51 Argyle Rd
Brooklyn, NY 11218
51 Argyle Road is a walk-up building with 16 apartments, built in 1931. It has 27 open violations, 9 of them Class C, immediately hazardous. The oldest open HPD violation was filed on May 4, 2021.
En español: 9 violaciones de Clase C abiertas (peligro inmediato) y 27 abiertas en total. La más antigua del HPD lleva 5 años abierta, desde el 4 de mayo de 2021.
Open now, most hazardous first
- 9Get these certified
Class C, immediately hazardous, filed in the last 3 years
- 18See the 18
Class B, hazardous, filed in the last 3 years
5.6 open Class C per 10 apartments. Across the city: 0.7.
Certifications are being filed at least twice as fast as new violations come in. 12 certifications filed against 3 new Class C in the last 180 days.
Since November 16, 2023, certifications were filed on 26 Class C violations: 22 by the original certify-by date, 4 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
The original certify-by dates on the 27 open HPD violations run from January 31, 2024 to December 14, 2026.
- Zoning district
- R6A
- Lot area
- 10,000 sq ft
- Floor area
- 33,600 sq ft
- Tax lot (BBL)
- 3-05074-0040
- Neighborhood
- Flatbush-Ditmas Park-Parkville
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 9 open | |||
| Vermin / Infestation | Notice sent to tenant | 19271155 | KINYAN HOLDING CORPORATION | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Notice sent to tenant | 19238285 | KINYAN HOLDING CORPORATION | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Notice sent | 19238281 | KINYAN HOLDING CORPORATION | ||
| § 27-2026, 2027 HMC: Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north | ||||
| Lead Paint | Defect letter sent | 18777575 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) ceiling in the 4th room from north at west | ||||
| Lead Paint | Defect letter sent | 18777573 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) south wall in the foyer | ||||
| Vermin / Infestation | No access to reinspect (first try) | 18138706 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Vermin / Infestation | No access to reinspect (first try) | 18138705 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Lead Paint | Notice sent | 17332721 | ||
| § 27-2056.4 ADM CODE- correct failure to notify occupants and/or to investigate lead-based paint hazards. | ||||
| Lead Paint | Notice sent | 17332720 | ||
| § 27-2056.4(H) and 27-2056.17 ADM CODE -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities. | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 18 open | |||
| Fire Safety | Notice sent | 19271154 | KINYAN HOLDING CORPORATION | |
| Fire Safety | Notice sent | 19271153 | KINYAN HOLDING CORPORATION | |
| Notice sent | 19271152 | KINYAN HOLDING CORPORATION | ||
| Notice sent | 19271151 | KINYAN HOLDING CORPORATION | ||
| Notice sent | 19238284 | KINYAN HOLDING CORPORATION | ||
| Notice sent | 19238283 | KINYAN HOLDING CORPORATION | ||
| Notice sent | 19238282 | KINYAN HOLDING CORPORATION | ||
| Mold | Notice sent to tenant | 19330381 | ||
| Mold | Notice sent to tenant | 19330380 | ||
| Notice sent | 19033746 | |||
| Notice sent | 19033722 | |||
| Not complied with | 17939922 | |||
| Mold | Not complied with | 18116562 | ||
| Lead Paint | Notice sent | 17370758 | ||
| Lead Paint | Notice sent | 17370757 | ||
| Lead Paint | Notice sent | 17370756 | ||
| Lead Paint | Notice sent | 17370755 | ||
| Mold | Defect letter sent | 16514665 | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 15 on September 24, 2026 and 9 on November 8, with a high of 16 on October 8.
- HPD, by year
- From 2017 to 2026, HPD filed 380 violations and closed 339, all classes.
Year Filed Closed 2026 47 87 2025 43 21 2024 21 41 2023 111 53 2022 1 16 2021 48 36 2020 25 26 2019 24 14 2018 50 36 2017 10 9 - Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 4, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair orders
- 3 completed HPD emergency repair orders since November 16, 2023, awarded for $1,910 in total. The most recent of the 3, a general construction order, was opened April 9, 2026. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- DOF tax lien sale
- Listed for DOF's 2025 tax lien sale. The last list it appeared on was the 10-day notice of May 2025.
- Housing court
- 1 open housing court case, opened January 5, 2024. 10 housing court cases here since 2007. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 1 active DOB violation, issued December 1, 2024.
- DOB complaints
- 1 DOB complaint in the last 12 months, a conversion complaint. It was filed November 5, 2026. A conversion complaint, like any complaint, is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 14 DOB complaints from 2009 through November 14, 2026. 7 DOB violations since 1992, 6 dismissed in DOB's records.
- Boiler inspection
- Inspected July 16, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 18 other open violations this page lists without it.
- What each of the 5 city statuses here means, and how many of these carry it.
- How it compares with the 19,339 Brooklyn buildings with 6 to 19 apartments.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.