Skip to content
ViolationScout55 certifications filed against 9 new Class C in the last 180 days.Is this your building?
Buildings231 Echo Place, BronxCurrent through

231 Echo Pl, Bronx

BBL 2-02810-0045

En español: 16 violaciones de Clase C abiertas (peligro inmediato) y 30 abiertas en total.

Certifications are being filed faster than new violations come in. 55 certifications filed against 9 new Class C in the last 180 days.

Since September 28, 2023, certifications were filed on 89 Class C violations: 74 by the original certify-by date, 15 after it. How certification works

Is this your building?

16 open Class C.

We read every request ourselves. When a compliance firm we work with can take the building, we introduce you to that one firm. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: which violations matter, and how long this kind usually takes to clear. It is not on sale yet.

See what the report covers

HPD takes complaints from tenants through 311.

OATH hearings
A hearing on a DOB summons is set for October 2, 2026.
DOB violations
1 active DOB violation, issued April 8, 2025.
Housing court
1 open housing court case, opened June 16, 2026.
DOB complaints
2 DOB complaints in the last 12 months. The newest was filed August 17, 2026.
DOB permits
3 DOB work permits in effect. The latest, for Sidewalk Shed work, was issued July 21, 2026.
Energy benchmarking
ENERGY STAR score 47 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair orders
2 completed HPD emergency repair orders since September 28, 2023, awarded for $671 in total. The most recent of the 2, a general construction order, was opened August 27, 2024.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C16 open most often Lead Paint
Not complied with18995764231 LLC
Lead PaintTo be reinspected18821585231 LLC
Lead PaintNo access to reinspect (first try)18821560231 LLC
Lead PaintNo access to reinspect (first try)18821559231 LLC
Lead PaintNo access to reinspect (first try)18821558231 LLC
Lead PaintNo access to reinspect (first try)18821557231 LLC
Lead PaintNo access to reinspect (first try)18821556231 LLC
Lead PaintNo access to reinspect (first try)18821555231 LLC
Lead PaintNo access to reinspect (first try)18821554231 LLC
Notice sent18549032231 LLC
Vermin / InfestationNot complied with18188713
Notice sent17695914
Notice sent17480754
Not complied with17111536
Notice sent17017235
Fire SafetyNot complied with16985907
Class B12 open most often Mold
MoldNotice sent to tenant19152790231 LLC
MoldNotice sent to tenant19152789231 LLC
MoldNotice sent to tenant19152788231 LLC
MoldNotice sent to tenant19152787231 LLC
Not complied with18781819231 LLC
Not complied with18212726231 LLC
Not complied with18212723231 LLC
Not complied with18212722231 LLC
Notice sent17931933
Notice sent17510908
Notice sent17480747
Notice sent17111550
OATH/ECB2 open most often Construction
Construction, Class 1Hearing pending39179352J231 LLC
Construction, Class 1Found in violation39143911M

The most common category among the open records here is lead paint.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 231 Echo Place, Bronx have open violations?

Yes. 231 Echo Place, Bronx had 30 open violations on September 26, 2026: 28 from HPD and 2 from OATH/ECB. 16 are Class C, the class HPD treats as immediately hazardous.

Is 231 Echo Place, Bronx getting better or worse?

Certifications are being filed faster than new violations come in. 55 certifications filed against 9 new Class C in the last 180 days. That window ends September 26, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 231 Echo Place, Bronx?

Since September 28, 2023, certifications were filed on 89 Class C violations: 74 by the original certify-by date, 15 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 231 Echo Place, Bronx have an OATH hearing coming up?

Yes. A hearing on a DOB summons is set for October 2, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 231 Echo Place, Bronx have active DOB violations?

Yes. 1 active DOB violation, issued April 8, 2025. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Is 231 Echo Place, Bronx in housing court?

Yes. 1 open housing court case, opened June 16, 2026. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 231 Echo Place, Bronx?

Yes. 2 DOB complaints in the last 12 months. The newest was filed August 17, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 231 Echo Place, Bronx marked completed?

Yes. 2 completed HPD emergency repair orders since September 28, 2023, awarded for $671 in total. The most recent of the 2, a general construction order, was opened August 27, 2024. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

Are any DOB work permits in effect at 231 Echo Place, Bronx?

Yes. 3 DOB work permits in effect. The latest, for Sidewalk Shed work, was issued July 21, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

What is the ENERGY STAR score for 231 Echo Place, Bronx?

ENERGY STAR score 47 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

Is 231 Echo Place, Bronx covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 231 Echo Place, Bronx rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 231 Echo Place, Bronx built?

The city's record gives 1927 as the year 231 Echo Place, Bronx was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up apartment building with 5 floors.

How many apartments does 231 Echo Place, Bronx have?

The Department of City Planning's PLUTO tax-lot file lists 44 residential units at 231 Echo Place, Bronx. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH hearing dates, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 26, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH hearing dates, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 231 Echo Pl, Bronx: 16 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 26, 2026. https://violationscout.com/building/231-echo-place-bronx

How we count: /method.

Is this your building?