386 East 94th St
Brooklyn, NY 11212
386 East 94th Street is a walk-up building with 39 apartments, built in 1927. It has 10 open violations, 8 of them Class C, immediately hazardous. The oldest open HPD violation was filed on March 1, 2026.
En español: 8 violaciones de Clase C abiertas (peligro inmediato) y 10 abiertas en total. La más antigua del HPD lleva 8 meses abierta, desde el 1 de marzo de 2026.
Open now, most hazardous first
- 8Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.
- 2See the 2
Class B, hazardous, filed in the last 3 years
2.1 open Class C per 10 apartments. Across the city: 0.7.
Certifications are being filed at least twice as fast as new violations come in. 30 certifications filed against 4 new Class C in the last 180 days.
Since November 27, 2023, certifications were filed on 67 Class C violations: 62 by the original certify-by date, 5 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 10 open HPD violations have all passed. The latest was October 5, 2026.
- Zoning district
- R6
- Lot area
- 10,000 sq ft
- Floor area
- 32,040 sq ft
- Tax lot (BBL)
- 3-04668-0020
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 8 open most often Lead Paint | ||
| Vermin / Infestation | CIV14 mailed | 19194831 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | |||
| Vermin / Infestation | CIV14 mailed | 19194406 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| Vermin / Infestation | Not complied with | 19142739 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| Not complied with | 19092537 | ||
| § 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures gas range in the kitchen | |||
| Lead Paint | Postponement granted | 18685460 | |
| § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six | |||
| Lead Paint | Defect letter sent | 18685236 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door from south at west wall, 1st door frame from south at west wall, north wall, south wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 2nd room from north at east | |||
| Lead Paint | Defect letter sent | 18685235 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame, 1st dumb waiter from west at north wall, north wall in the private hallway | |||
| Lead Paint | Defect letter sent | 18685234 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5MG/CM2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 RCNY §11-07(B)) using work practices set forth in 28 RCNY §11-06(B)(2). 1st door from north at east wall in the bathroom | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 2 open | ||
| Not complied with | 19092546 | ||
| Not complied with | 18676294 | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD vacate orders
- 2 HPD vacate orders are in effect here, all for part of the building. The latest, for part of the building, took effect November 24, 2014. Reason on the order: fire damage.
- HPD, by year
- From 2017 to 2026, HPD filed 647 violations and closed 705, all classes.
Year Filed Closed 2026 131 211 2025 53 64 2024 70 67 2023 77 59 2022 58 61 2021 79 67 2020 89 53 2019 37 27 2018 23 17 2017 30 79 - Energy benchmarking
- ENERGY STAR score 65 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 2, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 27, 2023: a general construction order, opened March 12, 2024, awarded for $250. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH/ECB summonses
- 6 DOB and FDNY summonses here since January 1, 2019, with $1,287 in penalties imposed.
- November 1, 2024, FDNY: Recordkeeping. In violation.
- November 30, 2020, FDNY: Storage, accumulation and removal of combustible material and waste. Dismissed.
- July 11, 2020, DOB: Failure to maintain building walls or appurtenances. In violation, $625 penalty imposed.
The newest 3 of 6 summonses OATH lists here.
- Housing court
- 9 housing court cases here since 2012. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 1 active DOB violation, issued November 5, 2014.
- DOB complaints
- 1 DOB complaint in the last 12 months. It was filed September 7, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 47 DOB complaints from 2003 through November 25, 2026. 8 DOB violations since 2014, 7 dismissed in DOB's records.
- Boiler inspection
- Inspected May 8, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 2 other open violations this page lists without it.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 4,017 Brooklyn buildings with 20 to 49 apartments.
- All 6 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.