Skip to content
ViolationScout4 open Class C, with 1 certification filed and 0 new Class C in the last 180 days, too few to call a direction.Your building
Buildings333 Schermerhorn Street, BrooklynCurrent through

333 Schermerhorn St, Brooklyn

BBL 3-00167-0013

Built
2014
Floors
54
Residential units
750
Building type
Elevator building
Zoning district
C6-4
Lot area
52,705 sq ft
Floor area
662,532 sq ft
Last transfer
No price recorded

En español: 4 violaciones de Clase C abiertas (peligro inmediato) y 6 abiertas en total. La más antigua del HPD lleva 5 años abierta, desde el 9 de septiembre de 2021.

Open now, most hazardous first

  1. 4

    Class C, immediately hazardous. Most often Vermin / Infestation.

    6 open counting every year, the oldest since

    Get these certified
  2. 2

    Class B, hazardous. Most often Fire Safety.

    See the 2

Open violations are sitting, with little movement either way. 4 open Class C, with 1 certification filed and 0 new Class C in the last 180 days, too few to call a direction.

Since October 12, 2023, certifications were filed on 10 Class C violations: 4 by the original certify-by date, 6 after it. How certification works

The original certify-by dates on the 6 open HPD violations have all passed. The latest was January 2, 2026. The report prints the date beside each one.

Is this your building?

4 open Class C, a facade rated SWARMP, and a temporary certificate of occupancy. The oldest open HPD violation was filed September 9, 2021.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

OATH/ECB summonses
58 DOB and FDNY summonses here since January 1, 2019, with $46,857 in penalties imposed. 21 judgments docketed, the latest on November 30, 2025. A docketed judgment shows up in a title search.
  • August 26, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms.
  • March 17, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. In violation, $935 penalty imposed.
  • March 11, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. In violation, $935 penalty imposed.

The newest 3 of 58 summonses OATH lists here. The report lists all 58, with each outcome, the penalty imposed and any docketing date. What the report adds

DOF tax lien sale
Listed for DOF's 2025 tax lien sale, for water and sewer charges only. The last list it appeared on was the 60-day notice of March 2025.
Housing court
2 housing court cases here since 2025, most of them tenant actions.
DOB complaints
1 DOB complaint in the 12 months to September 25, 2026. It was filed June 27, 2026.
DOB facade
Rated SWARMP in the latest facade report, filed September 20, 2024 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Need this filed?
DOB permits
7 DOB work permits in effect. The latest, for Sidewalk Shed work, was issued August 11, 2026.
  • Sidewalk Shed, issued August 11, 2026, in effect until November 9, 2026.
  • Mechanical Systems, issued August 3, 2026, in effect until October 28, 2026.
  • Mechanical Systems, issued July 31, 2026, in effect until October 28, 2026.

The newest 3 of 33 permits DOB NOW lists here. The report lists all 33, with job numbers and each job's estimated cost. What the report adds

Certificate of occupancy
Temporary, renewed September 22, 2026.
Energy benchmarking
ENERGY STAR score 67 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Boiler inspection
7 boilers, all inspected in 2026, the latest on April 29. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed April 29, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
Tax exemption
Has a 421-a tax exemption (DOF 2026/27 roll). DOF lists its start year as 2019.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class C4 open most often Vermin / Infestation
Fire SafetyCertified late18367137
Vermin / InfestationCertified late18175468
Vermin / InfestationCertified late17333649
Vermin / InfestationCertified late17191374
Class B2 open most often Fire Safety
Fire SafetyCertified late18367136
Fire SafetyCertified late18367135

The full report on 333 Schermerhorn St, Brooklyn

Get the report on 333 Schermerhorn St, Brooklyn, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 333 Schermerhorn Street, Brooklyn have open violations?

Yes. 333 Schermerhorn Street, Brooklyn had 6 open violations on October 10, 2026: 6 from HPD. 4 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 5 years, since September 9, 2021.

Is 333 Schermerhorn Street, Brooklyn getting better or worse?

Open violations are sitting, with little movement either way. 4 open Class C, with 1 certification filed and 0 new Class C in the last 180 days, too few to call a direction. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 333 Schermerhorn Street, Brooklyn?

Since October 12, 2023, certifications were filed on 10 Class C violations: 4 by the original certify-by date, 6 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Has 333 Schermerhorn Street, Brooklyn been in housing court?

Yes. 2 housing court cases here since 2025, most of them tenant actions. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 333 Schermerhorn Street, Brooklyn?

Yes. 1 DOB complaint in the 12 months to September 25, 2026. It was filed June 27, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

What did the latest facade report find at 333 Schermerhorn Street, Brooklyn?

Rated SWARMP in the latest facade report, filed September 20, 2024 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Are any DOB work permits in effect at 333 Schermerhorn Street, Brooklyn?

Yes. 7 DOB work permits in effect. The latest, for Sidewalk Shed work, was issued August 11, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

Does 333 Schermerhorn Street, Brooklyn have a certificate of occupancy?

Its latest certificate of occupancy is temporary, renewed September 22, 2026. A certificate of occupancy says how a building may be used and occupied. A temporary one lets people move in while work finishes and has to be renewed until DOB issues the final one. DOB's records here start in July 2012, so an older certificate may not show.

What is the ENERGY STAR score for 333 Schermerhorn Street, Brooklyn?

ENERGY STAR score 67 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

When was the boiler at 333 Schermerhorn Street, Brooklyn last inspected?

It has 7 boilers, all inspected in 2026, the latest on April 29. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 333 Schermerhorn Street, Brooklyn last file its bedbug report?

On April 29, 2026, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 333 Schermerhorn Street, Brooklyn covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 333 Schermerhorn Street, Brooklyn rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

Does 333 Schermerhorn Street, Brooklyn have a property tax exemption?

The building has a 421-a tax exemption on DOF's 2026/27 roll. DOF lists its start year as 2019. An exemption lowers a property's tax bill by reducing its assessed value.

When was 333 Schermerhorn Street, Brooklyn built?

The city's record gives 2014 as the year 333 Schermerhorn Street, Brooklyn was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator building with 54 floors.

How many apartments does 333 Schermerhorn Street, Brooklyn have?

The Department of City Planning's PLUTO tax-lot file lists 750 residential units at 333 Schermerhorn Street, Brooklyn. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH/ECB summonses from DOB and FDNY, DOF's tax lien sale lists, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOF's exemption rolls, DOB facade filings, DOB NOW work permits, DOB certificates of occupancy, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list, the city's PLUTO tax-lot file and DOF's property sales records. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own records are the authority on what is open today.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH/ECB summonses from DOB and FDNY, DOF's tax lien sale lists, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOF's exemption rolls, DOB facade filings, DOB NOW work permits, DOB certificates of occupancy, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list, the city's PLUTO tax-lot file and DOF's property sales records. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 333 Schermerhorn St, Brooklyn: 750 units, 4 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/333-schermerhorn-street-brooklyn

How we count: /method.

Is this your building?