Skip to content
ViolationScout18 certifications filed and 14 new Class C in the last 180 days, neither far ahead.Your building
Buildings37-30 81 Street, QueensCurrent through

37-30 81st St

Jackson Heights, Queens, NY 11372

37-30 81st Street is a walk-up building with 31 apartments, built in 1927. It has 31 open violations, 22 of them Class C, immediately hazardous. The oldest open HPD violation was filed on December 4, 2023.

En español: 22 violaciones de Clase C abiertas (peligro inmediato) y 31 abiertas en total. La más antigua del HPD lleva 2 años abierta, desde el 4 de diciembre de 2023.

Open now, most hazardous first

  1. 22

    Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.

    Oldest open since

    Get these certified
  2. 9

    Class B, hazardous, filed in the last 3 years. Most often Mold.

    See the 9

7.1 open Class C per 10 apartments. Across the city: 0.7.

Certifications and new violations are both coming in, neither at twice the other's rate. 18 certifications filed and 14 new Class C in the last 180 days.

Since November 16, 2023, certifications were filed on 4 Class C violations: 2 by the original certify-by date, 2 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works

The original certify-by dates on the 31 open HPD violations run from January 4, 2024 to December 7, 2026.

Zoning district
R7-1
Lot area
9,000 sq ft
Floor area
27,200 sq ft
Tax lot (BBL)
4-01291-0020

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C22 open most often Lead Paint
Lead PaintNotice sent19112724
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six
Lead PaintNotice sent19112396
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall in the foyer
Lead PaintNotice sent19112395
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall in the 4th room from north
Lead PaintNotice sent19112393
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, 1st window frame from west at north wall in the 3rd room from north
Lead PaintNotice sent19112392
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) baseboard at east wall, baseboard at west wall, 1st closet from south at west wall door frame, 2nd closet from south at west wall door frame, 3rd closet from south at west wall door frame, 4th closet from south at west wall door frame in the private hallway
Lead PaintNotice sent19112391
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the bathroom
Lead PaintNotice sent19112389
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from east at south wall, 1st window frame from north at east wall in the kitchen
Lead PaintDefect letter sent18962046
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) ceiling, south wall, east wall in the bathroom
Not complied with18956353
§ 27-2005 ADM CODE Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom
Lead PaintDefect letter sent18961035
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) west wall in the foyer
Lead PaintDefect letter sent18961034
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) south wall in the 3rd room from north
Lead PaintDefect letter sent18961033
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) north wall, east wall in the 4th room from north
Lead PaintDefect letter sent18961032
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) ceiling, north wall, south wall, east wall, west wall in the bathroom
Not complied with18952157
§ 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom
Lead PaintNo access to reinspect (first try)18631503
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six
MoldDefect letter sent18611946
Vermin / InfestationNo access to reinspect (first try)17928400
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Lead PaintNot complied with16503238
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from east at south wall in the foyer
Lead PaintDefect letter sent16503237
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from south at west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at south
Lead PaintNot complied with16503236
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from west at north wall door frame, 2nd closet from west at north wall door frame, 1st door frame from south at west wall in the 1st room from east at north
Lead PaintNot complied with16503235
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the bathroom
Lead PaintNot complied with16503234
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from east at south wall, 1st window frame from south at west wall in the kitchen
In HPD's words. Apartment numbers are left out.
Class B9 open most often Mold
Notice sent1931012737-30 81ST STREET, LLC
Notice sent19020330
Notice sent19020329
Not complied with18957423
MoldNotice sent to tenant19253226
Not complied with18956352
Not complied with18956350
Not complied with18952170
MoldDefect letter sent16991311
Is this your building?Also for tenants and buyers
Is this your building?

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

Open Class C, week by week
22 on September 24, 2026 and 22 on November 8, with a high of 23 on October 25.
HPD, by year
From 2017 to 2026, HPD filed 348 violations and closed 318, all classes.
YearFiledClosed
2026100253
202511114
2024638
2023203
2022173
202150
2019324
20182411
201752
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
Bedbug report
Filed December 30, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
Rent stabilization
Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
HPD emergency repair orders
8 completed HPD emergency repair orders since November 16, 2023, awarded for $14,198 in total. The most recent of the 8, a general construction order, was opened July 30, 2025. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.

Hearings and penalties

OATH/ECB summonses
1 FDNY summons here since January 1, 2019, with $700 in penalties imposed. 1 judgment docketed, on October 31, 2025. A docketed judgment shows up in a title search.
  • December 11, 2024, FDNY: Recordkeeping. In violation, $700 penalty imposed.
Housing court
1 open housing court case, opened August 22, 2025. 3 housing court cases here since 2005. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.

DOB records

DOB violations
1 active DOB violation, issued December 1, 2021.
DOB, all years
6 DOB complaints from 1999 through November 14, 2026. 4 DOB violations since 2017, 3 dismissed in DOB's records.
Boiler inspection
Inspected May 7, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is lead paint.

Nearby buildings

Questions about this building

Does 37-30 81st St have open violations?

Yes. It had 31 open violations on November 14, 2026: 31 from HPD. 22 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 2 years, since December 4, 2023.

Is this building getting better or worse?

Certifications and new violations are both coming in, neither at twice the other's rate. 18 certifications filed and 14 new Class C in the last 180 days. The 180 days run to November 14, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, HPD's building registrations, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, the Rent Guidelines Board's stabilized-building lists, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 37-30 81st St, Queens: 31 units, 22 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 14, 2026. https://violationscout.com/building/37-30-81-street-queens

How we count: /method.

Is this your building?