112 Harrison Pl, Brooklyn
- Built
- 1930
- Floors
- 3
- Residential units
- 4
- Building type
- Residence with stores or offices
- Zoning district
- M1-1
- Lot area
- 2,500 sq ft
- Floor area
- 5,250 sq ft
- Last sale
- $2,700,000
En español: 13 violaciones de Clase C abiertas (peligro inmediato) y 20 abiertas en total. La más antigua del HPD lleva 29 años abierta, desde el 16 de diciembre de 1996.
Open now, most hazardous first
- 13Get these certified
Class C, immediately hazardous
- 4See the 4
Class B, hazardous. Most often Fire Safety.
- 3See the 3
OATH/ECB summonses still active. Most often Construction.
Open violations are sitting, with little movement either way. 13 open Class C, with nothing filed or new in the last 180 days.
The original certify-by dates on the 17 open HPD violations have all passed. The latest was April 22, 2024. The report prints the date beside each one.
- Open Class C, week by week
- 13 on September 24, 2026 and 13 on October 8.
- OATH hearings
- 3 hearings scheduled on DOB summonses, the first on December 2, 2026.
- OATH/ECB summonses
- 5 DOB and FDNY summonses here since January 1, 2019, with $5,300 in penalties imposed. 3 of them are still active, the same 3 listed under OATH/ECB. 1 judgment docketed, on February 29, 2024. A docketed judgment shows up in a title search.
- September 22, 2026, DOB: Work without a permit. $1,250 penalty imposed.
- September 22, 2026, DOB: Failure to institute maintain safety equipment measures - no handrails. $2,500 penalty imposed.
- September 22, 2026, DOB: Electrical work without a permit. $1,250 penalty imposed.
The newest 3 of 5 summonses OATH lists here. The report lists all 5, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 8 active DOB violations. The newest was issued June 30, 2023.
- DOB complaints
- 1 DOB complaint in the 12 months to September 25, 2026. It was filed September 22, 2026.
- DOB permits
- 2 DOB work permits in effect. The latest, for Plumbing work, was issued September 24, 2026.
- Plumbing, issued September 24, 2026, in effect until May 1, 2027.
- General Construction, issued September 4, 2026, in effect until January 2, 2027.
- Boiler inspection
- Inspected August 27, 2026.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 13 open | ||
| Heat / Hot Water | Notice sent | 16713476 | |
| Fire Safety | Notice sent | 16713475 | |
| Fire Safety | Notice sent | 16713472 | |
| Heat / Hot Water | Notice sent | 16713471 | |
| Heat / Hot Water | Notice sent | 16713470 | |
| Fire Safety | Notice sent | 16694416 | |
| Notice sent | 16644143 | ||
| Fire Safety | Notice sent | 16644142 | |
| Heat / Hot Water | Notice sent | 16644141 | |
| Heat / Hot Water | Notice sent | 16644138 | |
| The report lists all 13, each with the city's own words and the date on its notice. What the report adds | |||
| Class B | 4 open most often Fire Safety | ||
| Fire Safety | Notice sent | 16713474 | |
| Fire Safety | Notice sent | 16713473 | |
| Fire Safety | Notice sent | 16644140 | |
| Fire Safety | Notice sent | 16644139 | |
| OATH/ECB | 3 open most often Construction | ||
| Construction, Class 2 | Hearing pending | 39205124Y | |
| Construction, Class 1 | Hearing pending | 39205123M | |
| Class 2 | Hearing pending | 39205122K | |
The full report on 112 Harrison Pl, Brooklyn
- All 20 open violations, each with the city's own words and the date on its notice.
- What each of the 2 city statuses here means, and how many of these carry it.
- How it compares with the 223,260 Brooklyn buildings with 1 to 5 apartments.
- All 2 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 5 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 3 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 112 Harrison Pl, Brooklyn, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.