Skip to content
ViolationScout28 certifications filed against 14 new Class C in the last 180 days.Is this your building?
Buildings22 Mt Morris Park West, ManhattanCurrent through

22 Mt Morris Park West, Manhattan

BBL 1-01721-0014

En español: 19 violaciones de Clase C abiertas (peligro inmediato) y 41 abiertas en total.

Certifications are being filed faster than new violations come in. 28 certifications filed against 14 new Class C in the last 180 days.

Since September 28, 2023, certifications were filed on 38 Class C violations: 36 by the original certify-by date, 2 after it. How certification works

Is this your building?

19 open Class C.

We read every request ourselves. When a compliance firm we work with can take the building, we introduce you to that one firm. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: which violations matter, and how long this kind usually takes to clear. It is not on sale yet.

See what the report covers

HPD takes complaints from tenants through 311.

OATH hearings
A hearing on a DOB summons is set for October 8, 2026.
DOB violations
36 active DOB violations, most of them for low-pressure boilers. The newest was issued November 14, 2025.
DOB complaints
5 DOB complaints in the last 12 months. The newest was filed July 29, 2026.
DOB facade
Rated SWARMP in the latest facade report, filed June 3, 2024 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Need this filed?
DOB permits
1 DOB work permit in effect, for Sidewalk Shed work, issued December 1, 2025.
Energy benchmarking
ENERGY STAR score 100 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Rent stabilization
Has rent-stabilized apartments (2024 registration).

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C19 open most often Vermin / Infestation
Vermin / InfestationNotice sent to tenant19213679
Notice sent19213642
Vermin / InfestationNotice sent to tenant19213604
Vermin / InfestationNotice sent to tenant19213596
Lead PaintNotice sent1919533622 PARK VIEW LLC
Lead PaintNotice sent1919533522 PARK VIEW LLC
Lead PaintNotice sent1919533422 PARK VIEW LLC
Lead PaintNotice sent1919533322 PARK VIEW LLC
Fire SafetyNotice sent1916926422 PARK VIEW LLC
Vermin / InfestationNotice sent to tenant1916926022 PARK VIEW LLC
Vermin / InfestationDefect letter sent1895446922 PARK VIEW LLC
Vermin / InfestationNot complied with1878816122 PARK VIEW LLC
Vermin / InfestationDefect letter sent1878816022 PARK VIEW LLC
Vermin / InfestationNot complied with1877947422 PARK VIEW LLC
MoldNotice sent to tenant19220450
Vermin / InfestationDefect letter sent17484642
Vermin / InfestationDefect letter sent17402168
MoldDefect letter sent18792345
Vermin / InfestationDefect letter sent16342924
Class B19 open most often Fire Safety
Notice sent19213664
Notice sent19213660
Notice sent19213650
Notice sent19213640
Notice sent19213636
Notice sent19213632
Notice sent19213630
Notice sent1916926522 PARK VIEW LLC
Fire SafetyNotice sent1916926322 PARK VIEW LLC
Fire SafetyNotice sent1916926222 PARK VIEW LLC
Notice sent1916925622 PARK VIEW LLC
Not complied with1880705122 PARK VIEW LLC
Not complied with1880704522 PARK VIEW LLC
Not complied with1880704422 PARK VIEW LLC
Not complied with1880703922 PARK VIEW LLC
Structural HazardNot complied with18136393
Not complied with18136391
Not complied with18136389
Not complied with18136384
OATH/ECB3 open most often Construction
Construction, Class 2Hearing pending39557242Y22 PARK VIEW LLC
Construction, Class 1Decided by default35727074H22 PARK VIEW LLC
Elevators, Class 2Decided by default39116165X

The most common category among the open records here is vermin and pests.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 22 Mt Morris Park West, Manhattan have open violations?

Yes. 22 Mt Morris Park West, Manhattan had 41 open violations on September 26, 2026: 38 from HPD and 3 from OATH/ECB. 19 are Class C, the class HPD treats as immediately hazardous.

Is 22 Mt Morris Park West, Manhattan getting better or worse?

Certifications are being filed faster than new violations come in. 28 certifications filed against 14 new Class C in the last 180 days. That window ends September 26, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 22 Mt Morris Park West, Manhattan?

Since September 28, 2023, certifications were filed on 38 Class C violations: 36 by the original certify-by date, 2 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 22 Mt Morris Park West, Manhattan have an OATH hearing coming up?

Yes. A hearing on a DOB summons is set for October 8, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 22 Mt Morris Park West, Manhattan have active DOB violations?

Yes. 36 active DOB violations, most of them for low-pressure boilers. The newest was issued November 14, 2025. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has DOB received complaints about 22 Mt Morris Park West, Manhattan?

Yes. 5 DOB complaints in the last 12 months. The newest was filed July 29, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

What did the latest facade report find at 22 Mt Morris Park West, Manhattan?

Rated SWARMP in the latest facade report, filed June 3, 2024 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Are any DOB work permits in effect at 22 Mt Morris Park West, Manhattan?

Yes. 1 DOB work permit in effect, for Sidewalk Shed work, issued December 1, 2025. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

What is the ENERGY STAR score for 22 Mt Morris Park West, Manhattan?

ENERGY STAR score 100 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

Is 22 Mt Morris Park West, Manhattan covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 22 Mt Morris Park West, Manhattan rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 22 Mt Morris Park West, Manhattan built?

The city's record gives 1900 as the year 22 Mt Morris Park West, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 7 floors.

How many apartments does 22 Mt Morris Park West, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 21 residential units at 22 Mt Morris Park West, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH hearing dates, DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, Local Law 84 energy reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 26, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH hearing dates, DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, Local Law 84 energy reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 22 Mt Morris Park…, Manhattan: violations, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 26, 2026. https://violationscout.com/building/22-mt-morris-park-west-manhattan

How we count: /method.

Is this your building?