516 West 151st St
Manhattan, NY 10031
516 West 151st Street is an elevator building with 44 apartments, built in 1920. It has 9 open violations, 4 of them Class C, immediately hazardous. The oldest open HPD violation was filed on August 2, 2021.
En español: 4 violaciones de Clase C abiertas (peligro inmediato) y 9 abiertas en total. La más antigua del HPD lleva 5 años abierta, desde el 2 de agosto de 2021.
Open now, most hazardous first
- 4Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Vermin / Infestation.
- 2See the 2
Class B, hazardous, filed in the last 3 years. Most often Mold.
- 3See the 3
OATH/ECB summonses still active. Most often Construction.
0.9 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. 1 certification filed and 0 new Class C in the last 180 days, too few to call a direction.
Since November 27, 2023, certifications were filed on 17 Class C violations, all 17 by the original certify-by date. HPD now marks 2 of them Invalid Certification. How certification works
The original certify-by dates on the 6 open HPD violations have all passed. The latest was April 9, 2026.
- Zoning district
- R7A
- Lot area
- 4,996 sq ft
- Floor area
- 26,005 sq ft
- Tax lot (BBL)
- 1-02082-0045
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 4 open most often Vermin / Infestation | |||
| Mold | Notice sent to tenant | 18627694 | ||
| § 27-2017.3 HMC: Trace and repair the source and abate the visible mold condition... Greater than 30 sqft at ceiling and east wall in the 4th bathroom from north | ||||
| Vermin / Infestation | Invalid certification | 18627693 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Vermin / Infestation | Invalid certification | 18627692 | ||
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | ||||
| Heat / Hot Water | Notice sent | 17424355 | ||
| § 27-2031 ADM CODE Provide hot water at all hot water fixtures in the entire apartment | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 2 open most often Mold | |||
| Mold | Defect letter sent | 18652167 | ||
| Mold | No access to reinspect (first try) | 18306769 | ||
| OATH/ECB | 3 open most often Construction | |||
| Construction, Class 2 | Found in violation | 39203942R | WEST RIVER ASSOCIATES LLC | |
| Construction, Class 1 | Found in violation | 35727064Y | ||
| Local Law, Class 2 | Found in violation | 37034721X | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2017 to 2026, HPD filed 77 violations and closed 63, all classes.
Year Filed Closed 2026 28 28 2025 14 10 2024 3 1 2023 7 7 2022 4 5 2021 11 5 2020 3 0 2019 1 1 2018 2 2 2017 4 4 - Energy benchmarking
- ENERGY STAR score 100 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed May 1, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 27, 2023: a general construction order, opened March 20, 2026, awarded for $548. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH/ECB summonses
- 12 DOB and FDNY summonses here since January 1, 2019, with $22,100 in penalties imposed. 3 of them are still active, the same 3 listed under OATH/ECB. 6 judgments docketed, the latest on November 13, 2026. A docketed judgment shows up in a title search.
- September 14, 2026, DOB: Failure to maintain building in code-compliant manner. In violation, $625 penalty imposed.
- July 6, 2026, FDNY: Electrical lighting hazards. Decided by default, $1,000 penalty imposed.
- July 6, 2026, FDNY: Inspection and testing. In violation.
The newest 3 of 12 summonses OATH lists here.
- Housing court
- 6 housing court cases here since 2005. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 8 active DOB violations. The newest was issued May 2, 2026.
- DOB complaints
- 4 DOB complaints in the last 12 months. The newest was filed September 14, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 38 DOB complaints through November 25, 2026. 62 DOB violations since 1988, 10 resolved and 44 dismissed in DOB's records.
- DOB facade
- No Report Filed for inspection cycle 9. Reports in earlier inspection cycles rated it Safe with a repair and maintenance program (SWARMP) in 2009 and 2014.
- DOB permits
- 1 DOB work permit in effect, for Sidewalk Shed work, issued January 20, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- General Construction, issued January 30, 2026, signed off.
- Sidewalk Shed, issued January 20, 2026, in effect until January 20, 2027.
- Boiler Equipment, issued June 11, 2024, signed off.
The newest 3 of 8 permits DOB NOW lists here.
- Boiler inspection
- 3 boilers, inspected between January 29, 2025 and November 3, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 5 other open violations this page lists without it.
- What each of the 6 city statuses here means, and how many of these carry it.
- How it compares with the 6,540 Manhattan buildings with 20 to 49 apartments.
- All 8 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 12 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 3 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.