22-29 Dix Ave
Queens, NY 11691
22-29 Dix Avenue is an elevator building with 27 apartments, built in 1998. It has 14 open violations, 8 of them Class C, immediately hazardous. The oldest open HPD violation was filed on April 15, 2013.
En español: 8 violaciones de Clase C abiertas (peligro inmediato) y 14 abiertas en total. La más antigua del HPD lleva 13 años abierta, desde el 15 de abril de 2013.
Open now, most hazardous first
- 8Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Fire Safety.
- 5See the 5
Class B, hazardous, filed in the last 3 years
- 1See it
OATH/ECB summons still active
3.0 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. 1 certification filed and 0 new Class C in the last 180 days, too few to call a direction.
Since November 16, 2023, certifications were filed on 55 Class C violations, all 55 by the original certify-by date. HPD now marks 1 of them Invalid Certification. How certification works
The original certify-by dates on the 13 open HPD violations have all passed. The latest was April 20, 2026.
- Zoning district
- R5
- Lot area
- 17,081 sq ft
- Floor area
- 21,070 sq ft
- Last transfer
- No price recorded
- Tax lot (BBL)
- 4-15661-0055
- Neighborhood
- Far Rockaway-Bayswater
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 8 open most often Fire Safety | ||
| Fire Safety | Notice sent | 18677385 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective lock and latch set at vestibule at public hall, 1st story | |||
| Fire Safety | Notice sent | 18665109 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective latch set at vestibule door leading to public hall , 1st story | |||
| Fire Safety | Notice sent | 18642282 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective at vestibule entrance door at public hall | |||
| Fire Safety | Invalid certification | 18583798 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective vestibule door latch at public hall, 1st story | |||
| Vermin / Infestation | Not complied with | 18104665 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | |||
| Vermin / Infestation | No access to reinspect (first try) | 18085984 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| Not complied with | 17642913 | ||
| § 27-2005 HMC: Properly repair or replace the broken or defective lock and handle assembly at vestibule door at public hall, 1st story | |||
| Vermin / Infestation | Not complied with | 17412441 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 5 open | ||
| Notice sent | 18677386 | ||
| Notice sent | 18642283 | ||
| Notice sent | 18642281 | ||
| Notice sent | 18597812 | ||
| Mold | No access to reinspect (first try) | 17285003 | |
| OATH/ECB | 1 open | ||
| Elevators, Class 1 | Found in violation | 39122189L | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 9 on September 24, 2026 and 8 on November 8.
- HPD, by year
- From 2017 to 2026, HPD filed 877 violations and closed 880, all classes.
Year Filed Closed 2026 38 231 2025 44 25 2024 131 126 2023 116 102 2022 138 40 2021 81 61 2020 75 48 2019 97 89 2018 39 54 2017 118 104 - Bedbug report
- Filed December 18, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
Hearings and penalties
- OATH/ECB summonses
- 9 DOB and FDNY summonses here since January 1, 2019, with $4,512 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 3 judgments docketed, the latest on April 30, 2025. A docketed judgment shows up in a title search.
- September 30, 2024, FDNY: Fire protection systems. In violation, $475 penalty imposed.
- September 26, 2024, DOB: Failure to maintain elevator or conveying system. In violation, $312 penalty imposed.
- August 16, 2024, DOB: Failure to maintain elevator or conveying system. In violation, $3,125 penalty imposed.
The newest 3 of 9 summonses OATH lists here.
- Housing court
- 1 open housing court case. 26 housing court cases here since 2005. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 12 active DOB violations. The newest was issued October 16, 2024.
- DOB, all years
- 39 DOB complaints from 1999 through November 14, 2026. 32 DOB violations since 2000, 14 resolved and 6 dismissed in DOB's records.
- DOB permits
- 1 DOB work permit in effect, for General Construction work, issued August 18, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- General Construction, issued August 18, 2026, in effect until January 26, 2027.
- Sidewalk Shed, issued June 11, 2025, signed off.
- Supported Scaffold, issued June 11, 2025, signed off.
- Boiler inspection
- 2 boilers, both inspected in 2026, the latest on March 10. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 6 other open violations this page lists without it.
- What each of the 5 city statuses here means, and how many of these carry it.
- How it compares with the 1,760 Queens buildings with 20 to 49 apartments.
- All 3 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 9 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.