Skip to content
ViolationScout28 open Class C, with 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.Your building
Buildings291 East 54 Street, BrooklynCurrent through

291 East 54th St

Brooklyn, NY 11203

291 East 54th Street is a walk-up building with 6 apartments, built in 1920. It has 53 open violations, 28 of them Class C, immediately hazardous. The oldest open HPD violation was filed on November 3, 2004.

En español: 28 violaciones de Clase C abiertas (peligro inmediato) y 53 abiertas en total. La más antigua del HPD lleva 22 años abierta, desde el 3 de noviembre de 2004.

Open now, most hazardous first

  1. 28

    Class C, immediately hazardous, filed in the last 3 years

    56 open counting every year, the oldest since

    Get these certified
  2. 22

    Class B, hazardous, filed in the last 3 years

    See the 22
  3. 3

    OATH/ECB summonses still active. Most often Construction.

    See the 3

46.7 open Class C per 10 apartments. Across the city: 0.7.

Open violations are sitting, with little movement either way. 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.

The original certify-by dates on the 50 open HPD violations run from December 14, 2023 to December 1, 2026.

Zoning district
R5
Lot area
2,900 sq ft
Floor area
5,832 sq ft
Last sale
$720,000
Tax lot (BBL)
3-04702-0059
Neighborhood
East Flatbush-Rugby

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class C28 open
Notice sent19404171
§ 27-2005 HMC: Properly repair or replace the broken or defective mortise lock at entrance door to building at public hall, 1st story
Notice sent18585256
§ 27-2005 ADM CODE Properly repair the broken or defective paving concrete at front yard, 1st story
Lead PaintNotice sent18415408
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six
Lead PaintNotice sent18415222
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st window frame from south at west wall, 2nd window frame from south at west wall in the 4th room from east at south
Lead PaintNotice sent18415221
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st window frame from south at west wall in the 4th room from east at north
Lead PaintNotice sent18415220
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st window frame from east at south wall in the 3rd room from east
Lead PaintNotice sent18415219
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st window frame from east at south wall in the kitchen
Lead PaintNotice sent18415218
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) baseboard at west wall, 1st door from north at east wall, 1st door frame from north at east wall in the foyer
Lead PaintNotice sent18415217
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from west at north wall in the bathroom
Notice sent18391727
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective opened fire retardant materials plaster with exposed wood laths at, north wall to, roof bulkhead at public hall, 3rd story
Notice sent18391723
§ 27-2005 HMC: Properly repair or replace the broken or defective counter balance at, window 's lower sash , north wall, at public hall, 2nd story
Notice sent18391721
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective cracked and loose section of ceramic floor tiles at public hall, 1st story
Fire SafetyNotice sent18391720
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges at , entrance door leading to basement , under stair soffit, north wall at public hall, 1st story
Notice sent18391717
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective cracked and leaned, masonry brick at guardrail, 1st story , building front porch
Vermin / InfestationNotice sent to tenant18391715
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Vermin / InfestationNotice sent to tenant18391714
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Notice sent18391713
§ 27-2043.1 HMC Install the missing or repair/replace the defective window guard(S) in accordance with the specifications of the new york city health code section 24 RCNY chapter 12. Wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment
Notice sent18391706
§ 27-2026 ADM CODE Repair the leaky and/or defective faucets at bathtub in the bathroom
Notice sent18351802
§ 27-2005 HMC: Properly repair or replace the broken or defective heavy duty lockset at building front entrance door at public hall, 1st story
Vermin / InfestationNotice sent18351791
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice at public hall, 3rd story
Vermin / InfestationNotice sent to tenant18140346
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Vermin / InfestationNotice sent to tenant18140345
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Notice sent17378468
§ 27-2005 ADM CODE Properly repair with similar material the broken or defective ceramic tiled floor at public hall, 2nd story
Vermin / InfestationNotice sent to tenant16765175
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Vermin / InfestationNotice sent to tenant16765174
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Heat / Hot WaterNotice sent16490311
§ 27-2033 ADM CODE Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
No access to reinspect (first try)16490275
§ 27-2026 ADM CODE Repair the leaky and/or defective faucets at sink in the kitchen
Heat / Hot WaterNot complied with16490270
§ 27-2033 ADM CODE Provide ready access to buildings heating system locked basement door at boiler room
In HPD's words. Apartment numbers are left out.
Class B22 open
Notice sent18391726
Notice sent18391724
Notice sent18391722
Notice sent18391718
Notice sent18391716
Notice sent18391711
Notice sent18391709
Notice sent18391708
Notice sent18391704
Notice sent18391703
Notice sent18391702
Notice sent18391701
Notice sent18351798
Notice sent18351792
MoldNo access to reinspect (first try)18488319
Notice sent18140344
Notice sent18140342
Notice sent18140341
Notice sent18140340
Notice sent17619621
Not complied with17124993
Not complied with17124982
OATH/ECB3 open most often Construction
Construction, Class 2Hearing pending39205821J
Construction, Class 2Hearing pending39205820H
Construction, Class 2Hearing pending39205819K
Is this your building?Also for tenants and buyers
Is this your building?

