2608 Briggs Ave
Bronx, NY 10458
2608 Briggs Avenue is a walk-up building with 11 apartments, built in 1913. It has 28 open violations, 12 of them Class C, immediately hazardous. The oldest open HPD violation was filed on May 3, 1991.
En español: 12 violaciones de Clase C abiertas (peligro inmediato) y 28 abiertas en total. La más antigua del HPD lleva 35 años abierta, desde el 3 de mayo de 1991.
Open now, most hazardous first
- 12Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.
- 16See the 16
Class B, hazardous, filed in the last 3 years. Most often Fire Safety.
10.9 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.
The original certify-by dates on the 28 open HPD violations run from December 12, 2024 to December 23, 2026.
- Zoning district
- R7B
- Lot area
- 3,334 sq ft
- Floor area
- 13,599 sq ft
- Tax lot (BBL)
- 2-03293-0043
- Neighborhood
- University Heights-Fordham
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 12 open most often Lead Paint | |||
| Vermin / Infestation | Notice sent to tenant | 19349410 | BRIGGS RESIDENCE LLC | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Notice sent | 18101286 | |||
| § 27-2005 HMC: Properly repair or replace the broken or defective latch and assemblys at street to vestibule door , 1st story | ||||
| Heat / Hot Water | Notice sent | 17720122 | ||
| § 27-2033 ADM CODE Provide ready access to buildings heating system door locked at boiler room | ||||
| Vermin / Infestation | Notice sent to tenant | 17720121 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Notice sent | 17720116 | |||
| § 27-2005 HMC: Properly repair or replace the broken or defective vaule cap missing at south wall in the 1st room from north | ||||
| Heat / Hot Water | Notice sent | 17720107 | ||
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment | ||||
| Lead Paint | Postponement granted | 17722909 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from north at east wall, 1st window frame from east at south wall in the 5th room from east | ||||
| Lead Paint | Postponement granted | 17722908 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from west at north wall, 1st window frame from east at south wall in the 4th room from east | ||||
| Lead Paint | Postponement granted | 17722907 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from west at north wall, 1st window frame from south at west wall in the 2nd room from east | ||||
| Lead Paint | Postponement granted | 17722906 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) baseboard at north wall, 1st door frame from south at west wall, east wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east | ||||
| Lead Paint | Postponement granted | 17722905 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st window frame from south at west wall in the kitchen | ||||
| Lead Paint | Postponement granted | 17722904 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) ceiling, 1st door frame from north at east wall, south wall, east wall, west wall, 2nd window frame from south at west wall in the kitchen | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 16 open most often Fire Safety | |||
| Notice sent | 19349411 | BRIGGS RESIDENCE LLC | ||
| Notice sent | 17720125 | |||
| Notice sent | 17720123 | |||
| Fire Safety | Notice sent | 17720120 | ||
| Fire Safety | Notice sent | 17720119 | ||
| Mold | No access to reinspect (first try) | 17720117 | ||
| Notice sent | 17720115 | |||
| Notice sent | 17720114 | |||
| Notice sent | 17720113 | |||
| Notice sent | 17720112 | |||
| Notice sent | 17720111 | |||
| Notice sent | 17720110 | |||
| Notice sent | 17720108 | |||
| Notice sent | 17367591 | |||
| Notice sent | 17367590 | |||
| Notice sent | 17367589 | |||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 12 on September 24, 2026 and 12 on November 8.
- HPD, by year
- From 2017 to 2026, HPD filed 70 violations and closed 21, all classes.
Year Filed Closed 2026 4 1 2025 35 5 2024 6 6 2023 14 1 2022 2 2 2021 2 0 2019 1 2 2018 4 3 2017 2 1 - Bedbug report
- Filed May 4, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 16, 2023: a general construction order, opened August 23, 2025, awarded for $585. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
DOB records
- DOB violations
- 2 active DOB violations. The newest was issued April 25, 2023.
- DOB, all years
- 6 DOB complaints through November 14, 2026. 3 DOB violations since 1989, 1 dismissed in DOB's records.
- DOB permits
- DOB NOW lists 1 work permit here: Sidewalk Shed, issued January 24, 2024, signed off.
- Boiler inspection
- Inspected April 7, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Hearings and penalties
- Housing court
- 4 housing court cases here since 2008. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
The building report
- The city's wording on the 16 other open violations this page lists without it.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 3,460 Bronx buildings with 6 to 19 apartments.
- All 1 DOB NOW work permit, with job numbers and each job's estimated cost.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.