Skip to content
ViolationScout9 open Class C, with 0 certifications filed and 2 new Class C in the last 180 days, too few to call a direction.Your building
Buildings47-22 45 Street, QueensCurrent through

47-22 45th St

Sunnyside, Queens, NY 11377

47-22 45th Street is a walk-up building with 6 apartments, built in 1928. It has 24 open violations, 9 of them Class C, immediately hazardous. The oldest open HPD violation was filed on January 22, 2024.

En español: 9 violaciones de Clase C abiertas (peligro inmediato) y 24 abiertas en total. La más antigua del HPD lleva 2 años abierta, desde el 22 de enero de 2024.

Open now, most hazardous first

  1. 9

    Class C, immediately hazardous, filed in the last 3 years. Most often Heat / Hot Water.

    Oldest open since

    Get these certified
  2. 15

    Class B, hazardous, filed in the last 3 years. Most often Fire Safety.

    See the 15

15.0 open Class C per 10 apartments. Across the city: 0.7.

Open violations are sitting, with little movement either way. 0 certifications filed and 2 new Class C in the last 180 days, too few to call a direction.

The original certify-by dates on the 24 open HPD violations run from February 4, 2024 to December 21, 2026.

Zoning district
R5
Lot area
2,000 sq ft
Floor area
3,975 sq ft
Tax lot (BBL)
4-00171-0042

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class C9 open most often Heat / Hot Water
Vermin / InfestationNotice sent to tenant19171142
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment
Vermin / InfestationNotice sent to tenant19171141
HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment
Fire SafetyNotice sent18817797
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges at building front entrance door from street , 1st story
MoldNotice sent to tenant18737762
§ 27-2017.3 HMC: Trace and repair the source and abate the visible mold condition... Greater than thirty square feet at ceiling and all walls in the bathroom
Heat / Hot WaterNotice sent18737759
§ 27-2033 ADM CODE Provide ready access to buildings heating system door to boiler room locked at basement
Heat / Hot WaterNotice sent18737758
§ 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment
Fire SafetyNotice sent16624672
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective 'hinge' at street entrance to building door , 1st story
Heat / Hot WaterInvalid certification16614612
§ 27-2033 ADM CODE Provide ready access to buildings heating system door locked at 1st story public hall. At boiler room
Heat / Hot WaterInvalid certification16614611
§ 27-2029 ADM CODE Provide an adequate supply of heat for the apartment in the entire apartment
In HPD's words. Apartment numbers are left out.
Class B15 open most often Fire Safety
Notice sent19344967
Notice sent19171151
Notice sent19171150
Notice sent19171149
Fire SafetyNotice sent19171148
Fire SafetyNotice sent19171147
Notice sent19171146
Notice sent19171145
Notice sent19171144
Notice sent19171143
Notice sent18737765
Notice sent18676949
Notice sent18504678
Fire SafetyNotice sent18369276
Fire SafetyNotice sent18369275
Is this your building?Also for tenants and buyers
Is this your building?

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

Open Class C, week by week
9 on September 24, 2026 and 9 on November 8.
HPD, by year
From 2017 to 2026, HPD filed 58 violations and closed 22, all classes.
YearFiledClosed
20263811
202585
202472
202320
202220
201804
201710
Rent stabilization
Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
HPD emergency repair orders
2 completed HPD emergency repair orders since November 16, 2023, awarded for $1,489 in total. The most recent of the 2, a general construction order, was opened May 4, 2026. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.

DOB records

DOB violations
6 active DOB violations, most of them for boiler filings under Local Law 62/91. The newest was issued November 14, 2025.
DOB, all years
3 DOB complaints from 2003 through November 14, 2026. 7 DOB violations since 1993, 1 dismissed in DOB's records.
Boiler inspection
Inspected August 7, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 47-22 45th St have open violations?

Yes. It had 24 open violations on November 14, 2026: 24 from HPD. 9 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 2 years, since January 22, 2024.

Is this building getting better or worse?

Open violations are sitting, with little movement either way. 9 open Class C, with 0 certifications filed and 2 new Class C in the last 180 days, too few to call a direction. The 180 days run to November 14, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, DOB violations, the Rent Guidelines Board's stabilized-building lists, HPD emergency repair orders, DOB boiler inspection reports and the city's PLUTO tax-lot file. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 47-22 45th St, Queens: 6 units, 9 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 14, 2026. https://violationscout.com/building/47-22-45-street-queens

How we count: /method.

Is this your building?