- OATH hearings
- 3 hearings scheduled on DOB summonses, the first on October 22, 2026.
- DOB violations
- 38 active DOB violations, most of them for not benchmarking energy use. The newest was issued April 30, 2026.
- DOB complaints
- 12 DOB complaints in the last 12 months. The newest was filed September 22, 2026.
- DOB facade
- No Report Filed for inspection cycle 9. Need this filed?
- DOB permits
- 3 DOB work permits in effect. The latest, for General Construction work, was issued June 15, 2026.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 10 open most often Heat / Hot Water | |||
| Heat / Hot Water | Certified on time | 19228179 | ||
| Heat / Hot Water | CIV14 mailed | 19221095 | ||
| Heat / Hot Water | Certified on time | 19221103 | ||
| Heat / Hot Water | Certified on time | 19221102 | ||
| Heat / Hot Water | CIV14 mailed | 19207354 | ||
| Heat / Hot Water | Certified on time | 19206807 | ||
| Heat / Hot Water | Certified late | 19187976 | WASHINGTON HEIGHTS-WEST HARLEM HDFC | |
| Heat / Hot Water | Notice sent | 19171686 | WASHINGTON HEIGHTS-WEST HARLEM HDFC | |
| Heat / Hot Water | Certified on time | 19153200 | WASHINGTON HEIGHTS-WEST HARLEM HDFC | |
| Heat / Hot Water | Certified on time | 19125943 | WASHINGTON HEIGHTS-WEST HARLEM HDFC | |
| Class B | 9 open | |||
| Notice sent | 19179202 | WASHINGTON HEIGHTS-WEST HARLEM HDFC | ||
| No access to reinspect (first try) | 18755366 | WASHINGTON HEIGHTS-WEST HARLEM HDFC | ||
| Notice sent | 17051715 | |||
| Not complied with | 17062026 | |||
| Notice sent | 17010448 | |||
| Notice sent | 17010444 | |||
| Notice sent | 17010434 | |||
| Notice sent | 17010433 | |||
| Notice sent | 17010429 | |||
| OATH/ECB | 11 open most often Construction | |||
| Construction, Class 2 | Hearing pending | 39558991X | ||
| Construction, Class 2 | Hearing pending | 39200686N | WASHINGTON HEIGHTS-WEST HARLEM HDFC | |
| Construction, Class 2 | Hearing pending | 39200685L | WASHINGTON HEIGHTS-WEST HARLEM HDFC | |
| Elevators, Class 1 | Decided by default | 39194798J | WASHINGTON HEIGHTS-WEST HARLEM HDFC | |
| Construction, Class 2 | Decided by default | 35729683M | WASHINGTON HEIGHTS-WEST HARLEM HDFC | |
| Construction, Class 1 | Decided by default | 35729682K | WASHINGTON HEIGHTS-WEST HARLEM HDFC | |
| Construction, Class 2 | Decided by default | 39554020P | WASHINGTON HEIGHTS-WEST HARLEM HDFC | |
| Construction, Class 2 | Decided by default | 39554019H | WASHINGTON HEIGHTS-WEST HARLEM HDFC | |
| Construction, Class 2 | Decided by default | 39552475M | WASHINGTON HEIGHTS-WEST HARLEM HDFC | |
| Construction, Class 2 | Decided by default | 39552474K | WASHINGTON HEIGHTS-WEST HARLEM HDFC | |
| Construction, Class 2 | Admitted | 39546313Z | WASHINGTON HEIGHTS-WEST HARLEM HDFC | |