3053 Villa Ave, Bronx
- Built
- 2018
- Floors
- 8
- Residential units
- 43
- Building type
- Elevator building
- Zoning district
- R8
- Lot area
- 5,000 sq ft
- Floor area
- 31,396 sq ft
En español: 2 violaciones de Clase C abiertas (peligro inmediato) y 4 abiertas en total. La más antigua del HPD lleva 5 años abierta, desde el 1 de septiembre de 2021.
Open now, most hazardous first
- 2Get these certified
Class C, immediately hazardous
- 1See it
Class B, hazardous
- 1See it
OATH/ECB summons still active
Open violations are sitting, with little movement either way. 2 open Class C, with nothing filed or new in the last 180 days.
Since October 12, 2023, certifications were filed on 12 Class C violations, all 12 after the original certify-by date. How certification works
The original certify-by dates on the 3 open HPD violations have all passed. The latest was March 11, 2026. The report prints the date beside each one.
- OATH/ECB summonses
- 33 DOB and FDNY summonses here since January 1, 2019, with $51,075 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 16 judgments docketed, the latest on August 31, 2026. A docketed judgment shows up in a title search.
- August 6, 2025, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. In violation.
- April 8, 2025, DOB: Failure to submit required report of critical examination. In violation, $2,500 penalty imposed.
- February 11, 2025, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. Dismissed.
The newest 3 of 33 summonses OATH lists here. The report lists all 33, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 3 active DOB violations. The newest was issued December 1, 2023.
- Housing court
- 1 housing court case here, opened in 2005.
- DOB complaints
- 1 DOB complaint in the 12 months to September 25, 2026. It was filed February 13, 2026.
- DOB facade
- No Report Filed for inspection cycle 9. Need this filed?
- DOB permits
- DOB NOW lists 3 work permits here, the newest issued March 29, 2022, for Mechanical Systems work.
- Mechanical Systems, issued March 29, 2022, expired March 29, 2023.
- Sidewalk Shed, issued October 11, 2019, signed off.
- Supported Scaffold, issued October 8, 2019, signed off.
- Certificate of occupancy
- Final, issued June 9, 2021.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Bedbug report
- Filed December 15, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- Tax exemption
- Has a 421-a tax exemption (DOF 2026/27 roll). DOF lists its start year as 2020.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 2 open | ||
| Vermin / Infestation | Notice sent to tenant | 17185119 | |
| No access to reinspect (second try) | 16960810 | ||
| Class B | 1 open | ||
| Notice sent | 17185120 | ||
| OATH/ECB | 1 open | ||
| Local Law, Class 2 | Found in violation | 37035118X | |
The full report on 3053 Villa Ave, Bronx
- All 4 open violations, each with the city's own words and the date on its notice.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 3,231 Bronx buildings with 20 to 49 apartments.
- All 3 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 33 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 3053 Villa Ave, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.