Skip to content
ViolationScout11 certifications filed against 3 new Class C in the last 180 days.Your building
Buildings1900 Quentin Road, BrooklynCurrent through

1900 Quentin Rd

Madison, Brooklyn, NY 11229

1900 Quentin Road is an elevator building with 124 apartments, built in 1939. It has 26 open violations, 12 of them Class C, immediately hazardous. The oldest open HPD violation was filed on April 11, 2022.

En español: 12 violaciones de Clase C abiertas (peligro inmediato) y 26 abiertas en total. La más antigua del HPD lleva 4 años abierta, desde el 11 de abril de 2022.

Open now, most hazardous first

  1. 12

    Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.

    14 open counting every year, the oldest since

    Get these certified
  2. 13

    Class B, hazardous, filed in the last 3 years. Most often Mold.

    See the 13
  3. 1

    OATH/ECB summons still active

    See it

1.0 open Class C per 10 apartments. Across the city: 0.7.

Certifications are being filed at least twice as fast as new violations come in. 11 certifications filed against 3 new Class C in the last 180 days.

Since November 27, 2023, certifications were filed on 22 Class C violations: 21 by the original certify-by date, 1 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works

The original certify-by dates on the 25 open HPD violations run from May 11, 2024 to January 5, 2027.

Zoning district
R7A
Lot area
39,091 sq ft
Floor area
120,000 sq ft
Tax lot (BBL)
3-06802-0001

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C12 open most often Lead Paint
Certified on time193222521900 OWNER CORP
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective unkeyed fire retardant material at the ceiling at public hall, 1st story
Fire SafetyNotice sent193222511900 OWNER CORP
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges at entrance door at compactor closet, 6th story, section 'west'
Vermin / InfestationNotice sent to tenant192464861900 OWNER CORP
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Notice sent18687206
§ 27-2005 ADM CODE & 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape. In the 4th room from north
Notice sent18687205
§ 27-2043.1 HMC Install the missing or repair/replace the defective window guard(S) in accordance with the specifications of the new york city health code section 24 RCNY chapter 12. Wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment
Vermin / InfestationNotice sent to tenant18687204
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Lead PaintDefect letter sent18215734
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) 1st door from south at west wall, 1st door frame from south at west wall, north wall in the 1st room from east at north
Lead PaintNotice sent17346336
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six
Lead PaintDefect letter sent17346112
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from east at south wall in the foyer
Lead PaintDefect letter sent17134337
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st door from north at east wall in the bathroom
Lead PaintNotice sent16870579
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six
Lead PaintDefect letter sent16870456
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from east at south wall in the foyer
In HPD's words. Apartment numbers are left out.
Class B13 open most often Mold
Notice sent192464891900 OWNER CORP
Fire SafetyNotice sent192464881900 OWNER CORP
Fire SafetyNotice sent192464871900 OWNER CORP
Notice sent192464851900 OWNER CORP
Notice sent192464831900 OWNER CORP
Notice sent192464801900 OWNER CORP
Notice sent192464791900 OWNER CORP
Certified on time19165858
Certified on time19165857
MoldNotice sent to tenant19403626
MoldNotice sent to tenant19123230
MoldNotice sent to tenant19123229
MoldNo access to reinspect (first try)18237061
OATH/ECB1 open
Construction, Class 1Hearing pending35726991K
Is this your building?Also for tenants and buyers
Is this your building?

An OATH hearing on December 15, 2026.

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

Open Class C, week by week
11 on September 24, 2026 and 12 on November 15.
HPD, by year
From 2017 to 2026, HPD filed 250 violations and closed 227, all classes.
YearFiledClosed
20267280
20255050
20243511
20232013
20221612
202111
202002
20193644
201897
2017117
Energy benchmarking
ENERGY STAR score 74 for 2025, against a median of 69 for Multifamily Housing that year.
Local Law 97
Covered from 2026 as a rent-regulated building (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
Bedbug report
Filed December 5, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
Rent stabilization
Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
HPD emergency repair order
1 completed HPD emergency repair order since November 27, 2023: a general construction order, opened September 2, 2026, awarded for $487. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.

Hearings and penalties

OATH hearings
A hearing on a DOB summons is set for December 15, 2026.
OATH/ECB summonses
5 DOB summonses here since January 1, 2019, with $20,625 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB.
  • March 10, 2026, DOB: Fail to take required measures to secure public safety-unsafe facade. Adjourned, $10,000 penalty imposed.
  • April 5, 2025, DOB: Fail to take required measures to secure public safety-unsafe facade. In violation, $10,000 penalty imposed.
  • April 5, 2025, DOB: Failure to safeguard - parking structure. Dismissed.

The newest 3 of 5 summonses OATH lists here.

Housing court
2 housing court cases here since 2014. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.

DOB records

DOB violations
4 active DOB violations. The newest was issued February 22, 2024.
DOB complaints
1 DOB complaint in the last 12 months. It was filed January 13, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
DOB, all years
23 DOB complaints from 1992 through November 25, 2026. 34 DOB violations since 1999, 22 resolved and 8 dismissed in DOB's records.
DOB facade
Rated Unsafe in the latest facade report, filed February 21, 2025 (inspection cycle 10). Reports in earlier inspection cycles rated it Safe in 2008, Safe with a repair and maintenance program (SWARMP) in 2014, and Safe in 2019.
DOB permits
3 DOB work permits in effect. The latest, for Sidewalk Shed work, was issued September 15, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
  • Sidewalk Shed, issued September 15, 2026, in effect until December 14, 2026.
  • Suspended Scaffold, issued May 12, 2026, in effect until March 13, 2027.
  • General Construction, issued April 14, 2026, in effect until April 14, 2027.

The newest 3 of 4 permits DOB NOW lists here.

Boiler inspection
Inspected June 4, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is lead paint.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 1900 Quentin Rd have open violations?

Yes. It had 26 open violations on November 25, 2026: 25 from HPD and 1 from OATH/ECB. 12 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 4 years, since April 11, 2022.

Is this building getting better or worse?

Certifications are being filed at least twice as fast as new violations come in. 11 certifications filed against 3 new Class C in the last 180 days. The 180 days run to November 25, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, HPD's building registrations, OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 1900 Quentin Rd, Brooklyn: 124 units, 12 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 25, 2026. https://violationscout.com/building/1900-quentin-road-brooklyn

How we count: /method.

Is this your building?