Skip to content
ViolationScout37 certifications filed against 1 new Class C in the last 180 days.Is this your building?
Buildings45 West 139 Street, ManhattanCurrent through

45 West 139th St, Manhattan

BBL 1-01737-0015

En español: 16 violaciones de Clase C abiertas (peligro inmediato) y 51 abiertas en total.

Certifications are being filed faster than new violations come in. 37 certifications filed against 1 new Class C in the last 180 days.

Since September 28, 2023, certifications were filed on 19 Class C violations, all 19 by the original certify-by date. How certification works

Is this your building?

16 open Class C.

We read every request ourselves. When a compliance firm we work with can take the building, we introduce you to that one firm. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: which violations matter, and how long this kind usually takes to clear. It is not on sale yet.

See what the report covers

HPD takes complaints from tenants through 311.

DOB violations
15 active DOB violations, most of them for low-pressure boilers. The newest was issued September 23, 2024.
DOB complaints
4 DOB complaints in the last 12 months. The newest was filed May 30, 2026.
DOB facade
Rated Unsafe in the latest facade report, filed December 23, 2024 (inspection cycle 9). Need this filed?
DOB permits
3 DOB work permits in effect. The latest, for Suspended Scaffold work, was issued March 18, 2026.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair orders
9 completed HPD emergency repair orders since September 28, 2023, awarded for $8,017 in total. The most recent of the 9, a general construction order, was opened April 27, 2026.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C16 open most often Vermin / Infestation
CIV14 mailed19191417
Vermin / InfestationDefect letter sent18639409HP SAVOY PARK II HDFC
Vermin / InfestationDefect letter sent18639408HP SAVOY PARK II HDFC
No access to reinspect (first try)18231013HP SAVOY PARK II HDFC
MoldNo access to reinspect (first try)18196210HP SAVOY PARK II HDFC
To be reinspected18153643
To be reinspected18153636
Vermin / InfestationDefect letter sent17854248
Vermin / InfestationDefect letter sent17854247
Fire SafetyNo access to reinspect (first try)17568810
Vermin / InfestationDefect letter sent17225754
Vermin / InfestationDefect letter sent17213004
Fire SafetyNo access to reinspect (first try)17204205
Lead PaintNo access to reinspect (first try)16915147
No access to reinspect (first try)16882011
Not complied with16884212
Class B28 open most often Fire Safety
Fire SafetyNotice sent19220980
Fire SafetyNotice sent19220979
Notice sent19220976
Fire SafetyCIV14 mailed19220972
Fire SafetyCIV14 mailed19220970
CIV14 mailed19191418
CIV14 mailed19174649HP SAVOY PARK II HDFC
No access to reinspect (first try)19154960HP SAVOY PARK II HDFC
No access to reinspect (first try)18231017HP SAVOY PARK II HDFC
No access to reinspect (first try)18231015HP SAVOY PARK II HDFC
No access to reinspect (first try)18231012HP SAVOY PARK II HDFC
Fire SafetyNo access to reinspect (first try)18231008HP SAVOY PARK II HDFC
Fire SafetyNo access to reinspect (first try)18231004HP SAVOY PARK II HDFC
No access to reinspect (first try)18196211HP SAVOY PARK II HDFC
Not complied with18184680
Not complied with18184679
Not complied with18184677
Not complied with18184676
Not complied with18184675
Not complied with18184674
MoldDefect letter sent18520527
MoldNo access to reinspect (first try)18352103
No access to reinspect (first try)18066716
Not complied with17900004
Not complied with17225834
Not complied with17213001
Fire SafetyNot complied with17117694
Fire SafetyNot complied with17117693
OATH/ECB7 open
Boilers, Class 2Found in violation39169597ZHP SAVOY PARK II HDFC
Elevators, Class 1Found in violation39167223PHP SAVOY PARK II HDFC
Boilers, Class 2Found in violation39165516JHP SAVOY PARK II HDFC
Construction, Class 2Found in violation39160510XHP SAVOY PARK II HDFC
Elevators, Class 2Found in violation39148540P
Local Law, Class 2Found in violation37026653N
Construction, Class 2Found in violation39524453N

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 45 West 139 Street, Manhattan have open violations?

Yes. 45 West 139 Street, Manhattan had 51 open violations on September 26, 2026: 44 from HPD and 7 from OATH/ECB. 16 are Class C, the class HPD treats as immediately hazardous.

Is 45 West 139 Street, Manhattan getting better or worse?

Certifications are being filed faster than new violations come in. 37 certifications filed against 1 new Class C in the last 180 days. That window ends September 26, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 45 West 139 Street, Manhattan?

Since September 28, 2023, certifications were filed on 19 Class C violations, all 19 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 45 West 139 Street, Manhattan have active DOB violations?

Yes. 15 active DOB violations, most of them for low-pressure boilers. The newest was issued September 23, 2024. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has DOB received complaints about 45 West 139 Street, Manhattan?

Yes. 4 DOB complaints in the last 12 months. The newest was filed May 30, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 45 West 139 Street, Manhattan marked completed?

Yes. 9 completed HPD emergency repair orders since September 28, 2023, awarded for $8,017 in total. The most recent of the 9, a general construction order, was opened April 27, 2026. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

What did the latest facade report find at 45 West 139 Street, Manhattan?

Rated Unsafe in the latest facade report, filed December 23, 2024 (inspection cycle 9). Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Are any DOB work permits in effect at 45 West 139 Street, Manhattan?

Yes. 3 DOB work permits in effect. The latest, for Suspended Scaffold work, was issued March 18, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

Is 45 West 139 Street, Manhattan covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 45 West 139 Street, Manhattan rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 45 West 139 Street, Manhattan built?

The city's record gives 1959 as the year 45 West 139 Street, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 16 floors.

How many apartments does 45 West 139 Street, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 326 residential units at 45 West 139 Street, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 26, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 45 West 139th St, Manhattan: violations, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 26, 2026. https://violationscout.com/building/45-west-139-street-manhattan

How we count: /method.

Is this your building?