37-30 81st St
Jackson Heights, Queens, NY 11372
37-30 81st Street is a walk-up building with 31 apartments, built in 1927. It has 31 open violations, 22 of them Class C, immediately hazardous. The oldest open HPD violation was filed on December 4, 2023.
En español: 22 violaciones de Clase C abiertas (peligro inmediato) y 31 abiertas en total. La más antigua del HPD lleva 2 años abierta, desde el 4 de diciembre de 2023.
Open now, most hazardous first
- 22Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.
- 9See the 9
Class B, hazardous, filed in the last 3 years. Most often Mold.
7.1 open Class C per 10 apartments. Across the city: 0.7.
Certifications and new violations are both coming in, neither at twice the other's rate. 18 certifications filed and 14 new Class C in the last 180 days.
Since November 16, 2023, certifications were filed on 4 Class C violations: 2 by the original certify-by date, 2 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 31 open HPD violations run from January 4, 2024 to December 7, 2026.
- Zoning district
- R7-1
- Lot area
- 9,000 sq ft
- Floor area
- 27,200 sq ft
- Tax lot (BBL)
- 4-01291-0020
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 22 open most often Lead Paint | |||
| Lead Paint | Notice sent | 19112724 | ||
| § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six | ||||
| Lead Paint | Notice sent | 19112396 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall in the foyer | ||||
| Lead Paint | Notice sent | 19112395 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall in the 4th room from north | ||||
| Lead Paint | Notice sent | 19112393 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, 1st window frame from west at north wall in the 3rd room from north | ||||
| Lead Paint | Notice sent | 19112392 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) baseboard at east wall, baseboard at west wall, 1st closet from south at west wall door frame, 2nd closet from south at west wall door frame, 3rd closet from south at west wall door frame, 4th closet from south at west wall door frame in the private hallway | ||||
| Lead Paint | Notice sent | 19112391 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the bathroom | ||||
| Lead Paint | Notice sent | 19112389 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from east at south wall, 1st window frame from north at east wall in the kitchen | ||||
| Lead Paint | Defect letter sent | 18962046 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) ceiling, south wall, east wall in the bathroom | ||||
| Not complied with | 18956353 | |||
| § 27-2005 ADM CODE Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom | ||||
| Lead Paint | Defect letter sent | 18961035 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) west wall in the foyer | ||||
| Lead Paint | Defect letter sent | 18961034 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) south wall in the 3rd room from north | ||||
| Lead Paint | Defect letter sent | 18961033 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) north wall, east wall in the 4th room from north | ||||
| Lead Paint | Defect letter sent | 18961032 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) ceiling, north wall, south wall, east wall, west wall in the bathroom | ||||
| Not complied with | 18952157 | |||
| § 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom | ||||
| Lead Paint | No access to reinspect (first try) | 18631503 | ||
| § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six | ||||
| Mold | Defect letter sent | 18611946 | ||
| Vermin / Infestation | No access to reinspect (first try) | 17928400 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Lead Paint | Not complied with | 16503238 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from east at south wall in the foyer | ||||
| Lead Paint | Defect letter sent | 16503237 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from south at west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at south | ||||
| Lead Paint | Not complied with | 16503236 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from west at north wall door frame, 2nd closet from west at north wall door frame, 1st door frame from south at west wall in the 1st room from east at north | ||||
| Lead Paint | Not complied with | 16503235 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the bathroom | ||||
| Lead Paint | Not complied with | 16503234 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from east at south wall, 1st window frame from south at west wall in the kitchen | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 9 open most often Mold | |||
| Notice sent | 19310127 | 37-30 81ST STREET, LLC | ||
| Notice sent | 19020330 | |||
| Notice sent | 19020329 | |||
| Not complied with | 18957423 | |||
| Mold | Notice sent to tenant | 19253226 | ||
| Not complied with | 18956352 | |||
| Not complied with | 18956350 | |||
| Not complied with | 18952170 | |||
| Mold | Defect letter sent | 16991311 | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 22 on September 24, 2026 and 22 on November 8, with a high of 23 on October 25.
- HPD, by year
- From 2017 to 2026, HPD filed 348 violations and closed 318, all classes.
Year Filed Closed 2026 100 253 2025 111 14 2024 63 8 2023 20 3 2022 17 3 2021 5 0 2019 3 24 2018 24 11 2017 5 2 - Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 30, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair orders
- 8 completed HPD emergency repair orders since November 16, 2023, awarded for $14,198 in total. The most recent of the 8, a general construction order, was opened July 30, 2025. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH/ECB summonses
- 1 FDNY summons here since January 1, 2019, with $700 in penalties imposed. 1 judgment docketed, on October 31, 2025. A docketed judgment shows up in a title search.
- December 11, 2024, FDNY: Recordkeeping. In violation, $700 penalty imposed.
- Housing court
- 1 open housing court case, opened August 22, 2025. 3 housing court cases here since 2005. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 1 active DOB violation, issued December 1, 2021.
- DOB, all years
- 6 DOB complaints from 1999 through November 14, 2026. 4 DOB violations since 2017, 3 dismissed in DOB's records.
- Boiler inspection
- Inspected May 7, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 10 other open violations this page lists without it.
- What each of the 5 city statuses here means, and how many of these carry it.
- How it compares with the 1,760 Queens buildings with 20 to 49 apartments.
- All 1 FDNY summons at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.