3 OATH hearings starting December 2, 2026.

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

Alternative Enforcement Program
In HPD's Alternative Enforcement Program since January 31, 2017.
Open Class C, week by week
35 on September 24, 2026 and 27 on November 15.
HPD, by year
From 2017 to 2026, HPD filed 249 violations and closed 96, all classes.
YearFiledClosed
2026410
2025674
20241538
2023616
2022289
2021110
202002
2019392
2018315
20172110
HPD emergency repair orders
3 completed HPD emergency repair orders since November 27, 2023, awarded for $17,645 in total. The most recent of the 3, a general construction order, was opened January 24, 2026. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.

Hearings and penalties

OATH hearings
3 hearings scheduled on DOB summonses, the first on December 2, 2026.
OATH/ECB summonses
3 DOB summonses here since January 1, 2019, with $3,750 in penalties imposed. All 3 are still active, the same 3 listed under OATH/ECB.
  • September 28, 2026, DOB: Work without a permit. $1,250 penalty imposed.
  • September 28, 2026, DOB: Work without a permit. $1,250 penalty imposed.
  • September 28, 2026, DOB: Work without a permit. $1,250 penalty imposed.
DOF tax lien sale
Listed for DOF's 2025 tax lien sale. The last list it appeared on was the final sale list of June 2025.
Housing court
7 housing court cases here since 2014. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.

DOB records

DOB violations
7 active DOB violations, most of them for low-pressure boilers. The newest was issued November 14, 2025.
DOB complaints
3 DOB complaints in the last 12 months. The newest was filed September 28, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
DOB, all years
5 DOB complaints from 2004 through November 25, 2026. 16 DOB violations since 2002, 9 dismissed in DOB's records.
DOB permits
DOB NOW lists 1 work permit here: General Construction, issued May 15, 2026, signed off.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 291 East 54th St have open violations?

Yes. It had 53 open violations on November 25, 2026: 50 from HPD and 3 from OATH/ECB. 28 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 22 years, since November 3, 2004.

Is this building getting better or worse?

Open violations are sitting, with little movement either way. 28 open Class C, with 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction. The 180 days run to November 25, 2026.

Is this building in HPD's Alternative Enforcement Program?

Yes. In HPD's Alternative Enforcement Program since January 31, 2017. A building stays in the program until HPD discharges it.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, HPD's Alternative Enforcement Program list, OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOF's tax lien sale lists, DOB violations, HPD's housing court cases, DOB complaints, DOB NOW work permits, HPD emergency repair orders, the city's PLUTO tax-lot file and DOF's property sales records. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 291 East 54th St, Brooklyn: 6 units, 28 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 25, 2026. https://violationscout.com/building/291-east-54-street-brooklyn

How we count: /method.

Is this your building?