1526 Sedgwick Ave, Bronx
- Built
- 2021
- Floors
- 8
- Residential units
- 39
- Building type
- Elevator building
- Zoning district
- R7-1
- Lot area
- 7,000 sq ft
- Floor area
- 30,273 sq ft
- Last sale
- $1,100,000
En español: 4 violaciones de Clase C abiertas (peligro inmediato) y 7 abiertas en total. La más antigua del HPD lleva 14 meses abierta, desde el 3 de agosto de 2025.
Open now, most hazardous first
- 4Get these certified
Class C, immediately hazardous. Most often Vermin / Infestation.
- 3See the 3
Class B, hazardous
Certifications are being filed faster than new violations come in. 22 certifications filed against 4 new Class C in the last 180 days.
Since October 12, 2023, certifications were filed on 12 Class C violations, all 12 by the original certify-by date. How certification works
The original certify-by dates on the 7 open HPD violations run from September 24, 2025 to October 23, 2026. The report prints the date beside each one.
- OATH/ECB summonses
- 22 DOB and FDNY summonses here since January 1, 2019, with $14,970 in penalties imposed. 15 judgments docketed, the latest on September 30, 2026. A docketed judgment shows up in a title search.
- February 28, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. In violation.
- January 11, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. In violation, $935 penalty imposed.
- January 8, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. In violation, $935 penalty imposed.
The newest 3 of 22 summonses OATH lists here. The report lists all 22, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 1 active DOB violation, issued May 2, 2024.
- DOB permits
- DOB NOW lists 7 work permits here, the newest issued January 19, 2022, for Construction Fence work.
- Construction Fence, issued January 19, 2022, signed off.
- Sprinklers, issued October 5, 2021, signed off.
- Sidewalk Shed, issued September 21, 2021, signed off.
The newest 3 of 7 permits DOB NOW lists here. The report lists all 7, with job numbers and each job's estimated cost. What the report adds
- Certificate of occupancy
- Final, issued March 13, 2023.
- Energy benchmarking
- ENERGY STAR score 84 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Bedbug report
- Filed December 15, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- Tax exemption
- Has a 421-a tax exemption (DOF 2026/27 roll). DOF lists its start year as 2023.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 4 open most often Vermin / Infestation | |||
| Vermin / Infestation | CIV14 mailed | 19185644 | ||
| CIV14 mailed | 19185642 | |||
| Vermin / Infestation | To be reinspected | 19073780 | 1526 SEDGWICK GEVALDIG LLC | |
| Vermin / Infestation | To be reinspected | 19073775 | 1526 SEDGWICK GEVALDIG LLC | |
| Class B | 3 open | |||
| Notice sent | 19185643 | |||
| Not complied with | 18132609 | |||
| Not complied with | 18132608 | |||
The full report on 1526 Sedgwick Ave, Bronx
- All 7 open violations, each with the city's own words and the date on its notice.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 3,231 Bronx buildings with 20 to 49 apartments.
- All 7 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 22 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.
Get the report on 1526 Sedgwick Ave, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.