En español: 17 violaciones de Clase C abiertas (peligro inmediato) y 25 abiertas en total. La más antigua del HPD lleva 11 años abierta, desde el 3 de septiembre de 2015.
Open now, most hazardous first
- 17Get these certified
Class C, immediately hazardous. Most often Lead Paint.
- 6See the 6
Class B, hazardous
- 2See the 2
OATH/ECB summonses still active
Open violations are sitting, with little movement either way. 17 open Class C, with nothing filed or new in the last 180 days.
Since October 12, 2023, certifications were filed on 15 Class C violations, all 15 by the original certify-by date. How certification works
The original certify-by dates on the 23 open HPD violations have all passed. The latest was February 9, 2026. The report prints the date beside each one.
- Open Class C, week by week
- 17 on September 24, 2026 and 17 on October 8.
- OATH/ECB summonses
- 5 DOB summonses here since January 1, 2019, with $18,360 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB. 2 judgments docketed, the latest on July 31, 2026. A docketed judgment shows up in a title search.
- December 26, 2025, DOB: Fail to comply with commissioner order to file certificate of correction with DOB. Decided by default, $6,250 penalty imposed.
- August 5, 2024, DOB: Miscellaneous violations. Decided by default, $10,000 penalty imposed.
- July 24, 2023, DOB: Electrical work without a permit. Admitted, $830 penalty imposed.
The newest 3 of 5 summonses OATH lists here. The report lists all 5, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 5 active DOB violations. The newest was issued October 16, 2024.
- Housing court
- 3 housing court cases here since 2007.
- DOB complaints
- 3 DOB complaints, 1 of them conversion complaint, in the 12 months to September 25, 2026. The newest was filed July 26, 2026.
- DOB permits
- DOB NOW lists 4 work permits here, the newest issued July 22, 2024, for Sidewalk Shed work.
- Sidewalk Shed, issued July 22, 2024, expired July 22, 2025.
- Suspended Scaffold, issued April 9, 2024, expired April 9, 2025.
- General Construction, issued March 5, 2024, expired February 3, 2025.
The newest 3 of 4 permits DOB NOW lists here. The report lists all 4, with job numbers and each job's estimated cost. What the report adds
- Energy benchmarking
- ENERGY STAR score 70 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected July 22, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed December 10, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair order
- 1 completed HPD emergency repair order since October 12, 2023: a general construction order, opened October 31, 2023, awarded for $998.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 17 open most often Lead Paint | |||
| Lead Paint | No access to reinspect (first try) | 18230515 | BRG 8409 LLC | |
| Lead Paint | No access to reinspect (first try) | 18230514 | BRG 8409 LLC | |
| Lead Paint | No access to reinspect (first try) | 18230513 | BRG 8409 LLC | |
| Lead Paint | No access to reinspect (first try) | 18230512 | BRG 8409 LLC | |
| Lead Paint | No access to reinspect (first try) | 18230511 | BRG 8409 LLC | |
| Lead Paint | No access to reinspect (first try) | 18230510 | BRG 8409 LLC | |
| Lead Paint | No access to reinspect (first try) | 18230509 | BRG 8409 LLC | |
| Lead Paint | No access to reinspect (first try) | 18230508 | BRG 8409 LLC | |
| Lead Paint | No access to reinspect (first try) | 18230507 | BRG 8409 LLC | |
| Lead Paint | No access to reinspect (first try) | 18230506 | BRG 8409 LLC | |
| The report lists all 17, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 6 open | |||
| Fire Safety | Notice sent | 18517777 | BRG 8409 LLC | |
| Mold | No access to reinspect (first try) | 18114222 | ||
| Notice sent | 18114221 | |||
| Notice sent | 17580888 | |||
| Notice sent | 17580886 | |||
| Notice sent | 16607475 | |||
| OATH/ECB | 2 open | |||
| Construction, Class 2 | Decided by default | 39171581R | BRG 8409 LLC | |
| Class 1 | Decided by default | 39120842X | ||
The full report on 84-09 Talbot St, Queens
- All 25 open violations, each with the city's own words and the date on its notice.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 672 Queens buildings with 100 to 199 apartments.
- All 4 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 5 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 2 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 84-09 Talbot St, Queens, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.