2539 Radcliff Ave
Bronx, NY 10469
2539 Radcliff Avenue is a two-family house, built in 1935. It has 22 open violations, 9 of them Class C, immediately hazardous. The oldest open HPD violation was filed on November 1, 2022.
En español: 9 violaciones de Clase C abiertas (peligro inmediato) y 22 abiertas en total. La más antigua del HPD lleva 4 años abierta, desde el 1 de noviembre de 2022.
Open now, most hazardous first
- 9Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.
- 13See the 13
Class B, hazardous, filed in the last 3 years
Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.
Since November 27, 2023, certifications were filed on 5 Class C violations: 4 by the original certify-by date, 1 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 22 open HPD violations have all passed. The latest was July 20, 2026.
- Zoning district
- R5
- Lot area
- 2,500 sq ft
- Floor area
- 1,880 sq ft
- Last sale
- $499,000
- Tax lot (BBL)
- 2-04445-0058
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 9 open most often Lead Paint | ||
| Lead Paint | Notice sent | 18603644 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from north at east wall in the 4th room from east | |||
| Lead Paint | Notice sent | 18603642 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st door from east at south wall in the kitchen | |||
| Heat / Hot Water | Notice sent | 18586250 | |
| § 27-2029 admin. Code: Provide an adequate supply of heat for the apartment in the entire apartment | |||
| Lead Paint | Notice sent | 18563438 | |
| § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six | |||
| Lead Paint | Notice sent | 18557689 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door from north at east wall in the kitchen | |||
| Lead Paint | Defect letter sent | 17864655 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from north at east wall in the 3rd room from east at south | |||
| Lead Paint | Defect letter sent | 17816325 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from south at west wall in the 1st room from east | |||
| Lead Paint | Notice sent | 17768489 | |
| § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six | |||
| Lead Paint | Notice sent | 17767924 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door from east at south wall, 1st door frame from east at south wall in the kitchen | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 13 open | ||
| Notice sent | 18967147 | ||
| Vermin / Infestation | Notice sent | 18967146 | |
| Notice sent | 18668820 | ||
| Notice sent | 18668819 | ||
| Notice sent | 18668817 | ||
| Notice sent | 18595727 | ||
| Notice sent | 18595726 | ||
| Notice sent | 18595724 | ||
| Notice sent | 18507080 | ||
| Notice sent | 18485579 | ||
| Notice sent | 17485027 | ||
| Notice sent | 17485026 | ||
| Notice sent | 16778191 | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2022 to 2026, HPD filed 79 violations and closed 27, all classes.
Year Filed Closed 2026 20 5 2025 19 6 2024 15 13 2023 4 2 2022 21 1 - HPD emergency repair order
- 1 completed HPD emergency repair order since November 27, 2023: a lead paint order, opened March 11, 2026, awarded for $3,800. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH/ECB summonses
- 4 DOB summonses here since January 1, 2019, with $4,450 in penalties imposed. 3 judgments docketed, the latest on January 31, 2024. A docketed judgment shows up in a title search.
- November 16, 2022, DOB: Failure to maintain building in code-compliant manner. Dismissed.
- November 15, 2022, DOB: Electrical work without a permit. In violation, $1,600 penalty imposed.
- November 15, 2022, DOB: Fail maintain building compliant manner: No fire stopping. In violation, $1,250 penalty imposed.
The newest 3 of 4 summonses OATH lists here.
DOB records
- DOB, all years
- 4 DOB complaints from 2022 through November 25, 2026.
The building report
- The city's wording on the 13 other open violations this page lists without it.
- What each of the 2 city statuses here means, and how many of these carry it.
- How it compares with the 66,352 Bronx buildings with 1 to 5 apartments.
- All 4 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.