Skip to content
ViolationScout15 open Class C, with 0 certifications filed and 2 new Class C in the last 180 days, too few to call a direction.Is this your building?
Buildings240 Echo Place, BronxCurrent through

240 Echo Pl, Bronx

BBL 2-02809-0022

En español: 15 violaciones de Clase C abiertas (peligro inmediato) y 22 abiertas en total.

Open violations are sitting, with little movement either way. 15 open Class C, with 0 certifications filed and 2 new Class C in the last 180 days, too few to call a direction.

Since September 28, 2023, certifications were filed on 24 Class C violations: 5 by the original certify-by date, 19 after it. How certification works

Is this your building?

15 open Class C.

We read every request ourselves. When a compliance firm we work with can take the building, we introduce you to that one firm. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: which violations matter, and how long this kind usually takes to clear. It is not on sale yet.

See what the report covers

HPD takes complaints from tenants through 311.

DOB violations
3 active DOB violations. The newest was issued May 2, 2024.
Housing court
1 open housing court case, opened January 7, 2026.
DOB complaints
1 DOB complaint in the last 12 months. It was filed June 29, 2026.
DOB facade
Rated SWARMP in the latest facade report, filed January 17, 2023 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Need this filed?
Energy benchmarking
ENERGY STAR score 78 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C15 open most often Heat / Hot Water
Notice sent19006596240 ECHO PLACE HDFC
Notice sent19006593240 ECHO PLACE HDFC
Certified late18590513240 ECHO PLACE HDFC
Heat / Hot WaterCertified late18590512240 ECHO PLACE HDFC
Not complied with18528547240 ECHO PLACE HDFC
Certified late18472755240 ECHO PLACE HDFC
Heat / Hot WaterCertified late18472753240 ECHO PLACE HDFC
Certified late18472750240 ECHO PLACE HDFC
Heat / Hot WaterCertified late18472749240 ECHO PLACE HDFC
Certified late18469559240 ECHO PLACE HDFC
Heat / Hot WaterCertified late18469556240 ECHO PLACE HDFC
Certified late18469555240 ECHO PLACE HDFC
Certified late18444917240 ECHO PLACE HDFC
Certified late18444916240 ECHO PLACE HDFC
Heat / Hot WaterInvalid certification18441973240 ECHO PLACE HDFC
Class B7 open most often Fire Safety
Notice sent19006597240 ECHO PLACE HDFC
Notice sent19006595240 ECHO PLACE HDFC
Fire SafetyNotice sent19006590240 ECHO PLACE HDFC
Fire SafetyNotice sent19006589240 ECHO PLACE HDFC
Not complied with18528568240 ECHO PLACE HDFC
Not complied with18528563240 ECHO PLACE HDFC
Not complied with18528558240 ECHO PLACE HDFC

The most common category among the open records here is heat and hot water.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 240 Echo Place, Bronx have open violations?

Yes. 240 Echo Place, Bronx had 22 open violations on September 26, 2026: 22 from HPD. 15 are Class C, the class HPD treats as immediately hazardous.

Is 240 Echo Place, Bronx getting better or worse?

Open violations are sitting, with little movement either way. 15 open Class C, with 0 certifications filed and 2 new Class C in the last 180 days, too few to call a direction. That window ends September 26, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 240 Echo Place, Bronx?

Since September 28, 2023, certifications were filed on 24 Class C violations: 5 by the original certify-by date, 19 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 240 Echo Place, Bronx have active DOB violations?

Yes. 3 active DOB violations. The newest was issued May 2, 2024. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Is 240 Echo Place, Bronx in housing court?

Yes. 1 open housing court case, opened January 7, 2026. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 240 Echo Place, Bronx?

Yes. 1 DOB complaint in the last 12 months. It was filed June 29, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

What did the latest facade report find at 240 Echo Place, Bronx?

Rated SWARMP in the latest facade report, filed January 17, 2023 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

What is the ENERGY STAR score for 240 Echo Place, Bronx?

ENERGY STAR score 78 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

Is 240 Echo Place, Bronx covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

When was 240 Echo Place, Bronx built?

The city's record gives 1931 as the year 240 Echo Place, Bronx was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 6 floors.

How many apartments does 240 Echo Place, Bronx have?

The Department of City Planning's PLUTO tax-lot file lists 42 residential units at 240 Echo Place, Bronx. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOB violations, HPD's housing court cases, DOB complaints, DOB facade filings, Local Law 84 energy reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 26, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOB violations, HPD's housing court cases, DOB complaints, DOB facade filings, Local Law 84 energy reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 240 Echo Pl, Bronx: 15 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 26, 2026. https://violationscout.com/building/240-echo-place-bronx

How we count: /method.

Is this your building?